You are on page 1of 4

/SC

AL P
f
o us ) A
o
r Pl
ep (
ap
M
Pre-applied fully-adhered HDPE membrane with
specially developed adhesive layer can keep
performance of integral watertight bonding
to poured concrete for waterproofing and
protection of underground basement or
metro slabs and walls

TECHNICAL CHARACTERISTICS • Must be covered with concrete within 45 days of its


Mapeproof AL/SC (Plus) AP is a multilayer compound installation (lesser for extreme weather conditions)
waterproof membrane composed of strong high
density polyethylene ( HDPE) sheet, premium quality ADVANTAGES
pressure senstive adhesives, and white fine mineral • Excellent tensile strength, tear strength and
sand layers, specially developed adhesive layer can elongation performance.
keep continuous bond to post-poured concrete for
basement structure waterproofing. • Continuous bond to post-poured concrete.

WHERE TO USE • Excellent anti-impact and anti-puncture


• Municipal construction, commercial, and residential performance, not need of additional protection
building basement waterproofing with ballasted layer, reinforced concrete poured directly;
method;
• The fully new bonding techniques can keep
• Utility tunnel or culvert waterproofing project; continuous bond to post poured concrete to resist
water migration at the highest pressures.
• Metro station and open-cut excavation structure;
• Excellent chemical resistance to alkaline water from
• Special design for Damp substrate construction, but concrete slurry;
no water on the surface;
• Without screed-coat, less requirements for
• Overlap area will be sealed during rainy season or substrate, application will not be affected by damp
water pour out when appliation, avoid immersion. surface, and hold significant application advantages
during rainy season or catch the deadline.
RECOMMENDATIONS
• When long-time exposed under the sun, unless • Cold-application with pressure senstive adhesives,
concrete poured immediately, protect it with eco-friendly, and not need cement-mortar protective
suitable covering. layer, save time & cost;

• Application should be avoided during heavy rains. • Excellent weather-resistance and anti-aging;

[Additivi] 762_mapeplast r14_gb (13.12.2006 - 3ª Bozz/Ciano/PDF)


/SC
f AL ) AP
oo s TECHNICAL DATA (typical values)
epr (Plu
p
Ma
PRODUCT IDENTITY Test Method Performance

Total Thickness ASTM D 3767 1.5 mm (-10% /+10%)

Carrier Film Thickness: 1.2mm

Top surface White sand with release film

Bottom Milk white HDPE sheet

Side lap(mm) 80

End lap(mm) 120

Tensile Strength ASTM D412 ≥27±2

Elongation at break ASTM D412 ≥500%

Dimensional Stability ASTM D 836 ≤ 0.5 %

Cold flexibility at -25 °C ASTM D 1970 No cracks

Peel Adhesion to Concrete ASTM D903 ≥880 N/m

Puncture Resistance ASTM E154 ≥1000 N

Hydrostatic resistance ASTM D 5385 ≥ 70 m

UV exposure test ASTM G154 No cracks, No Bleeding

Lap peel adhesion : ASTM D 1870 ≥ 1400 N/m

Water vapor transmission : ASTM E 96/E 96M < 0.1 g/24 h.m2

Water absorption : ASTM D 570 0.5 %

Mapeproof AL/SC (Plus) AP membranes preparation include the following:


must be installed with the adhesive side
upwards and positioned so that it will be in • A smooth, uniform and clean substrate
direct contact with the structural concrete surface is essential to prevent membrane
when it is poured. Membrane overlap joints damage.
and other detailing connections are sealed
and bonded using the integral self-adhesive • The substrate should be free from oil and
strips on the membranes, and or by using the grease, dust and any other loose particles
special Mapeproof AL/SC (Plus) AP
adhesive tapes. • Large gaps and voids must be pre-filled
with sand cement mortar before the
Substrates for installation of the installation.
Mapeproof AL/SC (Plus) AP membrane
system need to have sufficient stability to • The substrate can be damp or slightly wet,
avoid movement during the installation and but ponding water must be avoided.
subsequent construction works, including the
concreting. • The substrate temperature must be above
+5°C.
• The requirements for substrate and their
Seal and bond the overlaps between the
General installation procedure: subsequent vertical sheets with their
Ensure the substrates fulfil the requirements, prefabricated self-adhesive strips.
condition of substrate and surface preparation.
Install the cut and moulded piece L-shaped For Mapeproof AL/SC (Plus) AP membrane
Mapeproof AL/SC (Plus) AP sheets, for the installation on walls, if the height is more than
perimeter edges and connections on the walls 2m, it is recommend to use fasteners (HDPE
and upstands. disk or stress plates) for temporary fastening
Connect the corner pieces with the next edge
sheets using the detailing tapes. PROTECTION, CLEANING & REPAIR
Basically it should always be a clear goal to
Lay out the Mapeproof AL/SC (Plus) AP prevent any damages and soiling on the
membranesheets in the area (horizontal or installed Mapeproof AL/SC (Plus) AP
vertical) using standard width rolls and bond membrane system for further cleaning or repair
the sheets together using the self-adhesive works to be necessary.
strips lengthways and using the detailing tapes
for transverse joints. The installed Mapeproof AL/SC (Plus) AP
membrane system has to be protected
Form all of the necessary details, such as pipe temporarily in order to:
penetrations, connections, sumps or lift pits, • prevent soiling from other work or weather
pile caps, expansion joints and any others that on site;
are required using the appropriate accessory • prevent any damages that could be caused
products and other compatible during installation of steel reinforcement or
other trades ;
Mapei waterproofing solutions. • protect the membrane from weathering (e.g.
After the installation is completed inspect the UV exposure)
installed Mapeproof AL/SC (Plus) AP
membrane system to check all the overlap PACKAGING
joints, connections and details, to ensure they Supply in 1.2 m width X 20 m length (or as per
are correctly installed. customer requirement), and packed into plastic
bag.
After the reinforcement is fixed and before the
concrete is poured a finally inspection is STORAGE
recommended to check if there is any damage
Mapeproof AL/SC (Plus) AP can be stored for
or anything that could negatively influence the
12 month from the date of manufacturing. Keep
full bond (e.g. separation/protection layers) of
the products in a dry place, away from direct
the Mapeproof AL/SC (Plus) AP system to the
sunlight. Do not place the pallets, one on top of
structural concrete.
another and the rolls must always be stocked in
a vertical position. The contact with solvents
After removing the formwork all penetrations
and organic liquids may damage the product.
(such as tie-bars), any construction or
Cover as necessary to protect rolls from
expansion joints, plus any membrane damage
environmental damage, heat, cold or moisture
has to be sealed using the appropriate
etc.
accessories or complementary Mapei
waterproofing solution, e.g. Plastimul PU W,
Avoid application if the temperature is
Mapeproof Swell, Planigrout 300,
excessively low or high, avoid stamping (shoes
Adesilex PG 2 SP
with crampons, small objects or sharp edges).
After removing the formwork the
SAFETY INSTRUCTIONS FOR
Mapeproof AL/SC (Plus) AP membrane
PREPARATION AND APPLICATION
system has to be inspected and repaired if any
Mapeproof AL/SC (Plus) AP is an article and
damage has occurred. Finally the membrane
referring to the current regulations does not
has to be protected within the defined limited
require the preparation of the Safety Data
exposure period.
Sheet. During use it is recommended to wear
gloves and goggles and follow the safety
Before backfilling the structure, the
requirments of the workplace.
Mapeproof AL/SC (Plus) AP membrane has to
be protected.
PRODUCT FOR PROFESSIONAL USE
Sheets applied in vertical directions
WARNING
Connection of slabs to walls using standard
Mapeproof AL/SC (Plus) AP membranes: Although the technical details and
Cut the overlaps of the vertical membrane recommendations contained in this product
sheets in a straight line, align the membrane data sheet correspond to the best of our
properly to fix the jointing tape properly . knowledge and experience, all the above
Seal and bond the horizontal overlaps with the information must, in every case, be taken as
detailing tapes, using external double sided self merely indicative and subject to confirmation
adhesive tapes after long-term practical application; for this
reason, anyone who intends to use the
/SC
f AL ) AP
oo s
epr (Plu product must ensure beforehand that it is
p installation.
Ma suitable for the envisaged application. In The most up-to-date TDS can be
every case, the user alone is fully responsible downloaded from our website www.
for any consequences deriving from the use mapei.com.
of the product. ANY ALTERATION TO THE WORDING
OR REQUIREMENTS CONTAINED OR
Please refer to the current version of the DERIVED FROM THIS TDS EXCLUDES
Technical Data Sheet, available from our THE RESPONSIBILITY OF MAPEI.
website www.mapei.com

LEGAL NOTICE
The contents of this Technical Data Sheet
(“TDS”) may be copied into another All relevant references
project-related document , but the for the product are available
resulting document shall not supplement upon request and from
or replace requirements per the TDS in www.mapei.com
force at the time of the MAPEI product

Any reproduction of texts, photos and illustrations published


here is prohibited and subject to prosecution

You might also like