BAJA TULANGAN POLOS BAJA TULANGAN ULIR

Luas
Luas Diameter
Diameter Berat Baja Ulir Penampa
Penampang Koreksi
ng
(Mm) (Cm2) (Kg/m) (Mm) (Cm2)
4.5 0.1590 0.125 D 10 10 0.7854
5 0.1963 0.154 D 13 13 1.3273
5.5 0.2376 0.187 D 16 16 2.0106
6 0.2827 0.222 D 19 19.1 2.8652
6.8 0.3632 0.285 D 22 22.2 3.8708
7 0.3848 0.302 D 22 22.2 3.8708
8 0.5027 0.395 D 25 25.4 5.0671
8.5 0.5675 0.445 D 29 29 6.6052
9 0.6362 0.499 D 32 32 8.0425
10 0.7854 0.617 D 35 30 7.0686
12 1.1310 0.888 D 38 38.1 11.4009
13 1.3273 1.042
14 1.5394 1.208
15 1.7671 1.387
16 2.0106 1.578
18 2.5447 1.998
19 2.8353 2.226
20 3.1416 2.466
22 3.8013 2.984
25 4.9087 3.853
26 5.3093 4.168
28 6.1575 4.834
30 7.0686 5.549
32 8.0425 6.313
34 9.0792 7.127
35 9.6211 7.553
36 10.1788 7.990
38 11.3411 8.903
40 12.5664 9.865
42 13.8544 10.876
44 15.2053 11.936
46 16.6190 13.046
48 18.0956 14.205
AN ULIR

Berat

(Kg/m)
0.617
1.042
1.578
2.249
3.039
3.039
3.978
5.185
6.313
5.549
8.950
NO. ALAT SATUAN HARGA SATUAN KETERANGAN

1 BULLDOZER 100.00 110 Hp


2 MOTOR GRADER 100.00 110 Hp
3 CRUSHER/SCR 30 T/H 100.00 30 T/jam - 185 Hp
4 SCREENING PLANT 100.00 -
5 LOADER WHEELED 100.00 115.0 Hp
6 ROLLER, 3 WHEELED 100.00 6 - 8 Ton
7 ROLLER, TANDEM 100.00 6 - 8 Ton
8 ROLLER, VIBR. SELF-P6-7T 100.00
9 ROLLER, PNEUMATIC 100.00 6 - 15 Ton
10 ROLLER, VIBR. PED 1 TONE 100.00 1 Ton
11 TAMPER, VIBR. PLATE 100.00 4 Hp
12 CONCRETE VIBRATOR 100.00 -
13 SPRAYER, SELFPROP 100.00 1,000.0 Liter
14 ASP. SPRAYER, TOWED 100.00 6.0 Ton
15 ASP. MIXING PLANT 30 T/H 100.00 30 T/jam
16 ASPHALT FINISHER 100.00 1820 mm / 30 Hp
17 WATER TANK TRUCK 100.00 4,000.0 Liter
18 TRAILER, TOWED 100.00 10.0 Ton
19 DUMP TRUCK 3.5 T 100.00 3.5 Ton
20 DUMP TRUCK 5 T 100.00 5 Ton / 145 Hp
21 FLATBED TRUCK 3.5 T 100.00 3,5 Ton / 115 Hp
22 FLATBED TRUCK WITH CRANE 100.00 -
23 CONCRETE MIXER 0.125 M3 100.00 125 Liter
24 COMPRESSOR, AIR 100.00 210 M3/jam
25 PUMP, WATER (5 CM) 100.00 30 M3/jam
26 CONCRETE MIXER 0.25 M3 100.00 250 Liter
27 CONCRETE MIXER 0.5 M3 100.00 500 Liter
28 BLOWER 100.00 -
29 MESIN CUTTER CONCRETE 100.00 Jam/m
30 JACK HAMMER 100.00 Jam/m
31 TOTAL STATION Hr 100.00 Jam/m
ANALISA HARGA SATUAN PEKERJAAN
#REF!

TABEL HARGA SATUAN UPAH


TAHUN
HARGA
NO SATUAN
SATUAN (Rp.)

1 Pekerja OH 100.00
2 Kepala Tukang OH 100.00
3 Tukang OH 100.00
4 Mandor OH 100.00
5 Tukang Listrik OH 100.00
6 Tukang Kayu OH 100.00
7 Tukang Batu OH 100.00
8 Tukang Besi OH 100.00
9 Tukang Cat OH 100.00
10 Tukang Plitur OH 100.00
11 Tukang Jalan OH 100.00
12 Tukang Alumunium OH 100.00
13 Tukang Gali OH 100.00
14 Tukang Masak Aspal OH 100.00
15 Tukang Leideng OH 100.00
16 Masinis OH 100.00
17 Pembantu Masinis OH 100.00
18 Penjaga Api OH 100.00
19 Penjaga Malam OH 100.00
20 Sopir OH 100.00
21 Pembantu Sopir OH 100.00
22 Tukang las OH 100.00
23 Fitter OH 100.00
24 Helper OH 100.00
25 Operator Alat berat OH 100.00
26 Surveyor Geodesi OH 100.00

Page 6 of 95
TABEL HARGA BAHAN BANGUNAN I (RAB)
TAHUN

HARGA SATUAN (Rp.) HARGA SATUAN (Rp.)


NO SATUAN
RAB RAP

A AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA


1 Pasir Urug m3 277,750.00 250,000.00
2 Sirtu m3 325,000.00 200,000.00
3 Pasir Teras m3 277,750.00 150,000.00
4 Pasir Pasang m3 347,188.00 150,000.00
5 Pasir Beton m3 347,188.00 300,000.00
7 Pasir Silika kg 100.00 300.00
8 Koral Beton Kali (m3) m3 420,000.00 300,000.00
9 Koral Beton Kali (kg) kg 420,000.00 166.67
10 Abu Batu m3 100.00 163,400.00
Bubuk Batu Granit kg 100.00
Bubuk Traso kg 100.00
11 Batu Gosok (Apung) kg 100.00 13,072.00
12 Batu Pecah Mesin 1/2 m3 425,000.00 245,475.00
13 Batu Pecah Mesin 2/3 m3 425,000.00 245,475.00
14 Batu Pecah Mesin 3/5 m3 405,000.00 245,475.00
15 Batu Pecah Mesin 5/7 m3 390,000.00 245,475.00
16 Batu Belah Pondasi 15 cm / 20 cm m3 490,000.00 173,474.00
17 Batu Bronjol (Untuk Bronjong) m3 420,000.00 196,000.00
18 Batu Koral Beton Kali m3 420,000.00 108,900.00
19 Batu Tempel Hitam m2 100.00 136,100.00
20 Batu Pinggir Beton 10x20x35 bh 100.00 14,900.00
21 Batu Pinggir Beton 15x35x50 (K-225) bh 100.00 44,600.00
22 Batu Telor m3 100.00 92,600.00
23 Batu Granit kg 100.00 600.00
24 Batu Teraso kg 100.00 300.00
25 Batako Kecil 8x10x20 bh 100.00 600.00
26 Batako Besar 8x20x30 bh 100.00 2,500.00
27 Conblok HB20 bh 100.00 3,300.00
Conblok HB15 bh 100.00
Conblok HB10 bh 100.00
29 Bata Merah (rata-rata) bh 100.00 400.00
30 Bata Berongga Expose bh 100.00 800.00
31 Bata Rooster (12 x 11 x 24) cm bh 100.00 3,600.00
32 Bata Merah Oven (Klingker) bh 100.00 1,600.00
Bata Ringan tebal 7,5 cm bh 100.00
Bata Ringan tebal 10 cm bh 100.00
33 Roster Beton 20x20 bh 100.00 5,400.00
34 Roster Beton 30x30 bh 100.00 13,100.00
35 Glass Blok 20x20 bh 100.00 12,600.00
36 Glass Blok 30x45 bh 100.00 13,600.00
37 Paving Blok Natural 8 cm m2 100.00 43,600.00
38 Paving Blok Warna 8 cm m2 100.00 59,900.00
39 Paving Blok Natural 6 cm m2 100.00 40,300.00
40 Paving Blok Warna 6 cm m2 100.00 46,800.00
Paving Blok m' 100.00
42 Semen PC /50 kg zak 100.00 65,000.00
43 Semen Putih zak 100.00 65,500.00
Semen Mortar Bata Ringan (Rata-rata)/40 Kg zak 100.00
44 Kanstin Jalan Ukuran Besar (Bina Marga) 1 bh = 60 cm bh 100.00 23,400.00
45 Ready Mix Beton K300, tanpa pompa (Selang) m3 100.00 681,700.00
46 Ready Mix Beton K225, tanpa pompa (Selang) m3 100.00 658,800.00
47 Ready Mix Beton K175, tanpa pompa (Selang) m3 100.00 631,600.00
48 Concrete Integral Waterproofing kg 100.00 113900
49 Waterstop, lebar 150 mm m' 100.00 123000
50 Waterstop, lebar 200 mm m' 100.00 163900
51 Waterstop, lebar 320 mm m' 100.00 301700
52 Kapur Pasang/Kapur Tembok m3 100.00 92600
53 Kapur Sirih kg 100.00 8700
54 Kapur Padam m3 100.00 133700
55 Semen Merah m3 100.00 99000
56 Semen Warna kg 100.00 5400
57 Tanah Liat m3 100.00 83000
58 Air Liter 100.00 4600
59 Strorox-100 kg 100.00

Page 7 of 95
0
B BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok kg 100.00 15200
2 Cat Tembok ICI Eksterior (Beton) kg 100.00 78400
3 Cat Tembok ICI Interior (Plafond dan Dinding) kg 100.00 59900
4 Cat Tembok Vinilex kg 100.00 15900
5 Cat Dasar ICI untuk Interiior (2 pelapis) ltr 100.00 45700
6 Cat Tembok Sanlex kg 100.00 12000
7 Cat Tahan Asam kg 100.00 32700
8 Pelapis Alkali ICI (Cat Dasar Beton Eksterior) ltr 100.00 41400
9 Cat Marka/Spotlight kg 100.00 56100
10 Water Proofing Emulsion kg 100.00 55300
11 Water Proofing Membrane m2 100.00 78400
12 Pool Cat Tembok bh 100.00 13100
13 Kape Tembok bh 100.00 6500
14 Kape Kayu bh 100.00 5000
15 Soligneum 1 Blok 5 ltr 100.00 32700
16 Flincote kg 100.00 30500
17 Pengawetan Kayu m3 100.00 255900
18 Pengovenan Kayu m3 100.00 402900
19 Kuas 3" bh 100.00 9300
20 Oker kg 100.00 32700
22 Oten (Pewarna Plitur) bks 100.00 1600
23 Spiritus ltr 100.00 13100
24 Bahan Plitur Kripik (Sirlak India) kg 100.00 92600
25 Plitur Jadi ltr 100.00 39900
26 Vernis kg 100.00 51200
27 Dempul Lain kg 100.00 8500
28 Dempul Plitur kg 100.00 28300
29 Dempul Halus/Impra (Wood Filler) kg 100.00 30500
30 Plamir kg 100.00 34200
31 Terpentin ltr 100.00 7600
32 Tinner A ltr 100.00 18500
33 Tinner B ltr 100.00 21800
34 Kompound kg 100.00 29400
35 Melamik kg 100.00 50600
36 Dempul Plastik kg 100.00 29400
37 Dempul Duco kg 100.00 42500
38 Amplas lbr 100.00 2800
39 Dempul Kayu Cap Kucing kg 100.00 20700
40 Meni Kayu/Besi kg 100.00 25000
41 Sincromat kg 100.00 23400
42 Cat Kayu Sieve kg 100.00 43600
43 Cat Besi Sieve kg 100.00 43600
44 Cat Besi Duco Danaglos/ICI kg 100.00 87100
45 Cat Bronze kg 100.00 38100
46 Teak Oil ltr 100.00 51200
47 Sabun kg 100.00 9900
48 Cotton Plaster bh 100.00 18000

0
C BAHAN KAYU BERIKUT BAHAN JADINYA
1 Bambu dia. 5 s/d 7 btg 100.00 18500
2 Bambu dia. 7 s/d 10 btg 100.00 23400
3 Bambu Gombong btg 100.00 29400
4 Kayu Papan Tarentang m3 100.00 1415700
5 Kayu Kamper Singkil/Kapur (K. Samarinda Klas II) m3 100.00 8276400
6 Kayu Balok Borneo Super m3 100.00 4138200
7 Kayu Papan Borneo Super m3 100.00 4247100
8 Kayu Balok Kamper Medan (Kruing) m3 100.00 5445000
9 Kayu Papan Kamper Medan (Kruing) m3 100.00 6316200
10 Kayu Balok Kamper Banjar m3 100.00 7078500
11 Kayu Papan Kamper Banjar m3 100.00 7840800
12 Kayu Balok Kamper Samarinda m3 100.00 8929800
13 Kayu Papan Kamper Samarinda m3 100.00 10781100
14 Kayu Balok Rasamala m3 100.00 2540200
15 Kayu Jati Jatim/Jateng tua dia. 70 cm m3 100.00 21780000
16 Kayu Jati Jatim/Jateng tua dia. 40 cm m3 100.00 16988400
17 Kayu Jati Jabar tua dia. 40 cm m3 100.00 10345500
18 Kayu Jati Jabar tua dia. 40 cm kebawah m3 100.00 9256500
19 Kayu Hutan Klas I (Segeng, Mahoni, Laban) m3 100.00 2994800
20 Kayu Albasia m3 100.00 653400
21 Dolken 5 s/d 7 btg 100.00 16300
22 Dolken 7 s/d 10 btg 100.00 25900
23 Kayu Balok Kelas I m3 100.00
24 Kayu Balok Kelas II atau III m3 100.00
25 Kayu Kaso Kelas I m3 100.00
26 Kayu Kaso Kelas II m3 100.00
27 Kayu Papan Kelas I m3 100.00
28 Kayu Papan Kelas II m3 100.00
29 Kayu Papan Kelas III m3 100.00
30 Kayu Kaso 4/6-5/7 m3 100.00

Page 8 of 95
32 Lis profil kamper 1x1 cm m3 100.00 4400
33 Lis profil kamper 2x1 cm m3 100.00 4100
34 Lis profil kamper 4x1 cm m3 100.00 9300
35 Lis profil kamper 5x1 cm m3 100.00 10900
36 Lis profil kamper 10x1,5 cm m3 100.00 26100
37 Pegangan Tangga Profil Jati m3 100.00 140200
38 Pegangan Tangga Profil Kamper m3 100.00 61000
39 Kayu Reng 2/3 Borneo Super m3 100.00 2600
40 Kayu Reng 2/3 Kamper Banjar m3 100.00 4100
41 Kayu Reng 3/4 Kamper Banjar m3 100.00 8700
Kayu Kaso 5/7 m3 100.00

0
D BAHAN PENUTUP RANGKA PLAFOND
1 Bahan Plafond Eternit 4 mm (Bola Dunia) m2 100.00 12800
2 Bahan Plafond Harflex 5 mm 120x240 lbr 100.00 52300
3 Bahan Plafond Asbes Semen 5 mm m2 100.00 16300
4 Gypsum 120x240 t=9mm Ex. DN (Jayaboard) lbr 100.00 65300
5 Gypsum 120x240 t=9mm Ex. Luar lbr 100.00 76200
6 Akustik Amstrong 60x120 lbr 100.00 95800

0
E BAHAN KAYU LAPIS
1 Tripleks 3 mm 120x240 lbr 100.00 43600
2 Tripleks 4 mm 120x240 lbr 100.00 56600
3 Tripleks 4 mm ukuran pintu lbr 100.00 34800
4 Tripleks 6 mm 120x240 lbr 100.00 81700
5 Tripleks 9 mm 120x240 lbr 100.00 104500
6 Jabar Wood 4 mm lbr 100.00 76200
7 Bilik Bambu (tanpa kulit) m2 100.00 16200
8 Bilik Bambu (dengan kulit) m2 100.00 19600
9 Bilik Bambu Hitam Variasi (Motif) m2 100.00 27800
10 Wall Paper (Kelas Menengah) m2 100.00 30500
11 Multipleks 9 mm 120x240 lbr 100.00 119800
12 Multipleks 12 mm 120x240 lbr 100.00 161200
13 Multipleks 18 mm 120x240 lbr 100.00 202600
14 Plywood 18 mm 120x240 lbr 100.00 212400
15 Teakwood 3 mm 120x240 lbr 100.00 92600
16 Teakwood 4 mm 120x240 lbr 100.00 106700
17 Teakwood 3 mm ukuran pintu lbr 100.00 68600
18 Teakwood 4 mm ukuran pintu lbr 100.00 76200
19 Gypsum Board 9 mm Elephant lbr 100.00 79500
20 Tacon (tahan bakar) m2 100.00 84900
21 Supercon m2 100.00 52300
22 Melamin 4 mm120x240 lbr 100.00 79500
23 Melamin TOK 4 mm lbr 100.00 81700
24 Formika 120x240 lbr 100.00 141600
25 Formika ukuran pintu lbr 100.00 98000

0
F BAHAN LANTAI DAN PELAPIS DINDING
1 Tegel PC 20x20 bh 100.00 1400
2 Plin Tegel PC 10x20 bh 100.00 1400
3 Tegel PC 30x30 bh 100.00 2000
4 Plin Tegel PC 10x30 bh 100.00 1400
5 Tegel PC 40x40 bh 100.00 4000
6 Plin Tegel PC 10x40 bh 100.00 1700
7 Tegel Warna 20x20 bh 100.00 2000
8 Plin Tegel Warna 10x20 bh 100.00 3300
9 Tegel Warna 30x30 bh 100.00 3300
10 Plin Tegel Warna 10x30 bh 100.00 3000
11 Tegel Warna 40x40 bh 100.00 5000
12 Plin Tegel Warna 10x40 bh 100.00 2200
13 Tegel Wafel PC 20x20 bh 100.00 2000
14 Tegel Wafel Warna 20x20 bh 100.00 2000
15 Tegel Badak PC 30x30 bh 100.00 2400
16 Porselen 11x11 Warna Standard DN m2 100.00 39800
17 Porselen 11x11 Warna Khusus DN m2 100.00 45700
25 Vynil Lantai Standard m2 100.00 23400
26 Karpet Klas Baik LN m2 100.00 528200
27 Karpet Klas Sedang LN m2 100.00 272300
28 Underlayer m2 100.00 102500
29 Stairnosing Keramik 10/20 bh 100.00 9400
30 Stairnosing Fiber m' 100.00 15000
32 Plin Teraso 10x30 bh 100.00 6500
33 Granit Alam LN Uk. Besar m2 100.00 1579100
34 Granit Alam LN Uk. Kecil m2 100.00 1361300
35 Granit Alam DN Uk. Besar m2 100.00 1050900
36 Granit Alam DN Uk. Kecil m2 100.00 1013300
37 Granit Tile 40x40 m2 100.00 287500
39 Keramik (rata-rata) m2 100.00 822200

Page 9 of 95
43 Ubin Teralux (rata-rata) m2 100.00 105600
45 Granito Tile (rata-rata) m2 100.00 204200
46 Parquet m2 100.00 284600
47 Gym Flooring m2 100.00 113900
49 Campuran untuk kedap air ltr 100.00 25600
Ubin Abu-abu m2 200.00
Ubin Warna m2 200.00

G BAHAN SALURAN AIR KOTOR/BERSIH


1 Grafel U 20 cm' m' 100.00 28300
2 Grafel U 30 cm' m' 100.00 35700
3 Grafel U 40 cm' m' 100.00 43600
4 Buis Beton dia. 20 cm (1m') m' 100.00 34300
5 Buis Beton dia. 30 cm (1m') m' 100.00 49000
6 Buis Beton dia. 40 cm (1m') m' 100.00 60400
7 Buis Beton dia. 50 cm (1m') bh 100.00 99600
8 Buis Beton dia. 60 cm (1m') bh 100.00 122000
9 Buis Beton dia. 100 cm (0,5m') bh 100.00 98000
10 Buis Beton dia. 80 cm (0,5m') bh 100.00 163400
11 Buis Tanah dia. 10 cm (0,5m') bh 100.00 7100
12 Buis Tanah dia. 15 cm (0,5m') bh 100.00 9300
13 Buis Tanah dia. 20 cm (0,5m') bh 100.00 10600
14 Buis Tanah dia. 25 cm (0,5m') bh 100.00 13600
15 Injuk kg 100.00 7600

0
H BAHAN LOGAM DAN BAHAN JADINYA
1 Besi Beton U-24 Rata-rata kg 100.00 15263
2 Besi Beton U-39/U-32 Rata-rata kg 100.00 20000
3 Pagar BRC Lengkap Tiang (Tanpa Pondasi) m2 100.00 131800
4 Bondek m2 100.00 34300
5 IWF Ex. DN SII kg 100.00 12000
6 IWF Ex. Jepang kg 100.00 9000
7 Besi Profil DN SII kg 100.00 9000
8 HB 250 kg 100.00 15000
9 HB 200 kg 100.00 14850
10 Besi Profil Ex. LN kg 100.00 9000
11 Besi C Lip Channel kg 100.00 9000
12 Besi Plat SM490 kg 100.00 8500
13 Ongkos Galvanis Besi kg 100.00 3800
14 Kawat Beton kg 100.00 18400
15 Kawat Duri m' 100.00 4200
16 Kawat Duri kg 100.00 9600
17 Kawat Pengikat m' 100.00 1800
18 Kawat Bronjong 4 mm kg 100.00 18500
19 Besi Hallow ( 2 x 4 x 4 mm ) btg 100.00 25000
Besi Hallow ( 50 x 50 x 3 mm ) btg 100.00
20 Besi Hallow ( 4 x 4 cm ) btg 100.00 32200
21 Kawat Tembaga kg 100.00 26100
22 Ram Nyamuk Hijau m2 100.00 13100
23 Ram Kawat 1x1cm m2 100.00 16300
24 Ram Ayam m2 100.00 10900
25 Kawat Kasa 1x1cm (Putih) m2 100.00 25000
26 Kawat Harmonika 4 cm m2 100.00 21800
27 Kawat Harmonika 2 cm m2 100.00 34800
28 Kawat Las Listrik kg 100.00 25000
29 Wiremesh M (rata-rata) m2 100.00 70800
31 Timah kg 100.00 32300
32 Timah Hitam kg 100.00 27200
33 Ram Nyamuk Aluminium m2 100.00 27200
34 Plat Strip uk. 2x30 mm (6 m) btg 100.00 32700
35 Plat Strip uk. 3x30 mm (6 m) btg 100.00 43100
36 Plat Aluminium 0,2 mm m2 100.00 18000
37 Plat Aluminium 0,3 mm m2 100.00 25600
38 Plat Aluminium 0,4 mm m2 100.00 32300
39 Plat Aluminium 0,5 mm m2 100.00 39800
40 Plat Aluminium 0,6 mm m2 100.00 56200
41 Plat Aluminium 1,0 mm m2 100.00 84900
42 Kusen Aluminium Natural 1,3 mm t=103 mm (4") m' 100.00 166500
43 Kusen Aluminium Warna 1,3 mm t=103 mm (4") m' 100.00 179500
44 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 3 " ) m1 100.00 89100
45 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 3 " ) m1 100.00 112200
46 Daun Jendela Aluminium Natural (tanpa Kaca dan Accessories) m2 100.00 78000
47 Daun Jendela Aluminium Warna (tanpa Kaca dan Accessories) m2 100.00 112200
48 Daun Pintu Aluminium Natural (tanpa Kaca dan Accessories) m2 100.00 233000
49 Daun Pintu Aluminium Warna (tanpa Kaca dan Accessories) m2 100.00 211800
50 Handle Aluminium (Tarikan Pintu Aluminium) bh 100.00 72400
51 Kait Angin Aluminium ps 100.00 53400
52 Karet Assesories Kusen/Pintu Aluminium m' 100.00 3800
53 Aluminium Foil m2 100.00 13700

Page 10 of 95
54 Jendela Besi m2 100.00 1127100
55 Jendela Besi Tahan Api m2 100.00 2254200
56 Pintu Gulung Besi m2 100.00 375700
57 Pintu Besi Baja m2 100.00 1127100
58 Sunscreen Aluminium m2 100.00 409900
59 Rolling Door Bahan Besi m2 100.00 273200
60 Rolling Door Bahan Aluminium m2 100.00 341600
61 Folding Gate m2 100.00 396200
62 Vertical Blind m2 100.00 150300
63 Teralis Besi m2 100.00 286900
64 Seng Plat BJLS 30 uk. 60 cm m' 100.00 34800
65 Seng Plat BJLS 30 uk. 90 cm m' 100.00 49000
66 Seng BJLS 0,2 Gelombang P = 180 cm lbr 100.00 60300
67 Seng BJLS 0,2 Gelombang P = 210 cm lbr 100.00 70600
68 Plat Besi Tipis 1,2 mm kg 100.00 18500
69 Plat Besi Tipis 0,8 mm kg 100.00 22900
70 Plat Besi 2 mm s/d 5 mm kg 100.00 14200
71 Plat Besi 6 mm s/d 10 mm kg 100.00 15800
72 Plat Besi 10 mm ke atas kg 100.00 15200
73 Lem Kuning (Aibond) kg 100.00 38100
74 Lem Fox kg 100.00 35900

0
I BAHAN KACA
1 Kaca Polos 2 mm (ASAHI) m2 100.00 38100
2 Kaca Polos 3 mm (ASAHI) m2 100.00 43600
3 Kaca Polos 5 mm (ASAHI) m2 100.00 122100
4 Kaca Polos 8 mm (ASAHI) m2 100.00 142300
5 Kaca Buram 12 mm m2 100.00 170800
6 Kaca Rayban 5 mm (ASAHI) m2 100.00 87100
7 Kaca Rayban 8 mm (ASAHI) m2 100.00 254600
8 Kaca Rayban 12 mm (ASAHI) m2 100.00 408400
9 Kaca Cermin 5 mm m2 100.00 142300
10 Kaca Cermin 6 mm m2 100.00 284600
11 Kaca Cermin 8 mm m2 100.00 398500
12 Kaca Wireglass 5 mm m2 100.00 170800
13 Kaca Patri Lokal Terpasang (ASAHI) m2 100.00 719300
14 Kaca Patri Ex. LN Terpasang m2 100.00 1769600
15 Kaca 8 mm Grafir m2 100.00 1050900
16 Glass Blok DN 20x20 (Kedaung) bh 100.00 26100
17 Glass Blok 20x20 Ex. LN bh 100.00 42500
18 Jendela Nako m2 100.00 286000
19 Sealant tube 100.00 28500

0
J BAHAN PAKU DAN MUR BAUT
1 Paku 1 cm s/d 3 cm kg 100.00 22000
2 Paku 4 cm s/d 7 cm kg 100.00 18000
3 Paku 8 cm s/d 12 cm kg 100.00 17000
4 Paku Beton 2 cm s/d 5 cm bh 100.00 500
Paku Seng kg 100.00 0
Paku Tripleks kg 100.00
5 Paku Skrup kg 100.00 17300
6 Paku Kait Lengkap bh 100.00 800
7 Paku Cacing kg 100.00 28300
8 Paku GRC kg 100.00 38500
9 Paku Gypsum kg 100.00 18500
10 Paku fixer bh 100.00 500
11 Ramset/Dynabolt (rata-rata) bh 100.00 8000
12 Besi Beugel Kuda-kuda kg 100.00 18500
13 Duk Angker bh 100.00 3800
14 Angker Mur Baut dia. 19 panjang 60 cm bh 100.00 36500
15 Mur Baut HTB dia. 16 s/d 19 (5 cm) bh 100.00 10400
16 Mur Baut HTB dia. 16 s/d 19 (15 cm) bh 100.00 8000
17 Fisher uk. 12 s/d 20 cm bh 100.00 4900

0
K BAHAN PERPIPAAN
1 Besi Pipa untuk Hydrant BSP dia. 1" btg 100.00 119800
2 Besi Pipa untuk Hydrant BSP dia. 1,25" btg 100.00 126300
3 Besi Pipa untuk Hydrant BSP dia. 1,5" btg 100.00 141600
4 Besi Pipa untuk Hydrant BSP dia. 2" btg 100.00 254800
5 Besi Pipa untuk Hydrant BSP dia. 2,5" btg 100.00 495500
6 Besi Pipa untuk Hydrant BSP dia. 3" btg 100.00 571700
7 Besi Pipa untuk Hydrant BSP dia. 4" btg 100.00 679500
8 Besi Pipa untuk Hydrant BSP dia. 6" btg 100.00 1197900
9 Besi Pipa Hitam dia 1" t=2mm btg 100.00 119800
10 Besi Pipa Hitam dia 2" t=2mm btg 100.00 239600
11 Besi Pipa Hitam dia 3" t=2mm btg 100.00 326700
12 Besi Pipa Hitam dia 4" t=2mm btg 100.00 353900
13 Besi Pipa Hitam dia 6" t=2mm btg 100.00 789500

Page 11 of 95
14 Pipa GIP Medium A dia 1/2" (6 m') btg 100.00 159000
15 Pipa GIP Medium A dia 3/4" (6 m') btg 100.00 168800
16 Pipa GIP Medium A dia 1" (6 m') btg 100.00 226000
17 Pipa GIP Medium A dia 1 1/4" (6 m') btg 100.00 319600
18 Pipa GIP Medium A dia 1 1/2" (6 m') btg 100.00 320200
19 Pipa GIP Medium A dia 1 3/4" (6 m') btg 100.00 438300
20 Pipa GIP Medium A dia 2" (6 m') btg 100.00 1058500
21 Pipa GIP Medium A dia 2 1/2" (6 m') btg 100.00 438300
22 Pipa GIP Medium A dia 3" (6 m') btg 100.00 754700
23 Pipa GIP Medium A dia 4" (6 m') btg 100.00 1058500
24 Macam-macam Sambungan GIP dia. 1/2" bh 100.00 4100
25 Macam-macam Sambungan GIP dia. 3/4" bh 100.00 5200
26 Macam-macam Sambungan GIP dia. 1" bh 100.00 5600
27 Macam-macam Sambungan GIP dia. 1 1/4" bh 100.00 6500
28 Macam-macam Sambungan GIP dia. 1 1/2" bh 100.00 8700
29 Macam-macam Sambungan GIP dia. 1 3/4" bh 100.00 12600
30 Macam-macam Sambungan GIP dia. 2" bh 100.00 15200
31 Macam-macam Sambungan GIP dia. 2 1/2" bh 100.00 24000
32 Macam-macam Sambungan GIP dia. 3" bh 100.00 39200
33 Macam-macam Sambungan GIP dia. 4" bh 100.00 58800
34 Pipa PVC RUCIKA type AW dia. 1/2" btg 100.00 25600
35 Pipa PVC RUCIKA type AW dia. 3/4" btg 100.00 31600
36 Pipa PVC RUCIKA type AW dia. 1" btg 100.00 42200
37 Pipa PVC RUCIKA type AW dia. 1 1/4" btg 100.00 83100
38 Pipa PVC RUCIKA type AW dia. 1 1/2" btg 100.00 82500
39 Pipa PVC RUCIKA type AW dia. 2" btg 100.00 118400
40 Pipa PVC RUCIKA type AW dia. 2 1/2" btg 100.00 149700
41 Pipa PVC RUCIKA type AW dia. 3" btg 100.00 233400
42 Pipa PVC RUCIKA type AW dia. 4" btg 100.00 354100
43 Pipa PVC RUCIKA type AW dia. 6" btg 100.00 696800
44 Pipa PVC RUCIKA type AW dia. 8" btg 100.00 1040600
45 Pipa PVC MASPION ABU dia. 1/2" (AW) btg 100.00 18200
46 Pipa PVC MASPION ABU dia. 3/4" (AW) btg 100.00 22800
47 Pipa PVC MASPION ABU dia. 1" (AW) btg 100.00 26800
48 Pipa PVC MASPION ABU dia. 1 1/4" (AW) btg 100.00 43400
49 Pipa PVC MASPION ABU dia. 1 1/2" (AW) btg 100.00 62600
50 Pipa PVC MASPION ABU dia. 2" (AW) btg 100.00 92200
51 Pipa PVC MASPION ABU dia. 2 1/2" (AW) btg 100.00 119500
52 Pipa PVC MASPION ABU dia. 3" (AW) btg 100.00 170800
53 Pipa PVC MASPION ABU dia. 4" (AW) btg 100.00 250500
54 Macam-macam Sambungan Paralon dia. 1/2" bh 100.00 3400
55 Macam-macam Sambungan Paralon dia. 3/4" bh 100.00 4600
56 Macam-macam Sambungan Paralon dia. 1" bh 100.00 4600
57 Macam-macam Sambungan Paralon dia. 1 1/4" bh 100.00 5700
58 Macam-macam Sambungan Paralon dia. 1 1/2" bh 100.00 6800
59 Macam-macam Sambungan Paralon dia. 1 3/4" bh 100.00 7400
60 Macam-macam Sambungan Paralon dia. 2" bh 100.00 8500
61 Macam-macam Sambungan Paralon dia. 2 1/2" bh 100.00 10300
62 Macam-macam Sambungan Paralon dia. 3" bh 100.00 13700
63 Macam-macam Sambungan Paralon dia. 4" bh 100.00 20500
64 Sambungan Pipa PVC Jenis AW 4" TY bh 100.00 39900
65 Lem Paralon tube 100.00 4600
66 Seal Tape bh 100.00 2300
67 Pipa PVC 4" berlobang jenis AW m' 100.00 62600

0
L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 100.00 79700
2 Stop Kran 1" KIT bh 100.00 113900
3 Stop Kran 1 1/2" KIT bh 100.00 167300
4 Stop Kran 2" KIT bh 100.00 182200
5 Stop Kran 2 1/2" KIT bh 100.00 614800
6 Stop Kran 3" KIT bh 100.00 695600
7 Check Valve 1/2" bh 100.00 58100
8 Double Neple 1/2" bh 100.00 5700
9 Water Mur 1/2" bh 100.00 16200
10 Gate Valve 1/2" bh 100.00 34200
11 Saringan Air Lt. KM Stainless Steel bh 100.00 34200
12 Apoer Bath Tube bh 100.00 75700
13 Kran Stainless Lokal Kait bh 100.00 25000
14 Shower dengan tiang bh 100.00 160500
15 Shower tanpa tiang bh 100.00 66000
16 Kran tembok Sun Eui dia. 1/2" bh 100.00 54100
17 Kran tembok ITAP dia. 1/2" bh 100.00 38100
18 Kran Bebek Sun Eui dia. 1/2" bh 100.00 129100
19 Kran Bebek ITAP dia. 1/2" bh 100.00 65300
20 Kran Panas Dingin San Eui Standard bh 100.00 179700
21 Bath Cape Western unit 100.00 495500
22 Tempat Sabun Porselen bh 100.00 40300
23 Wastafel Lengkap TOTO LW 230 unit 100.00 914800
24 Wastafel Lengkap INA unit 100.00 517300
25 Closet Jongkok Porselen Warna TOTO unit 100.00 163900
26 Closet Jongkok Standard Putih Porselen TOTO unit 100.00 147000

Page 12 of 95
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 100.00 615300
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 100.00 2232500
29 Wastafel Bulat Warna Standard Lengkap TOTO unit 100.00 762900
30 Closet Duduk Warna Standard Lengkap INA bh 100.00 708900
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit 100.00 1470200
32 Penyekat Porselen Urinoir TOTO bh 100.00 348500
33 Kitchen Zink Stainless Standard Lokal (1 lubang) bh 100.00 179700
34 Kitchen Zink Stainless Non Standard Franke (1 lubang) bh 100.00 299500
35 Kitchen Zink Stainless Non Standard Franke (2 lubang) bh 100.00 462800

0
L BAHAN PENUTUP ATAP
1 Atap Plastik Gelombang 80x180 lbr 100.00 35300
2 Atap Fiber Glass Tipis 80x180 (Gelombang) lbr 100.00 41400
3 Atap Fiber Glass Tebal 80x180 (Gelombang) lbr 100.00 79000
4 Atap Aluminium Natural USR 26 (JAINDO) m2 100.00 107500
5 Atap Aluminium Warna USR 26 (JAINDO) m2 100.00 138300
6 Asbes Plat (100 x 100 x 0,3) Atrisco lbr 100.00 14000
7 Asbes Plat (100 x 100 x 0,3) Kerang Super lbr 100.00 7900
8 Asbes Plat (100 x 100 x 0,3) Indoplek lbr 100.00 14000
9 Asbes Plat (100 x 100 x 0,3) Elephant lbr 100.00 13700
10 Asbes Plat (100 x 100 x 0,3) Djabes lbr 100.00 15000
11 Asbes Gelombang Besar (300 x 102 x 0,5) lbr 100.00 123000
12 Asbes Gelombang Besar (250 x 102 x 0,5) lbr 100.00 111600
13 Asbes Gelombang Besar (225 x 102 x 0,5) lbr 100.00 102500
14 Asbes Gelombang Besar (200 x 102 x 0,5) lbr 100.00 92200
15 Asbes Gelombang Besar (180 x 102 x 0,5) lbr 100.00 78600
16 Asbes Gelombang Kecil (300 x 105 x 0,4) Djabes lbr 100.00 80600
17 Asbes Gelombang Kecil (270 x 105 x 0,4) Djabes lbr 100.00 76100
18 Asbes Gelombang Kecil (210 x 105 x 0,4) Djabes lbr 100.00 57200
19 Asbes Gelombang Kecil (180 x 105 x 0,4) Djabes lbr 100.00 50100
20 Asbes Gelombang Kecil (150 x 105 x 0,4) Djabes lbr 100.00 49000
21 Asbes Gelombang Kecil (240 x 105 x 0,4) Djabes lbr 100.00 70400
22 Asbes Nok Gelombang Besar lbr 100.00 51900
23 Asbes Nok Gelombang Besar lbr 100.00 34200
24 Atap Asbes Gelombang Kecil 4 mm 80x180 lbr 100.00 41900
25 Atap Asbes Gelombang Besar 5 mm 105x180 lbr 100.00 59400
26 Atap Tegola Kubota, Lengkap m2 100.00 373000
27 Atap Tegola Kualitas Sedang m2 100.00 206500
28 Aluminium Foil m2 100.00 6000
29 Genteng Beton Besar Natural isi 9 Buah "Monier" bh 100.00 4100
30 Genteng Beton Besar Warna isi 9 Buah "Monier" bh 100.00 6100
31 Genteng Beton Kecil Natural isi 11 Buah "RA" bh 100.00 3800
32 Genteng Beton Bubungan Natural bh 100.00 6100
33 Nok Press Beton bh 100.00 6800
34 Genteng Keramik Glasur Natural KIA bh 100.00 5700
35 Genteng Keramik Glasur Warna KIA bh 100.00 10300
36 Genteng Keramik Glasur Natural "Morando" Kebumen bh 100.00 2300
37 Genteng Keramik Glasur Natural "Morando" Jatiwangi bh 100.00 2,000.00
38 Genteng Keramik Glasur Warna "Morando" Jatiwangi bh 100.00 3,400.00
39 Genteng Kodok "Sokka" bh 100.00 1,700.00
40 Genteng Plenthong/Vlam Press Kecil Kebumen bh 100.00 1,500.00
41 Genteng Plenthong/Vlam Press Besar Kebumen bh 100.00 2,000.00
42 Genteng Plenthong/Vlam Press Kecil Jatiwangi bh 100.00 1,700.00
43 Genteng Plenthong/Vlam Press Besar Jatiwangi bh 100.00 2,000.00
44 Genteng Keramik Bubungan Glasur Natural KIA bh 100.00 18,400.00
45 Genteng Keramik Bubungan Glasur Natural Morando bh 100.00 10,300.00
46 Nok Genteng Kodok bh 100.00 6,400.00
47 Nok Genteng Plenthong/Vlam Press Kecil Kebumen bh 100.00 6,100.00
48 Nok Genteng Plenthong/Vlam Press Besar Kebumen bh 100.00 6,100.00
49 Nok Genteng Plenthong/Vlam Press Kecil Jatiwangi bh 100.00 6,800.00
50 Nok Genteng Plenthong/Vlam Press Besar Jatiwangi bh 100.00 6,800.00
51 Genteng Metal (Rainbow Roof) m2 100.00 164,400.00
52 Genteng Metal Hana m2 100.00 117,600.00
53 Nok Atas Metal (Rainbow Roof) m' 100.00 107,300.00
54 Nok Atas Metal Hana m' 100.00 59,100.00
55 Nok Pinggir Metal (Rainbow Roof) m' 100.00 107,300.00
56 Nok Pinggir Metal Hana m' 100.00 59,400.00
57 Wall Flashing (Rainbow Roof) m' 100.00 74,600.00
58 Wall Flashing Hana m' 100.00 57,500.00
59 Genteng Decrabond lbr 100.00 43,800.00
60 Atap Genteng Beton Warna 14,5/m2 m2 100.00 79,000.00
61 Genteng Beton Natural m2 100.00 74,100.00
62 Nok Genteng Beton bh 100.00 6,800.00
63 Sirap Klas I (80/m2) bh 100.00 1,300.00
64 Genteng Keramik Natural Intan 14,5/m2 m2 100.00 75,700.00
65 Genteng Keramik Glasur Standard 14,5/m2 m2 100.00 65,300.00
66 Genteng Keramik Glasur Special 14,5/m2 m2 100.00 90,900.00
67 Genteng Keramik Glasur Premium 14,5/m2 m2 100.00 100,000.00
68 Genteng Murando Natural 1m2=20 bh bh 100.00 2,300.00
69 Genteng Murando Glasur 1m2=20 bh bh 100.00 2,700.00
70 Bubung Murando Natural bh 100.00 4,400.00
71 Bubung Murando Glasur bh 100.00 6,500.00

Page 13 of 95
72 Bubungan Genteng Keramik bh 100.00 17,400.00
73 Genteng Aspal m2 100.00 170,800.00
74 Nok Genteng Aspal m2 100.00 108,200.00
75 Rooflight Fiberglass (Polycarbonate) m3 100.00 95,600.00

0
M BAHAN MEKANIKAL
1 Jockey Pump 80 gln/menit 100m' (18,6 kW) unit 100.00 45738000
2 Electrical Pump kap. 750 gln/menit 120 m' (90 kW) unit 100.00 167706000
3 Diesel Pump kap. 750 gln/menit 120 m' (105 kW) unit 100.00 326700000
4 Pressure Tank kap. 500 liter lengkap unit 100.00 22977900
5 Hydrant Box dalam gedung (lengkap) unit 100.00 4258000
6 Fire House 1,5x30 m + Nose unit 100.00 3267000
7 Exhaust Fan H600W60x60cm unit 100.00 1176100
8 Exhaust Fan H350WCFM 50x50cm unit 100.00 784600
9 Exhaust Fan H145W45x45cm unit 100.00 589100
10 AC Split 3 PK setara TOSHIBA unit 100.00 10236600
11 AC Split 2 PK setara TOSHIBA Plasma unit 100.00 6479600
12 AC Split 1 PK setara TOSHIBA Plasma unit 100.00 3571900
13 Mesin AC Split TOSHIBA (Indoor/Outdoor Unit) 1 BTU 100.00 1800

0
N BAHAN ELEKTRIKAL
1 Kabel NYA 1x1,5 Prima (1 roll=50m') roll 100.00 159000
2 Kabel NYA 1x2,5 Prima (1 roll=50m') roll 100.00 252100
3 Kabel NYA 2x1,5 Prima (1 roll=50m') m' 100.00 4100
4 Kabel NYA 3x1,5 Prima (1 roll=50m') m' 100.00 5400
5 Kabel NYA 2x2,5 Prima (1 roll=50m') m' 100.00 5700
6 Kabel NYA 3x2,5 Prima (1 roll=50m') m' 100.00 7300
7 Kabel NYA 4x2,5 Prima (1 roll=50m') m' 100.00 9300
8 Kabel NYA 2x4 Prima (1 roll=50m') m' 100.00 10400
9 Kabel NYA 3x4 Prima (1 roll=50m') m' 100.00 13900
10 Kabel NYA 4x4 Prima (1 roll=50m') m' 100.00 17600
11 Kabel NYM 2x6 Supreme (1 roll=50m') m' 100.00 13900
12 Kabel NYM 3x6 Supreme (1 roll=50m') m' 100.00 20000
13 Kabel NYM 4x6 Supreme (1 roll=50m') m' 100.00 26400
14 Kabel NYM 2x10 Supreme (1 roll=50m') m' 100.00 22600
15 Kabel NYM 3x10 Supreme (1 roll=50m') m' 100.00 33800
16 Kabel NYM 4x10 Supreme (1 roll=50m') m' 100.00 43800
17 Kabel NYM 4x16 Supreme (1 roll=50m') m' 100.00 70800
18 Kabel NYM 2x4 Supreme (1 roll=50m') m' 100.00 12000
19 Kabel NYM 3x4 Supreme (1 roll=50m') m' 100.00 17600
20 Kabel NYM 4x4 Supreme (1 roll=50m') m' 100.00 22900
21 Kabel NYM 2x6 Supreme (1 roll=50m') m' 100.00 18000
22 Kabel NYM 3x6 Supreme (1 roll=50m') m' 100.00 25300
23 Kabel NYM 4x6 Supreme (1 roll=50m') m' 100.00 30500
24 Kabel NYM 2x10 Supreme (1 roll=50m') m' 100.00 27200
25 Kabel NYM 3x10 Supreme (1 roll=50m') m' 100.00 37000
26 Kabel NYM 4x10 Supreme (1 roll=50m') m' 100.00 56600
27 Kabel NYM 4x16 Supreme (1 roll=50m') m' 100.00 82800
28 NSFB FUJI EA - 100A bh 100.00 670800
29 NSFB FUJI EA - 150A bh 100.00 1726100
30 Rumah Panel 30x40x20 cm (Kosong) unit 100.00 197700
31 Sekering Kas 2 Group Biasa unit 100.00 30000
32 Sekering Kas 3 Group Biasa unit 100.00 56600
33 Sekering Kas 5 Group Biasa unit 100.00 348500
34 MCB 1 PHASE bh 100.00 42500
35 MCB 3 PHASE bh 100.00 70800
36 Tahanan 50A Merk Fuji bh 100.00 392000
37 Saklar Broco Tunggal Standard (1 Phase) bh 100.00 10900
38 Saklar Broco Seri Standard (1 Phase) bh 100.00 14700
39 Stop Kontak Broco Standard (1 Phase) bh 100.00 13100
40 Stop Kontak Broco 3 Phase (Outbow) bh 100.00 71800
41 Stop Kontak Broco 3 Phase (Inbow) bh 100.00 71800
42 Stop Kontak Handle 3 Phase bh 100.00 65300
43 Instalasi Titik Lampu/Stop Kontak (Upah dan Alat) ttk 100.00 125200
44 Lampu Pijar 25 Watt s/d 100 Watt bh 100.00 6500
45 Lampu Neon TL Phillip 20 Watt bh 100.00 10400
46 Lampu Neon TL Phillip 40 Watt bh 100.00 12000
47 Trafo TL 20 W (Phillip) bh 100.00 26700
48 Trafo TL 40 W (Phillip) bh 100.00 27200
49 Trafo TL 20 W (Sinar) bh 100.00 25000
50 Trafo TL 40 W (Sinar) bh 100.00 25600
51 Starter Neon Phillip bh 100.00 4400
52 Starter Neon Biasa bh 100.00 3500
53 Rumah TL Inbow/Outbow 2x20W (Kosongan) bh 100.00 192200
54 Down Light + SL 25 W Phillip bh 100.00 36500
55 Lampu SL Phillip 20 W bh 100.00 34800
56 Lampu Circle TL 20 W Lengkap bh 100.00 25000
57 Lampu Mercuri 80 W bh 100.00 30500
58 Lampu Taman + Tiang + Lampu 1 buah bh 100.00 159500
59 Lampu Baret 30 cm + Neon bh 100.00 136100

Page 14 of 95
60 Lampu Neon Acrilic 2x40W Lengkap bh 100.00 314700
61 Jarum Penangkal Petir 16 bh 100.00 31000
62 Kawat BC (Tembaga) kg 100.00 74100
63 Pentanahan Penangkal Petir ttk 100.00 288000
64 Pentanahan Panel ttk 100.00 383300

0
O BAHAN ALAT PENGGANTUNG DAN KUNCI
1 Kunci Silinder ALFA untuk Pintu Aluminium bh 100.00 352800
2 Tarikan Pintu Aluminium bh 100.00 353900
3 Rel Handerson Lengkap bh 100.00 699100
4 Rel Marathon/Pintu unit 100.00 157400
5 Kunci Gembok Besar bh 100.00 68100
6 Kunci Tanam 2 Slag/Selot Pintu Kuda Terbang bh 100.00 79500
7 Kunci Tanam 2 Slag/Selot Pintu Yale bh 100.00 54,600.00
8 Kunci Tanam 2 Slag/Selot Pintu Alpha bh 100.00 34,200.00
9 Kunci Tanam 2 Slag/Selot Pintu ex. RRC bh 100.00 64,900.00
10 Kunci Tanam Antik bh 100.00 341,600.00
Kunci Tanam Biasa bh 500.00
11 Kunci Lemari bh 100.00 17,100.00
12 Kunci Tanam Silinder bh 100.00 102,500.00
13 Kunci Kamar Mandi "Alpha" bh 100.00 30,700.00
14 Engsel Pintu Kuningan 3" bh 100.00 15,700.00
15 Engsel Pintu Kuningan 4" bh 100.00 16,400.00
16 Engsel Pintu Nilon 3" bh 100.00 8,900.00
17 Engsel Pintu Nilon 4" bh 100.00 11,200.00
18 Engsel Stainless Steel 3" bh 100.00 25,600.00
19 Engsel Stainless Steel 4" bh 100.00 32,500.00
20 Engsel Piano ex. RRC bh 100.00 29,700.00
Engsel Angin bh 150.00
21 Grendel Ukuran 5 - 10 cm bh 100.00 7,200.00
22 Grendel Ukuran 11 - 15 cm bh 100.00 9,600.00
23 Grendel Ukuran 16 - 20 cm bh 100.00 19,100.00
24 Kait Angin Kuningan Ukuran 10 - 20 cm bh 100.00 8,200.00
25 Kait Angin Kuningan Ukuran 21 - 30 cm bh 100.00 10,900.00
26 Espagnolet Tanam Ukuran 21 - 30 cm bh 100.00 43,600.00
27 Engsel Pintu 77 bh 100.00 13,400.00
28 Engsel Jendela 77 bh 100.00 13,900.00
29 Spring Knip bh 100.00 6,100.00
30 Rel Pintu Dorong bh 100.00 6,100.00
31 Pintu PVC Standar bh 100.00 116,100.00
32 Pintu Aluminium bh 100.00 300,600.00
33 Hak Angin Kait Jendela Biasa ps 100.00 12,000.00
34 Hak Angin Jendela Antik ps 100.00 22,800.00
35 Hak Angin Sendok Stainless/Kuningan bh 100.00 24,000.00
36 Slot Pintu Berikut Rantai bh 100.00 38,900.00
37 Slot Jendela Tunggal bh 100.00 36,300.00
38 Engsel Pintu Unilon Standard Besar 5" ps 100.00 26,100.00
39 Engsel Jendela Unilon ps 100.00 24,500.00
40 Engsel Patrun ps 100.00 13,600.00
41 Engsel Harmonika m' 100.00 22,600.00
42 Door Closer Klas Standard (Klas Sedang) unit 100.00 130,700.00
43 Door Closer Klas Standard (Klas Baik) unit 100.00 462,800.00
44 Door Closer Klas Rendah unit 100.00 70,800.00
45 Tarikan Almari Rata-rata bh 100.00 8,200.00
46 Door Holder bh 100.00 79,700.00
47 Door Stoper bh 100.00 11,400.00

0
P BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN
1 Hotmix jadi berikut alat dan bahan bakar (T=5cm, 9 m2) ton 100.00 925700
2 Aspal (ESO) 1 Drum 150 kg kg 100.00 9500
3 Aspal Curah kg 100.00 7300
4 Aspal RC70 (Cilacap) kg 100.00 8300

0
Q BAHAN PENGHISAP AIR SUMUR DALAM
1 Pompa Kodok unit 100.00 174800
2 Pompa Dragon Tegal unit 100.00 272500
3 Pompa Dragon Asli unit 100.00 457400
4 Mesin Pompa Air 100W-Sanyo unit 100.00 675200
5 Mesin Pompa Air 150W-Sanyo unit 100.00 987200
6 Mesin Pompa Air 250W-Sanyo unit 100.00 5281700
7 Mesin Pompa Air 450W-Sanyo unit 100.00 8004200
8 Pompa Submersible kap. 150 liter/menit 3 kW unit 100.00 20908800
9 Gear Pump kap. 60 liter/menit unit 100.00 31472100
10 Deep Well dengan kelengkapannya kap. 150 liter/menit unit 100.00 170973000
11 Hand Oil Pump unit 100.00 4117000

0
R BAHAN PENAMPUNG AIR

Page 15 of 95
1 Tangki Air Fiber Glass 0,5 m3 (Penguin) bh 100.00 708900
2 Tangki Air Fiber Glass 1 m3 (Penguin) bh 100.00 1197900
3 Tangki Air Fiber Glass 2 m3 (Penguin) bh 100.00 1943900
4 Bak KM Fiber 60x60cm bh 100.00 103500
5 Bak Teraso WC 40x40cm bh 100.00 92600
6 Bak KM Teraso 60x60cm bh 100.00 130700

0
S ALAT BANTU TUKANG
1 Palu 0,5 kg bh 100.00 50100
2 Cangkul bh 100.00 49000
3 Singkup bh 100.00 49000
4 Sekop bh 100.00 56600
5 Pengki bh 100.00 17400
6 Linggis bh 100.00 50100
7 Roll Meter 50 m (Bahan Plastik) bh 100.00 55300
8 Roll Meter 5 m (Bahan Seng) bh 100.00 27800
9 Selang Plastik untuk Waterpass dia. 0,5 cm m' 100.00 1600
10 Waterpass Aluminium bh 100.00 82200

0
T BAHAN BAKAR DAN PELUMAS
1 Minyak Tanah ltr 100.00 9300
2 Kayu Bakar dari Kayu Karet m3 100.00 136100
3 Bahan Bakar Residu ltr 100.00 600
4 Minyak Solar ltr 100.00 5500
5 Bensin Premium ltr 100.00 10300
6 Plus Oil ltr 100.00 1700
7 Oli Mesran SAE 40 ltr 100.00 32700
8 Minyak Bekisting ltr 100.00 22800
9 Elpiji 12 kg tbg 100.00 87100
10 Asitilin15,1 kg tbg 100.00 70800
11 Oxigen tbg 100.00 102500
12 Kawat Las Listrik kg 100.00 16300
13 Karbit kg 100.00 21800
14 Soda Api kg 100.00 22800

0
U MATERIAL EXPLOSIVE DAN PERALATANNYA
1 Gelatinized dynamite kg 100.00 53600
2 ANFO kg 100.00 10600
3 Detonating fuse 100 m 100.00 849100
4 Common fuse 100 m 100.00 494300
5 Electric detonators 100 bh 100.00 1372000
6 Common detonators 100 bh 100.00 223800
7 Blasting wire 100 m 100.00 51500
8 Track drill rod bh 100.00 5340700
9 Track drill shank bh 100.00 3454700
10 Track drill coupling bh 100.00 1121100
11 Rock bit, 75 mm size bh 100.00 3902800
12 Integral drill steel bh 100.00 1759600

A1 MATERIAL LAINNYA
Seng Gelombang BJLS 30 lbr 100.00
Tali Ijuk m3 100.00
Panel Beton Pracetak lbr 100.00
Kolom Beton Pracerak btg 100.00
Ijuk kg 100.00
Formite/penjaga jarak bekisting/spacer bh 10.00
Lantai kerja beton t=10 cm m3 10.00
Phenol film 12 mm Lbr 10.00
Lem Kayu kg 20.00

Page 16 of 95
ANALISA HARGA SATUAN PEKERJAAN (AHSP)

Nama Proyek :

Lokasi Proyek :

Nilai Proyek :

A.1 PEKERJAAN PERSIAPAN

Jenis Pekerjaan : Pembuatan Direksikit


Satuan : 1 m2
Harga Satuan : Rp 109,080
Total Koefisien : 3.350 OH
Sumber : SNI
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.000 OH 100.00 100.00
2 Tukang 2.000 OH 100.00 200.00
3 Kepala Tukang 0.300 OH 100.00 30.00
4 Mandor 0.050 OH 100.00 5.00

Jumlah 3.350 OH Jumlah Rp335


B Bahan :
1 Kayu Kamper Singkil/Kapur (K. Samarinda Kla 0.020 m3 100.00 2.00
2 Kayu Papan Kelas III 0.100 m3 100.00 10.00
3 Paku 8 cm s/d 12 cm 0.250 kg 100.00 25.00
4 Seng Gelombang BJLS 30 1.100 lbr 100.00 110.00
5 Tripleks 9 mm 120x240 0.500 lbr 100.00 50.00
6 Semen PC /50 kg 5.000 zak 100.00 500.00
7 Pasir Pasang 0.250 m3 347,188.00 86,797.00
8 Bata Merah (rata-rata) 70.000 bh 100.00 7,000.00
9 Kaca Polos 5 mm (ASAHI) 0.080 m2 100.00 8.00
10 Kunci Tanam 2 Slag/Selot Pintu Yale 0.150 bh 100.00 15.00

Jumlah Rp94,517
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 94,852
E Overhead + Profit 15 % Rp 14,228
F Harga Satuan Pekerjaan (D + E) Rp 109,080

Jenis Pekerjaan : Membuat Barak Pekerja dan Gudang


Satuan : 1 m2
Harga Satuan : Rp 1,175
Total Koefisien : 3.250 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.000 OH 100.00 100.00
2 Tukang 2.000 OH 100.00 200.00
3 Kepala Tukang 0.200 OH 100.00 20.00
4 Mandor 0.050 OH 100.00 5.00

Jumlah 3.250 OH Jumlah Rp325


B Bahan :
1 Kayu Kamper Singkil/Kapur (K. Samarinda Kla 0.020 m3 100.00 2.00
2 Kayu Papan Kelas III 0.100 m3 100.00 10.00
3 Paku 8 cm s/d 12 cm 0.250 kg 100.00 25.00
4 Seng Gelombang BJLS 30 1.100 lbr 100.00 110.00
5 Tripleks 9 mm 120x240 0.500 lbr 100.00 50.00
6 Semen PC /50 kg 5.000 zak 100.00 500.00

Jumlah Rp697
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 1,022
E Overhead + Profit 15 % Rp 153
F Harga Satuan Pekerjaan (D + E) Rp 1,175

Jenis Pekerjaan : Pembuatan Stager/ Perancah dari Bambu s.d Tinggi 6 m


Satuan : 1 m2
Harga Satuan : Rp 539
Total Koefisien : 3.250 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.000 OH 100.00 100.00
2 Tukang Kayu 2.000 OH 100.00 200.00
3 Kepala Tukang 0.200 OH 100.00 20.00
4 Mandor 0.050 OH 100.00 5.00

Jumlah 3.250 OH Jumlah Rp325


B Bahan :
1 Bambu dia. 7 s/d 10 1.250 btg 100.00 125.00
2 Tali Ijuk 0.186 m3 100.00 18.60

Jumlah Rp144
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 469
E Overhead + Profit 15 % Rp 70
F Harga Satuan Pekerjaan (D + E) Rp 539

Jenis Pekerjaan : Pemasangan Bowplank


Satuan : 1 m1
Harga Satuan : Rp 28
Total Koefisien : 0.215 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.215 OH Jumlah Rp22


B Bahan :
1 Paku 4 cm s/d 7 cm 0.020 kg 100.00 2.00
2 Kayu Papan Kelas III 0.007 m3 100.00 0.70

Jumlah Rp3
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 24
E Overhead + Profit 15 % Rp 4
F Harga Satuan Pekerjaan (D + E) Rp 28

Jenis Pekerjaan : Pemasagan Pagar BRC Lengkap Tanpa Pondasi


Satuan : 1 m2
Harga Satuan : Rp 242
Total Koefisien : 1.100 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.500 OH 100.00 50.00
2 Tukang 0.500 OH 100.00 50.00
3 Kepala Tukang 0.050 OH 100.00 5.00
4 Mandor 0.050 OH 100.00 5.00

Jumlah 1.100 OH Jumlah Rp110


B Bahan :
1 Pagar BRC Lengkap Tiang (Tanpa Pondasi) 1.000 m2 100.00 100.00

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 210
E Overhead + Profit 15 % Rp 32
F Harga Satuan Pekerjaan (D + E) Rp 242

Jenis Pekerjaan : Pemasanga Panel Beton Pracetak 50x50x240 Untuk Pagar


Satuan : 1 m2
Harga Satuan : Rp 101,253
Total Koefisien : 0.531 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.375 OH 100.00 37.50
2 Tukang 0.125 OH 100.00 12.50
3 Kepala Tukang 0.012 OH 100.00 1.20
4 Mandor 0.019 OH 100.00 1.90

Jumlah 0.531 OH Jumlah Rp53


B Bahan :
1 Panel Beton Pracetak 0.986 lbr 100.00 98.60
2 Kolom Beton Pracerak 0.525 btg 100.00 52.50
3 Semen PC /50 kg 1.000 zak 100.00 100.00
4 Pasir Beton 0.074 m3 347,188.00 25,691.91
5 Batu Pecah Mesin 2/3 0.146 m3 425,000.00 62,050.00

Jumlah Rp87,993
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 88,046
E Overhead + Profit 15 % Rp 13,207
F Harga Satuan Pekerjaan (D + E) Rp 101,253

Jenis Pekerjaan : Pembersihan Lahan Ringan


Satuan : 1 m2
Harga Satuan : Rp 9
Total Koefisien : 0.075 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Mandor 0.050 OH 100.00 5.00

Jumlah 0.075 OH Jumlah Rp8


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 8
E Overhead + Profit 15 % Rp 1
F Harga Satuan Pekerjaan (D + E) Rp 9

Jenis Pekerjaan : Pengukuran (UILZET)


Satuan : 1 m2
Harga Satuan : Rp 9
Total Koefisien : 0.075 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Surveyor Geodesi 0.050 OH 100.00 5.00

Jumlah 0.075 OH Jumlah Rp8


B Bahan :
1

Jumlah Rp0
C Peralatan :
1 TOTAL STATION 0.007 Hr 100.00 0.67

Jumlah Rp1
D Jumlah A + B + C Rp 8
E Overhead + Profit 15 % Rp 1
F Harga Satuan Pekerjaan (D + E) Rp 9

A.2 PEKERJAAN DEMOLISH


Jenis Pekerjaan : Membongkar Beton
Satuan : 1 m3
Harga Satuan : Rp 805
Total Koefisien : 7.000 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 6.667 OH 100.00 666.70
2 Tukang Batu 0.333 OH 100.00 33.30

Jumlah 7.000 OH Jumlah Rp700


B Bahan :
1
Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 700
E Overhead + Profit 15 % Rp 105
F Harga Satuan Pekerjaan (D + E) Rp 805

Jenis Pekerjaan : Membongkar Dinding


Satuan : 1 m3
Harga Satuan : Rp 125
Total Koefisien : 1.090 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.000 OH 100.00 100.00
2 Tukang Batu 0.090 OH 100.00 9.00

Jumlah 1.090 OH Jumlah Rp109


B Bahan :
1

Jumlah Rp0
C Peralatan :
1 0.007

Jumlah Rp0
D Jumlah A + B + C Rp 109
E Overhead + Profit 15 % Rp 16
F Harga Satuan Pekerjaan (D + E) Rp 125

Jenis Pekerjaan : Membongkar Rangka Atap


Satuan : 1 m2
Harga Satuan : Rp 15
Total Koefisien : 0.133 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang 0.025 OH 100.00 2.50
3 Kepala Tukang 0.003 OH 100.00 0.25
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.133 OH Jumlah Rp13


B Bahan :
1

Jumlah Rp0
C Peralatan :
1 0.007

Jumlah Rp0
D Jumlah A + B + C Rp 13
E Overhead + Profit 15 % Rp 2
F Harga Satuan Pekerjaan (D + E) Rp 15

Jenis Pekerjaan : Membongkar Atap Seng


Satuan : 1 m2
Harga Satuan : Rp 3
Total Koefisien : 0.030 OH
Sumber :
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.020 OH 100.00 2.00
2 Tukang 0.010 OH 100.00 1.00

Jumlah 0.030 OH Jumlah Rp3


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 3
E Overhead + Profit 15 % Rp 0
F Harga Satuan Pekerjaan (D + E) Rp 3
B.1 PEKERJAAN TANAH
Jenis Pekerjaan : Pemasangan Lapisan Ijuk Tebal 10 cm untuk Bidang Resapan Tanki Septik
Satuan : 1 m2
Harga Satuan : Rp 709
Total Koefisien : 0.165 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Mandor 0.015 OH 100.00 1.50

Jumlah 0.165 OH Jumlah Rp17


B Bahan :
1 Ijuk 6.000 kg 100.00 600.00

Jumlah Rp600
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 617
E Overhead + Profit 15 % Rp 92
F Harga Satuan Pekerjaan (D + E) Rp 709

Jenis Pekerjaan : Menggali Tanah Biasa Sedalam 1 meter


Satuan : 1 m3
Harga Satuan : Rp 89
Total Koefisien : 0.775 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.750 OH 100.00 75.00
2 Mandor 0.025 OH 100.00 2.50

Jumlah 0.775 OH Jumlah Rp78


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 78
E Overhead + Profit 15 % Rp 12
F Harga Satuan Pekerjaan (D + E) Rp 89

Jenis Pekerjaan : Menggali Tanah Biasa Sedalam 2 meter


Satuan : 1 m3
Harga Satuan : Rp 109
Total Koefisien : 0.945 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.900 OH 100.00 90.00
2 Mandor 0.045 OH 100.00 4.50

Jumlah 0.945 OH Jumlah Rp95


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 95
E Overhead + Profit 15 % Rp 14
F Harga Satuan Pekerjaan (D + E) Rp 109

Jenis Pekerjaan : Menggali Tanah Biasa Sedalam 3 meter


Satuan : 1 m3
Harga Satuan : Rp 128
Total Koefisien : 1.117 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.050 OH 100.00 105.00
2 Mandor 0.067 OH 100.00 6.70

Jumlah 1.117 OH Jumlah Rp112


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 112
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 128

Jenis Pekerjaan : Menggali Tanah Keras Sedalam 1 meter


Satuan : 1 m3
Harga Satuan : Rp 119
Total Koefisien : 1.032 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.000 OH 100.00 100.00
2 Mandor 0.032 OH 100.00 3.20

Jumlah 1.032 OH Jumlah Rp103


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 103
E Overhead + Profit 15 % Rp 15
F Harga Satuan Pekerjaan (D + E) Rp 119

Jenis Pekerjaan : Menggali Tanah Cadas Sedalam 1 meter


Satuan : 1 m3
Harga Satuan : Rp 179
Total Koefisien : 1.560 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Mandor 0.060 OH 100.00 6.00

Jumlah 1.560 OH Jumlah Rp156


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 156
E Overhead + Profit 15 % Rp 23
F Harga Satuan Pekerjaan (D + E) Rp 179

Jenis Pekerjaan : Menggali Tanah Lumpur Sedalam 1 meter


Satuan : 1 m3
Harga Satuan : Rp 143
Total Koefisien : 1.245 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.200 OH 100.00 120.00
2 Mandor 0.045 OH 100.00 4.50

Jumlah 1.245 OH Jumlah Rp125


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 125
E Overhead + Profit 15 % Rp 19
F Harga Satuan Pekerjaan (D + E) Rp 143

Jenis Pekerjaan : Mengerjakan Stripping Tebing Setinggi 1 meter


Satuan : 1 m2
Harga Satuan : Rp 6
Total Koefisien : 0.055 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.050 OH 100.00 5.00
2 Mandor 0.005 OH 100.00 0.50

Jumlah 0.055 OH Jumlah Rp6


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 6
E Overhead + Profit 15 % Rp 1
F Harga Satuan Pekerjaan (D + E) Rp 6

Jenis Pekerjaan : Membuang Tanah Sejauh 30 meter


Satuan : 1 m3
Harga Satuan : Rp 39
Total Koefisien : 0.340 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.330 OH 100.00 33.00
2 Mandor 0.010 OH 100.00 1.00

Jumlah 0.340 OH Jumlah Rp34


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 34
E Overhead + Profit 15 % Rp 5
F Harga Satuan Pekerjaan (D + E) Rp 39

Jenis Pekerjaan : Memadatkan Tanah (per 20 cm)


Satuan : 1 m3
Harga Satuan : Rp 39
Total Koefisien : 0.340 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.330 OH 100.00 33.00
2 Mandor 0.010 OH 100.00 1.00

Jumlah 0.340 OH Jumlah Rp34


B Bahan :
1

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 34
E Overhead + Profit 15 % Rp 5
F Harga Satuan Pekerjaan (D + E) Rp 39

Jenis Pekerjaan : Mengurug Pasir Urug


Satuan : 1 m3
Harga Satuan : Rp 383,331
Total Koefisien : 0.310 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Mandor 0.010 OH 100.00 1.00

Jumlah 0.310 OH Jumlah Rp31


B Bahan :
1 Pasir Urug 1.200 m3 277,750.00 333,300.00

Jumlah Rp333,300
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 333,331
E Overhead + Profit 15 % Rp 50,000
F Harga Satuan Pekerjaan (D + E) Rp 383,331

Jenis Pekerjaan : Mengurug Sirtu Padat Untuk Penginggian Lantai Bangunan


Satuan : 1 m3
Harga Satuan : Rp 448,536
Total Koefisien : 0.310 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Mandor 0.010 OH 100.00 1.00

Jumlah 0.310 OH Jumlah Rp31


B Bahan :
1 Sirtu 1.200 m3 325,000.00 390,000.00

Jumlah Rp390,000
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 390,031
E Overhead + Profit 15 % Rp 58,505
F Harga Satuan Pekerjaan (D + E) Rp 448,536

Jenis Pekerjaan : Memasang Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL


Satuan : 1 m3
Harga Satuan : Rp 159,983
Total Koefisien : 1.320 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.800 OH 100.00 80.00
2 Tukang Batu 0.400 OH 100.00 40.00
3 Kepala Tukang 0.040 OH 100.00 4.00
4 Mandor 0.080 OH 100.00 8.00

Jumlah 1.320 OH Jumlah Rp132


B Bahan :
1 Kapur Padam 0.135 m3 100.00 13.50
2 Pasir Pasang 0.400 m3 347,188.00 138,875.20
3 Tanah Liat 0.948 m3 100.00 94.80

Jumlah Rp138,984
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 139,116
E Overhead + Profit 15 % Rp 20,867
F Harga Satuan Pekerjaan (D + E) Rp 159,983

C.1 PEKERJAAN PONDASI


Jenis Pekerjaan : Memasang Batu Kosong (Aanstamping) untuk Pondasi Gedung
Satuan : 1 m3
Harga Satuan : Rp 814,330
Total Koefisien : 1.248 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.780 OH 100.00 78.00
2 Tukang Batu 0.390 OH 100.00 39.00
3 Kepala Tukang 0.039 OH 100.00 3.90
4 Mandor 0.039 OH 100.00 3.90

Jumlah 1.248 OH Jumlah Rp125


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Pasir Urug 0.432 m3 277,750.00 119,988.00

Jumlah Rp707,988
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 708,113
E Overhead + Profit 15 % Rp 106,217
F Harga Satuan Pekerjaan (D + E) Rp 814,330

Jenis Pekerjaan : Memasang Batu Belah, Campuran 1 PC : 3 PP


Satuan : 1 m3
Harga Satuan : Rp 870,585
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 4.040 zak 100.00 404.00
3 Pasir Pasang 0.485 m3 347,188.00 168,386.18

Jumlah Rp756,790
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 757,030
E Overhead + Profit 15 % Rp 113,555
F Harga Satuan Pekerjaan (D + E) Rp 870,585

Jenis Pekerjaan : Memasang Batu Belah, Campuran 1 PC : 4 PP


Satuan : 1 m3
Harga Satuan : Rp 884,469
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 3.260 zak 100.00 326.00
3 Pasir Pasang 0.520 m3 347,188.00 180,537.76

Jumlah Rp768,864
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 769,104
E Overhead + Profit 15 % Rp 115,366
F Harga Satuan Pekerjaan (D + E) Rp 884,469

Jenis Pekerjaan : Memasang Batu Belah, Campuran 1 PC : 5 PP


Satuan : 1 m3
Harga Satuan : Rp 893,990
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 2.720 zak 100.00 272.00
3 Pasir Pasang 0.544 m3 347,188.00 188,870.27

Jumlah Rp777,142
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 777,382
E Overhead + Profit 15 % Rp 116,607
F Harga Satuan Pekerjaan (D + E) Rp 893,990

Jenis Pekerjaan : Memasang Batu Belah, Campuran 1 PC : 6 PP


Satuan : 1 m3
Harga Satuan : Rp 900,733
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 2.340 zak 100.00 234.00
3 Pasir Pasang 0.561 m3 347,188.00 194,772.47

Jumlah Rp783,006
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 783,246
E Overhead + Profit 15 % Rp 117,487
F Harga Satuan Pekerjaan (D + E) Rp 900,733

Jenis Pekerjaan : Memasang Batu Belah, Campuran 1 PC : 8 PP


Satuan : 1 m3
Harga Satuan : Rp 909,857
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 1.820 zak 100.00 182.00
3 Pasir Pasang 0.584 m3 347,188.00 202,757.79

Jumlah Rp790,940
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 791,180
E Overhead + Profit 15 % Rp 118,677
F Harga Satuan Pekerjaan (D + E) Rp 909,857

Jenis Pekerjaan : Memasang Pondasi Batu Belah, Campuran 1 KP : 1 SM : 2 PP


Satuan : 1 m3
Harga Satuan : Rp 812,266
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Kapur Padam 0.170 m3 100.00 17.00
3 Semen Merah 0.170 m3 100.00 17.00
4 Pasir Pasang 0.340 m3 347,188.00 118,043.92

Jumlah Rp706,078
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 706,318
E Overhead + Profit 15 % Rp 105,948
F Harga Satuan Pekerjaan (D + E) Rp 812,266

Jenis Pekerjaan : Memasang Pondasi Batu Belah, Campuran 1 PC : 3 KP : 10 PP


Satuan : 1 m3
Harga Satuan : Rp 873,072
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 1.220 zak 100.00 122.00
3 Kapur Padam 0.147 m3 100.00 14.70
4 Pasir Pasang 0.492 m3 347,188.00 170,816.50

Jumlah Rp758,953
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 759,193
E Overhead + Profit 15 % Rp 113,879
F Harga Satuan Pekerjaan (D + E) Rp 873,072

Jenis Pekerjaan : Memasang Pondasi Batu Belah, Campuran 1/4 PC : 1 KP : 4 PP


Satuan : 1 m3
Harga Satuan : Rp 885,402
Total Koefisien : 2.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.500 OH 100.00 150.00
2 Tukang Batu 0.750 OH 100.00 75.00
3 Kepala Tukang 0.075 OH 100.00 7.50
4 Mandor 0.075 OH 100.00 7.50

Jumlah 2.400 OH Jumlah Rp240


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 1.200 m3 490,000.00 588,000.00
2 Semen PC /50 kg 0.820 zak 100.00 82.00
3 Kapur Padam 0.131 m3 100.00 13.10
4 Pasir Pasang 0.523 m3 347,188.00 181,579.32

Jumlah Rp769,674
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 769,914
E Overhead + Profit 15 % Rp 115,487
F Harga Satuan Pekerjaan (D + E) Rp 885,402

Jenis Pekerjaan : Memasang Pondasi Siklop, 60% Beton Campuran 1 PC : 2PB : 3 KR dan 40% Batu Belah
Satuan : 1 m3
Harga Satuan : Rp 636,756
Total Koefisien : 4.505 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 3.400 OH 100.00 340.00
2 Tukang Batu 0.850 OH 100.00 85.00
3 Kepala Tukang 0.085 OH 100.00 8.50
4 Mandor 0.170 OH 100.00 17.00
Jumlah 4.505 OH Jumlah Rp451
B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 0.480 m3 490,000.00 235,200.00
2 Semen PC /50 kg 3.880 zak 100.00 388.00
Pasir Beton 0.312 m3 347,188.00 108,322.66
3 Koral Beton Kali (m3) 0.468 m3 420,000.00 196,560.00
Besi Beton U-39/U-32 Rata-rata 126.000 kg 100.00 12,600.00
4 Kawat Beton 1.800 kg 100.00 180.00

Jumlah Rp553,251
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 553,701
E Overhead + Profit 15 % Rp 83,055
F Harga Satuan Pekerjaan (D + E) Rp 636,756

Jenis Pekerjaan : Memasang Pondasi Sumuran, Diamter 100 cm


Satuan : 1 m3
Harga Satuan : Rp 605,027
Total Koefisien : 3.399 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 2.400 OH 100.00 240.00
2 Tukang Batu 0.800 OH 100.00 80.00
3 Kepala Tukang 0.080 OH 100.00 8.00
4 Mandor 0.119 OH 100.00 11.90

Jumlah 3.399 OH Jumlah Rp340


B Bahan :
1 Batu Belah Pondasi 15 cm / 20 cm 0.450 m3 490,000.00 220,500.00
2 Semen PC /50 kg 3.880 zak 100.00 388.00
Pasir Beton 0.312 m3 347,188.00 108,322.66
3 Koral Beton Kali (m3) 0.468 m3 420,000.00 196,560.00

Jumlah Rp525,771
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 526,111
E Overhead + Profit 15 % Rp 78,917
F Harga Satuan Pekerjaan (D + E) Rp 605,027

D.1 PEKERJAAN BETON


Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 7,4 Mpa (K100)
Satuan : 1 m3
Harga Satuan : Rp 635,032
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 4.940 zak 100.00 494.00
2 Pasir Beton 0.621 m3 347,188.00 215,504.55
3 Batu Pecah Mesin 2/3 0.740 m3 425,000.00 314,500.00
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp551,999
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 552,202
E Overhead + Profit 15 % Rp 82,830
F Harga Satuan Pekerjaan (D + E) Rp 635,032

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 9,8 Mpa (K125)


Satuan : 1 m3
Harga Satuan : Rp 628,113
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 5.520 zak 100.00 552.00
2 Pasir Beton 0.591 m3 347,188.00 205,336.90
3 Batu Pecah Mesin 2/3 0.750 m3 425,000.00 318,592.59
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp545,981
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 546,185
E Overhead + Profit 15 % Rp 81,928
F Harga Satuan Pekerjaan (D + E) Rp 628,113

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 12,2 Mpa (K150)


Satuan : 1 m3
Harga Satuan : Rp 621,705
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 5.980 zak 100.00 598.00
2 Pasir Beton 0.571 m3 347,188.00 198,145.15
3 Batu Pecah Mesin 2/3 0.753 m3 425,000.00 320,166.67
4 Air 215.000 Liter 100.00 21,500.00
5
6

Jumlah Rp540,410
C Peralatan :
1
2

Jumlah Rp0
D Jumlah A + B + C Rp 540,613
E Overhead + Profit 15 % Rp 81,092
F Harga Satuan Pekerjaan (D + E) Rp 621,705

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 14,5 Mpa (K175)


Satuan : 1 m3
Harga Satuan : Rp 614,990
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 6.520 zak 100.00 652.00
2 Pasir Beton 0.543 m3 347,188.00 188,473.49
3 Batu Pecah Mesin 2/3 0.762 m3 425,000.00 323,944.44
4 Air 215.000 Liter 100.00 21,500.00
5
6

Jumlah Rp534,570
C Peralatan :
1
2

Jumlah Rp0
D Jumlah A + B + C Rp 534,774
E Overhead + Profit 15 % Rp 80,216
F Harga Satuan Pekerjaan (D + E) Rp 614,990

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 16,9 Mpa (K200)


Satuan : 1 m3
Harga Satuan : Rp 607,503
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 7.040 zak 100.00 704.00
2 Pasir Beton 0.522 m3 347,188.00 181,281.73
3 Batu Pecah Mesin 2/3 0.764 m3 425,000.00 324,574.07
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp528,060
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 528,263
E Overhead + Profit 15 % Rp 79,240
F Harga Satuan Pekerjaan (D + E) Rp 607,503

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 19,3 Mpa (K225)


Satuan : 1 m3
Harga Satuan : Rp 603,928
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 7.420 zak 100.00 742.00
2 Pasir Beton 0.499 m3 347,188.00 173,098.02
3 Batu Pecah Mesin 2/3 0.776 m3 425,000.00 329,611.11
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp524,951
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 525,155
E Overhead + Profit 15 % Rp 78,773
F Harga Satuan Pekerjaan (D + E) Rp 603,928

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 21,7 Mpa (K250)


Satuan : 1 m3
Harga Satuan : Rp 599,350
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 7.680 zak 100.00 768.00
2 Pasir Beton 0.494 m3 347,188.00 171,610.07
3 Batu Pecah Mesin 2/3 0.770 m3 425,000.00 327,092.59
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp520,971
C Peralatan :
1
Jumlah Rp0
D Jumlah A + B + C Rp 521,174
E Overhead + Profit 15 % Rp 78,176
F Harga Satuan Pekerjaan (D + E) Rp 599,350

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 24 Mpa (K275)


Satuan : 1 m3
Harga Satuan : Rp 592,413
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 8.120 zak 100.00 812.00
2 Pasir Beton 0.489 m3 347,188.00 169,626.14
3 Batu Pecah Mesin 2/3 0.760 m3 425,000.00 323,000.00
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp514,938
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 515,142
E Overhead + Profit 15 % Rp 77,271
F Harga Satuan Pekerjaan (D + E) Rp 592,413

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 26,4 Mpa (K300)


Satuan : 1 m3
Harga Satuan : Rp 589,763
Total Koefisien : 2.036 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 1.650 OH 100.00 165.00
2 Tukang Batu 0.275 OH 100.00 27.50
3 Kepala Tukang 0.028 OH 100.00 2.80
4 Mandor 0.083 OH 100.00 8.30

Jumlah 2.036 OH Jumlah Rp204


B Bahan :
1 Semen PC /50 kg 8.260 zak 100.00 826.00
2 Pasir Beton 0.486 m3 347,188.00 168,882.16
3 Batu Pecah Mesin 2/3 0.756 m3 425,000.00 321,425.93
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp512,634
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 512,838
E Overhead + Profit 15 % Rp 76,926
F Harga Satuan Pekerjaan (D + E) Rp 589,763

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 28,8 Mpa (K325)


Satuan : 1 m3
Harga Satuan : Rp 581,319
Total Koefisien : 2.590 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 2.100 OH 100.00 210.00
2 Tukang Batu 0.350 OH 100.00 35.00
3 Kepala Tukang 0.035 OH 100.00 3.50
4 Mandor 0.105 OH 100.00 10.50

Jumlah 2.590 OH Jumlah Rp259


B Bahan :
1 Semen PC /50 kg 8.780 zak 100.00 878.00
2 Pasir Beton 0.479 m3 347,188.00 166,154.26
3 Batu Pecah Mesin 2/3 0.745 m3 425,000.00 316,703.70
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp505,236
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 505,495
E Overhead + Profit 15 % Rp 75,824
F Harga Satuan Pekerjaan (D + E) Rp 581,319

Jenis Pekerjaan : Pembuatan Beton Mutu F'C = 31,2 Mpa (K350)


Satuan : 1 m3
Harga Satuan : Rp 578,312
Total Koefisien : 2.590 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 2.100 OH 100.00 210.00
2 Tukang Batu 0.350 OH 100.00 35.00
3 Kepala Tukang 0.035 OH 100.00 3.50
4 Mandor 0.105 OH 100.00 10.50

Jumlah 2.590 OH Jumlah Rp259


B Bahan :
1 Semen PC /50 kg 8.960 zak 100.00 896.00
2 Pasir Beton 0.476 m3 347,188.00 165,410.28
3 Batu Pecah Mesin 2/3 0.741 m3 425,000.00 314,814.81
4 Air 215.000 Liter 100.00 21,500.00

Jumlah Rp502,621
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 502,880
E Overhead + Profit 15 % Rp 75,432
F Harga Satuan Pekerjaan (D + E) Rp 578,312

Jenis Pekerjaan : Pembuatan Beton Kedap Air Dengan Aditif Kedap Air
Satuan : 1 m3
Harga Satuan : Rp 608,154
Total Koefisien : 2.590 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 2.100 OH 100.00 210.00
2 Tukang Batu 0.350 OH 100.00 35.00
3 Kepala Tukang 0.035 OH 100.00 3.50
4 Mandor 0.105 OH 100.00 10.50

Jumlah 2.590 OH Jumlah Rp259


B Bahan :
1 Semen PC /50 kg 8.000 zak 100.00 800.00
2 Pasir Beton 0.480 m3 347,188.00 166,650.24
3 Batu Pecah Mesin 2/3 0.800 m3 425,000.00 340,000.00
4 Strorox-100 1.200 kg 100.00 120.00
5 Air 210.000 Liter 100.00 21,000.00

Jumlah Rp528,570
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 528,829
E Overhead + Profit 15 % Rp 79,324
F Harga Satuan Pekerjaan (D + E) Rp 608,154

Jenis Pekerjaan : Memasang PCV Waterstop Lebar 150 mm


Satuan : 1 m1
Harga Satuan : Rp 134
Total Koefisien : 0.116 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.070 OH 100.00 7.00
2 Tukang Batu 0.035 OH 100.00 3.50
3 Kepala Tukang 0.004 OH 100.00 0.40
4 Mandor 0.007 OH 100.00 0.70

Jumlah 0.116 OH Jumlah Rp12


B Bahan :
1 Waterstop, lebar 150 mm 1.050 m' 100.00 105.00
Jumlah Rp105
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 117
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 134

Jenis Pekerjaan : Memasang PCV Waterstop Lebar 200 mm


Satuan : 1 m1
Harga Satuan : Rp 134
Total Koefisien : 0.116 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.070 OH 100.00 7.00
2 Tukang Batu 0.035 OH 100.00 3.50
3 Kepala Tukang 0.004 OH 100.00 0.40
4 Mandor 0.007 OH 100.00 0.70

Jumlah 0.116 OH Jumlah Rp12


B Bahan :
1 Waterstop, lebar 200 mm 1.050 m' 100.00 105.00

Jumlah Rp105
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 117
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 134

Jenis Pekerjaan : Memasang PCV Waterstop Lebar 230 - 300 mm


Satuan : 1 m1
Harga Satuan : Rp 134
Total Koefisien : 0.116 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.070 OH 100.00 7.00
2 Tukang Batu 0.035 OH 100.00 3.50
3 Kepala Tukang 0.004 OH 100.00 0.40
4 Mandor 0.007 OH 100.00 0.70

Jumlah 0.116 OH Jumlah Rp12


B Bahan :
1 Waterstop, lebar 320 mm 1.050 m' 100.00 105.00

Jumlah Rp105
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 117
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 134

Jenis Pekerjaan : Memasang Pembesian Dengan Besi Beton Polis atau Ulir
Satuan : 1 kg
Harga Satuan : Rp 155
Total Koefisien : 0.151 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.070 OH 100.00 7.00
2 Tukang Besi 0.070 OH 100.00 7.00
3 Kepala Tukang 0.007 OH 100.00 0.70
4 Mandor 0.004 OH 100.00 0.40

Jumlah 0.151 OH Jumlah Rp15


B Bahan :
1 Besi Beton U-39/U-32 Rata-rata 1.050 kg 100.00 105.00
2 Kawat Beton 0.150 kg 100.00 15.00
3
4
5

Jumlah Rp120
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 135
E Overhead + Profit 15 % Rp 20
F Harga Satuan Pekerjaan (D + E) Rp 155

Jenis Pekerjaan : Memasang Kabel Presstressed Polos / Strands


Satuan : 1 kg
Harga Satuan : Rp 135
Total Koefisien : 0.108 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.050 OH 100.00 5.00
2 Tukang Besi 0.050 OH 100.00 5.00
3 Kepala Tukang 0.005 OH 100.00 0.50
4 Mandor 0.003 OH 100.00 0.30

Jumlah 0.108 OH Jumlah Rp11


B Bahan :
1 Besi Beton U-39/U-32 Rata-rata 1.050 kg 100.00 105.00
2 Kawat Beton 0.015 kg 100.00 1.50
3
4
5

Jumlah Rp107
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 117
E Overhead + Profit 15 % Rp 18
F Harga Satuan Pekerjaan (D + E) Rp 135

Jenis Pekerjaan : Memasang Jaringan Anyam Tulangan Tunggal (Wiremesh) M6 - M8


Satuan : 1 kg
Harga Satuan : Rp 127
Total Koefisien : 0.076 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Tukang Besi 0.025 OH 100.00 2.50
3 Kepala Tukang 0.025 OH 100.00 2.50
4 Mandor 0.001 OH 100.00 0.10

Jumlah 0.076 OH Jumlah Rp8


B Bahan :
1 Wiremesh M (rata-rata) 1.020 m2 100.00 102.00
2 Kawat Beton 0.005 kg 100.00 0.50
3
4
5

Jumlah Rp103
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 110
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 127

Jenis Pekerjaan : Memasang Bekisting untuk Pondasi Telapak Beton Bangunan Gedung
Satuan : 1 m2
Harga Satuan : Rp 146
Total Koefisien : 0.832 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.520 OH 100.00 52.00
2 Tukang Kayu 0.260 OH 100.00 26.00
3 Kepala Tukang 0.026 OH 100.00 2.60
4 Mandor 0.026 OH 100.00 2.60

Jumlah 0.832 OH Jumlah Rp83


B Bahan :
1 Kayu Papan Kelas III 0.040 m3 100.00 4.00
2 Paku 8 cm s/d 12 cm 0.300 kg 100.00 30.00
3 Minyak Bekisting 0.100 ltr 100.00 10.00
Jumlah Rp44
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 127
E Overhead + Profit 15 % Rp 19
F Harga Satuan Pekerjaan (D + E) Rp 146

Jenis Pekerjaan : Pemasangan Bekisting untuk Sloof Bangunan Gedung


Satuan : 1 m2
Harga Satuan : Rp 147
Total Koefisien : 0.832 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.520 OH 100.00 52.00
2 Tukang Kayu 0.260 OH 100.00 26.00
3 Kepala Tukang 0.026 OH 100.00 2.60
4 Mandor 0.026 OH 100.00 2.60

Jumlah 0.832 OH Jumlah Rp83


B Bahan :
1 Kayu Papan Kelas III 0.045 m3 100.00 4.50
2 Paku 8 cm s/d 12 cm 0.300 kg 100.00 30.00
3 Minyak Bekisting 0.100 ltr 100.00 10.00

Jumlah Rp45
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 128
E Overhead + Profit 15 % Rp 19
F Harga Satuan Pekerjaan (D + E) Rp 147

Jenis Pekerjaan : Pemasangan Bekisting untuk Kolom Bangunan Gedung


Satuan : 1 m2
Harga Satuan : #N/A
Total Koefisien : 1.056 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.660 OH 100.00 66.00
2 Tukang Kayu 0.330 OH 100.00 33.00
3 Kepala Tukang 0.033 OH 100.00 3.30
4 Mandor 0.033 OH 100.00 3.30

Jumlah 1.056 OH Jumlah Rp106


B Bahan :
1 Kayu Papan Kelas III 0.040 m3 100.00 4.00
2 Paku 8 cm s/d 12 cm 0.400 kg 100.00 40.00
3 Minyak Bekisting 0.200 ltr 100.00 20.00
4 Kayu Balok Kelas II 0.015 #N/A #N/A #N/A
5 Multipleks 9 mm 120x240 0.350 lbr 100.00 35.00
6 Dolken 7 s/d 10 2.000 btg 100.00 200.00

Jumlah #N/A
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C #N/A
E Overhead + Profit 15 % #N/A
F Harga Satuan Pekerjaan (D + E) #N/A

Jenis Pekerjaan : Pemasangan Bekisting untuk Balok Bangunan Gedung


Satuan : 1 m2
Harga Satuan : #N/A
Total Koefisien : 1.056 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.660 OH 100.00 66.00
2 Tukang Kayu 0.330 OH 100.00 33.00
3 Kepala Tukang 0.033 OH 100.00 3.30
4 Mandor 0.033 OH 100.00 3.30

Jumlah 1.056 OH Jumlah Rp106


B Bahan :
1 Kayu Papan Kelas III 0.040 m3 100.00 4.00
2 Paku 8 cm s/d 12 cm 0.400 kg 100.00 40.00
3 Minyak Bekisting 0.200 ltr 100.00 20.00
4 Kayu Balok Kelas II 0.018 #N/A #N/A #N/A
5 Multipleks 9 mm 120x240 0.350 lbr 100.00 35.00
6 Dolken 7 s/d 10 2.000 btg 100.00 200.00

Jumlah #N/A
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C #N/A
E Overhead + Profit 15 % #N/A
F Harga Satuan Pekerjaan (D + E) #N/A

Jenis Pekerjaan : Pemasangan Bekisting untuk Plat Lantai Beton Bangunan Gedung
Satuan : 1 m2
Harga Satuan : #N/A
Total Koefisien : 1.056 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.660 OH 100.00 66.00
2 Tukang Kayu 0.330 OH 100.00 33.00
3 Kepala Tukang 0.033 OH 100.00 3.30
4 Mandor 0.033 OH 100.00 3.30

Jumlah 1.056 OH Jumlah Rp106


B Bahan :
1 Kayu Papan Kelas III 0.040 m3 100.00 4.00
2 Paku 8 cm s/d 12 cm 0.400 kg 100.00 40.00
3 Minyak Bekisting 0.200 #N/A 100.00 20.00
4 Kayu Balok Kelas II 0.015 ltr #N/A #N/A
5 Multipleks 9 mm 120x240 0.350 lbr 100.00 35.00
6 Dolken 7 s/d 10 6.000 btg 100.00 600.00

Jumlah #N/A
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C #N/A
E Overhead + Profit 15 % #N/A
F Harga Satuan Pekerjaan (D + E) #N/A

Jenis Pekerjaan : Memasang Bekisting untuk Dinding Sheerwall


Satuan : 1 m2
Harga Satuan : Rp 627
Total Koefisien : 1.056 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.660 OH 100.00 66.00
2 Tukang Kayu 0.330 OH 100.00 33.00
3 Kepala Tukang 0.033 OH 100.00 3.30
4 Mandor 0.033 OH 100.00 3.30

Jumlah 1.056 OH Jumlah Rp106


B Bahan :
1 Kayu Papan Kelas III 0.030 m3 100.00 3.00
2 Paku 8 cm s/d 12 cm 0.400 kg 100.00 40.00
3 Minyak Bekisting 0.200 ltr 100.00 20.00
4 Kayu Kamper Singkil/Kapur (K. Samarinda Kla 0.020 m3 100.00 2.00
5 Multipleks 9 mm 120x240 0.350 lbr 100.00 35.00
6 Dolken 7 s/d 10 3.000 btg 100.00 300.00
7 Formite/penjaga jarak bekisting/spacer 4.000 bh 10.00 40.00

Jumlah Rp440
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 546
E Overhead + Profit 15 % Rp 82
F Harga Satuan Pekerjaan (D + E) Rp 627

Jenis Pekerjaan : Memasang Bekisting untuk Dinding Tangga Beton Bangunan Gedung
Satuan : 1 m2
Harga Satuan : Rp 460
Total Koefisien : 1.056 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.660 OH 100.00 66.00
2 Tukang Kayu 0.330 OH 100.00 33.00
3 Kepala Tukang 0.033 OH 100.00 3.30
4 Mandor 0.033 OH 100.00 3.30

Jumlah 1.056 OH Jumlah Rp106


B Bahan :
1 Kayu Papan Kelas III 0.030 m3 100.00 3.00
2 Paku 8 cm s/d 12 cm 0.400 kg 100.00 40.00
3 Minyak Bekisting 0.150 ltr 100.00 15.00
4 Kayu Kamper Singkil/Kapur (K. Samarinda Kla 0.015 m3 100.00 1.50
5 Multipleks 9 mm 120x240 0.350 lbr 100.00 35.00
6 Dolken 7 s/d 10 2.000 btg 100.00 200.00

Jumlah Rp295
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 400
E Overhead + Profit 15 % Rp 60
F Harga Satuan Pekerjaan (D + E) Rp 460

Jenis Pekerjaan : Memasang Bekisting Jembatan untuk Pengecoran Beton


Satuan : 1 m2
Harga Satuan : Rp 154
Total Koefisien : 0.213 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Tukang Kayu 0.050 OH 100.00 5.00
3 Kepala Tukang 0.005 OH 100.00 0.50
4 Mandor 0.008 OH 100.00 0.80

Jumlah 0.213 OH Jumlah Rp21


B Bahan :
1 Kayu Papan Kelas III 0.026 m3 100.00 2.64
2 Paku 8 cm s/d 12 cm 0.600 kg 100.00 60.00
3 Dolken 7 s/d 10 0.500 btg 100.00 50.00

Jumlah Rp113
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 134
E Overhead + Profit 15 % Rp 20
F Harga Satuan Pekerjaan (D + E) Rp 154

E.1 PEKERJAAN BETON PRACETAK


Jenis Pekerjaan : Pembuatan Bekisting untuk Pelat Beton Pracetak Komponen Modular Bangunan (5x pakai)
Satuan : 1 m2
Harga Satuan : Rp 521
Total Koefisien : 0.092 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.007 OH 100.00 0.70
2 Tukang Kayu 0.076 OH 100.00 7.60
3 Kepala Tukang 0.008 OH 100.00 0.80
4 Mandor 0.001 OH 100.00 0.10

Jumlah 0.092 OH Jumlah Rp9


B Bahan :
1 Lantai kerja beton t=10 cm 0.008 m3 10.00 0.08
2 Besi Hallow ( 50 x 50 x 3 mm ) 0.347 btg 100.00 34.66
3 Kayu Kaso 5/7 0.005 m3 100.00 0.50
4 Phenol film 12 mm 0.080 Lbr 10.00 0.80
5 Minyak Bekisting 0.200 ltr 100.00 20.00
6 Ramset/Dynabolt (rata-rata) 3.882 bh 100.00 388.20
7

Jumlah Rp444
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 453
E Overhead + Profit 15 % Rp 68
F Harga Satuan Pekerjaan (D + E) Rp 521

Jenis Pekerjaan : Pembuatan Bekisting untuk Balok Beton Pracetak (10-12 kali pakai)
Satuan : 1 m2
Harga Satuan : Rp 94
Total Koefisien : 0.047 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.004 OH 100.00 0.40
2 Tukang Kayu 0.038 OH 100.00 3.80
3 Kepala Tukang 0.004 OH 100.00 0.40
4 Mandor 0.001 OH 100.00 0.10

Jumlah 0.047 OH Jumlah Rp5


B Bahan :
3 Kayu Kaso 5/7 0.005 m3 100.00 0.50
4 Phenol film 12 mm 0.043 Lbr 10.00 0.43
5 Minyak Bekisting 0.020 ltr 100.00 2.00
6 Paku 4 cm s/d 7 cm 0.046 kg 100.00 4.60
7 Ramset/Dynabolt (rata-rata) 0.693 bh 100.00 69.30

Jumlah Rp77
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 82
E Overhead + Profit 15 % Rp 12
F Harga Satuan Pekerjaan (D + E) Rp 94

Jenis Pekerjaan :
Satuan :
Harga Satuan : Rp -
Total Koefisien : 0.000 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1
2
3
4

Jumlah 0.000 OH Jumlah Rp0


B Bahan :
3
4
5
6
7

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp -
E Overhead + Profit 15 % Rp -
F Harga Satuan Pekerjaan (D + E) Rp -

F.1 PEKERJAAN PASANG DINDING


Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 2 PP)- 17,2 Mpa
Satuan : 1 m2
Harga Satuan : Rp 48,239
Total Koefisien : 0.850 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.600 OH 100.00 60.00
2 Tukang Batu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.030 OH 100.00 3.00

Jumlah 0.850 OH Jumlah Rp85


B Bahan :
3 Bata Merah (rata-rata) 140.000 bh 100.00 14,000.00
4 Semen PC /50 kg 0.870 zak 100.00 87.00
5 Pasir Pasang 0.080 m3 347,188.00 27,775.04
6
7
Jumlah Rp41,862
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 41,947
E Overhead + Profit 15 % Rp 6,292
F Harga Satuan Pekerjaan (D + E) Rp 48,239

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 3 PP)-12,5 Mpa
Satuan : 1 m2
Harga Satuan : Rp 52,607
Total Koefisien : 0.850 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.600 OH 100.00 60.00
2 Tukang Batu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.030 OH 100.00 3.00

Jumlah 0.850 OH Jumlah Rp85


B Bahan :
3 Bata Merah (rata-rata) 140.000 bh 100.00 14,000.00
4 Semen PC /50 kg 0.659 zak 100.00 65.90
5 Pasir Pasang 0.091 m3 347,188.00 31,594.11
6
7

Jumlah Rp45,660
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 45,745
E Overhead + Profit 15 % Rp 6,862
F Harga Satuan Pekerjaan (D + E) Rp 52,607

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 4 PP)-5,2 Mpa
Satuan : 1 m2
Harga Satuan : Rp 53,391
Total Koefisien : 0.850 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.600 OH 100.00 60.00
2 Tukang Batu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.030 OH 100.00 3.00

Jumlah 0.850 OH Jumlah Rp85


B Bahan :
3 Bata Merah (rata-rata) 140.000 bh 100.00 14,000.00
4 Semen PC /50 kg 0.531 zak 100.00 53.10
5 Pasir Pasang 0.093 m3 347,188.00 32,288.48
6
7

Jumlah Rp46,342
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 46,427
E Overhead + Profit 15 % Rp 6,964
F Harga Satuan Pekerjaan (D + E) Rp 53,391

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 5 PP)-2,4 Mpa
Satuan : 1 m2
Harga Satuan : Rp 56,974
Total Koefisien : 0.850 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.600 OH 100.00 60.00
2 Tukang Batu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.030 OH 100.00 3.00

Jumlah 0.850 OH Jumlah Rp85


B Bahan :
3 Bata Merah (rata-rata) 140.000 bh 100.00 14,000.00
4 Semen PC /50 kg 0.444 zak 100.00 44.40
5 Pasir Pasang 0.102 m3 347,188.00 35,413.18
6
7

Jumlah Rp49,458
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 49,543
E Overhead + Profit 15 % Rp 7,431
F Harga Satuan Pekerjaan (D + E) Rp 56,974

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 6 PP)
Satuan : 1 m2
Harga Satuan : Rp 64,951
Total Koefisien : 0.850 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.600 OH 100.00 60.00
2 Tukang Batu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.030 OH 100.00 3.00

Jumlah 0.850 OH Jumlah Rp85


B Bahan :
3 Bata Merah (rata-rata) 140.000 bh 100.00 14,000.00
4 Semen PC /50 kg 0.370 zak 100.00 37.00
5 Pasir Pasang 0.122 m3 347,188.00 42,356.94
6
7

Jumlah Rp56,394
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 56,479
E Overhead + Profit 15 % Rp 8,472
F Harga Satuan Pekerjaan (D + E) Rp 64,951

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 2 PP)-17,7 Mpa
Satuan : 1 m2
Harga Satuan : Rp 23,315
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Merah (rata-rata) 70.000 bh 100.00 7,000.00
4 Semen PC /50 kg 0.379 zak 100.00 37.90
5 Pasir Pasang 0.038 m3 347,188.00 13,193.14
6
7

Jumlah Rp20,231
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 20,274
E Overhead + Profit 15 % Rp 3,041
F Harga Satuan Pekerjaan (D + E) Rp 23,315

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 3 PP)-12,5 Mpa
Satuan : 1 m2
Harga Satuan : Rp 24,103
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Merah (rata-rata) 70.000 bh 100.00 7,000.00
4 Semen PC /50 kg 0.287 zak 100.00 28.74
5 Pasir Pasang 0.040 m3 347,188.00 13,887.52
6
7

Jumlah Rp20,916
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 20,959
E Overhead + Profit 15 % Rp 3,144
F Harga Satuan Pekerjaan (D + E) Rp 24,103

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 4 PP)-5,2 Mpa
Satuan : 1 m2
Harga Satuan : Rp 24,096
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Merah (rata-rata) 70.000 bh 100.00 7,000.00
4 Semen PC /50 kg 0.230 zak 100.00 23.00
5 Pasir Pasang 0.040 m3 347,188.00 13,887.52
6
7

Jumlah Rp20,911
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 20,953
E Overhead + Profit 15 % Rp 3,143
F Harga Satuan Pekerjaan (D + E) Rp 24,096

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 5 PP)-2,4 Mpa
Satuan : 1 m2
Harga Satuan : Rp 24,092
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Merah (rata-rata) 70.000 bh 100.00 7,000.00
4 Semen PC /50 kg 0.194 zak 100.00 19.36
5 Pasir Pasang 0.040 m3 347,188.00 13,887.52
6
7

Jumlah Rp20,907
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 20,949
E Overhead + Profit 15 % Rp 3,142
F Harga Satuan Pekerjaan (D + E) Rp 24,092

Jenis Pekerjaan : Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 6 PP)
Satuan : 1 m2
Harga Satuan : Rp 24,089
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Merah (rata-rata) 70.000 bh 100.00 7,000.00
4 Semen PC /50 kg 0.166 zak 100.00 16.64
5 Pasir Pasang 0.040 m3 347,188.00 13,887.52
6
7

Jumlah Rp20,904
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 20,947
E Overhead + Profit 15 % Rp 3,142
F Harga Satuan Pekerjaan (D + E) Rp 24,089

Jenis Pekerjaan : Memasang Dinding Conblok HB20 (Campuran 1 SP : 3 PP)-12,5 Mpa


Satuan : 1 m2
Harga Satuan : Rp 292,267
Total Koefisien : 0.533 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.350 OH 100.00 35.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.018 OH 100.00 1.80

Jumlah 0.533 OH Jumlah Rp53


B Bahan :
3 Conblok HB20 12.500 bh 100.00 1,250.00
4 Semen PC /50 kg 0.606 zak 100.00 60.64
5 Pasir Pasang 0.728 m3 347,188.00 252,752.86
6 Besi Beton U-39/U-32 Rata-rata 0.280 kg 100.00 28.00
7

Jumlah Rp254,092
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 254,145
E Overhead + Profit 15 % Rp 38,122
F Harga Satuan Pekerjaan (D + E) Rp 292,267

Jenis Pekerjaan : Memasang Dinding Conblok HB20 (Campuran 1 SP : 4 PP)-5,2 Mpa


Satuan : 1 m2
Harga Satuan : Rp 309,820
Total Koefisien : 0.533 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.350 OH 100.00 35.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.018 OH 100.00 1.80

Jumlah 0.533 OH Jumlah Rp53


B Bahan :
3 Conblok HB20 12.500 bh 100.00 1,250.00
4 Semen PC /50 kg 0.485 zak 100.00 48.52
5 Pasir Pasang 0.772 m3 347,188.00 268,029.14
6 Besi Beton U-39/U-32 Rata-rata 0.280 kg 100.00 28.00
7

Jumlah Rp269,356
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 269,409
E Overhead + Profit 15 % Rp 40,411
F Harga Satuan Pekerjaan (D + E) Rp 309,820
Jenis Pekerjaan : Memasang Dinding Conblok HB15 (Campuran 1 SP : 3 PP)-12,5 Mpa
Satuan : 1 m2
Harga Satuan : Rp 221,170
Total Koefisien : 0.448 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.120 OH 100.00 12.00
3 Kepala Tukang 0.012 OH 100.00 1.20
4 Mandor 0.016 OH 100.00 1.60

Jumlah 0.448 OH Jumlah Rp45


B Bahan :
3 Conblok HB15 12.500 bh 100.00 1,250.00
4 Semen PC /50 kg 0.455 zak 100.00 45.48
5 Pasir Pasang 0.550 m3 347,188.00 190,953.40
6 Besi Beton U-39/U-32 Rata-rata 0.280 kg 100.00 28.00
7

Jumlah Rp192,277
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 192,322
E Overhead + Profit 15 % Rp 28,848
F Harga Satuan Pekerjaan (D + E) Rp 221,170

Jenis Pekerjaan : Memasang Dinding Conblok HB15 (Campuran 1 SP : 4 PP)-5,2 Mpa


Satuan : 1 m2
Harga Satuan : Rp 221,159
Total Koefisien : 0.448 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.120 OH 100.00 12.00
3 Kepala Tukang 0.012 OH 100.00 1.20
4 Mandor 0.016 OH 100.00 1.60

Jumlah 0.448 OH Jumlah Rp45


B Bahan :
3 Conblok HB15 12.500 bh 100.00 1,250.00
4 Semen PC /50 kg 0.364 zak 100.00 36.40
5 Pasir Pasang 0.550 m3 347,188.00 190,953.40
6 Besi Beton U-39/U-32 Rata-rata 0.280 kg 100.00 28.00
7

Jumlah Rp192,268
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 192,313
E Overhead + Profit 15 % Rp 28,847
F Harga Satuan Pekerjaan (D + E) Rp 221,159

Jenis Pekerjaan : Memasang Dinding Conblok HB10 (Campuran 1 SP : 3 PP)-12,5 Mpa


Satuan : 1 m2
Harga Satuan : Rp 146,886
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Conblok HB10 12.500 bh 100.00 1,250.00
4 Semen PC /50 kg 0.303 zak 100.00 30.32
5 Pasir Pasang 0.364 m3 347,188.00 126,376.43
6 Besi Beton U-39/U-32 Rata-rata 0.280 kg 100.00 28.00
7

Jumlah Rp127,685
C Peralatan :
1
Jumlah Rp0
D Jumlah A + B + C Rp 127,727
E Overhead + Profit 15 % Rp 19,159
F Harga Satuan Pekerjaan (D + E) Rp 146,886

Jenis Pekerjaan : Memasang Dinding Conblok HB10 (Campuran 1 SP : 4 PP)-5,2 Mpa


Satuan : 1 m2
Harga Satuan : Rp 156,462
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Conblok HB10 12.500 bh 100.00 1,250.00
4 Semen PC /50 kg 0.243 zak 100.00 24.26
5 Pasir Pasang 0.388 m3 347,188.00 134,708.94
6 Besi Beton U-39/U-32 Rata-rata 0.280 kg 100.00 28.00
7

Jumlah Rp136,011
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 136,054
E Overhead + Profit 15 % Rp 20,408
F Harga Satuan Pekerjaan (D + E) Rp 156,462

Jenis Pekerjaan : Memasang Dinding Terawang (rooster) 12x11x24 cm (1 PC : 3 PP)-12,5 Mpa


Satuan : 1 m2
Harga Satuan : Rp 17,498
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Rooster (12 x 11 x 24) cm 30.000 bh 100.00 3,000.00
4 Semen PC /50 kg 0.220 zak 100.00 22.00
5 Pasir Pasang 0.035 m3 347,188.00 12,151.58
7

Jumlah Rp15,174
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,216
E Overhead + Profit 15 % Rp 2,282
F Harga Satuan Pekerjaan (D + E) Rp 17,498

Jenis Pekerjaan : Memasang Dinding Terawang (rooster) 12x11x24 cm (1 PC : 4 PP)-5,2 Mpa


Satuan : 1 m2
Harga Satuan : Rp 17,498
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Bata Rooster (12 x 11 x 24) cm 30.000 bh 100.00 3,000.00
4 Semen PC /50 kg 0.220 zak 100.00 22.00
5 Pasir Pasang 0.035 m3 347,188.00 12,151.58
7
Jumlah Rp15,174
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,216
E Overhead + Profit 15 % Rp 2,282
F Harga Satuan Pekerjaan (D + E) Rp 17,498

Jenis Pekerjaan : Memasang Dinding Bata Berongga Ekspose 12x11x24 (1 SP : 3 PP)-12,5 Mpa
Satuan : 1 m2
Harga Satuan : Rp 20,914
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Bata Berongga Expose 70.000 bh 100.00 7,000.00
4 Semen PC /50 kg 0.280 zak 100.00 28.00
5 Pasir Pasang 0.032 m3 347,188.00 11,110.02
7

Jumlah Rp18,138
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 18,186
E Overhead + Profit 15 % Rp 2,728
F Harga Satuan Pekerjaan (D + E) Rp 20,914

Jenis Pekerjaan : Memasang Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai
Satuan : 1 m2
Harga Satuan : Rp 1,158
Total Koefisien : 0.816 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.670 OH 100.00 67.00
2 Tukang Batu 0.130 OH 100.00 13.00
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.003 OH 100.00 0.30

Jumlah 0.816 OH Jumlah Rp82


B Bahan :
3 Bata Ringan tebal 7,5 cm 8.400 bh 100.00 840.00
4 Semen Mortar Bata Ringan (Rata-rata)/40 Kg 0.012 zak 100.00 1.18
5
7

Jumlah Rp841
C Peralatan :
1 10% dari bahan 1.000 % 84.12 84.12

Jumlah Rp84
D Jumlah A + B + C Rp 1,007
E Overhead + Profit 15 % Rp 151
F Harga Satuan Pekerjaan (D + E) Rp 1,158

Jenis Pekerjaan : Memasang Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
Satuan : 1 m2
Harga Satuan : Rp 1,157
Total Koefisien : 0.817 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.671 OH 100.00 67.10
2 Tukang Batu 0.130 OH 100.00 13.00
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.003 OH 100.00 0.30

Jumlah 0.817 OH Jumlah Rp82


B Bahan :
3 Bata Ringan tebal 7,5 cm 8.400 bh 100.00 840.00
4 Semen Mortar Bata Ringan (Rata-rata)/40 Kg 0.002 zak 100.00 0.16
5
7

Jumlah Rp840
C Peralatan :
1 10% dari bahan 1.000 % 84.02 84.02

Jumlah Rp84
D Jumlah A + B + C Rp 1,006
E Overhead + Profit 15 % Rp 151
F Harga Satuan Pekerjaan (D + E) Rp 1,157

G.1 PEKERJAAN PLESTERAN


Jenis Pekerjaan : Memasang Berapen (1 SP : 5 PP) t = 15 mm
Satuan : 1 m2
Harga Satuan : Rp 10,421
Total Koefisien : 0.241 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Tukang Batu 0.075 OH 100.00 7.50
3 Kepala Tukang 0.008 OH 100.00 0.80
4 Mandor 0.008 OH 100.00 0.80

Jumlah 0.241 OH Jumlah Rp24


B Bahan :
3 Semen PC /50 kg 0.104 zak 100.00 10.37
4 Pasir Pasang 0.026 m3 347,188.00 9,026.89
5
7

Jumlah Rp9,037
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 9,061
E Overhead + Profit 15 % Rp 1,359
F Harga Satuan Pekerjaan (D + E) Rp 10,421

Jenis Pekerjaan : Memasang Plasteran (1 SP : 1 PP) t = 15 mm


Satuan : 1 m2
Harga Satuan : Rp 6,479
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Semen PC /50 kg 0.310 zak 100.00 31.01
4 Pasir Pasang 0.016 m3 347,188.00 5,555.01
5
7

Jumlah Rp5,586
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 5,634
E Overhead + Profit 15 % Rp 845
F Harga Satuan Pekerjaan (D + E) Rp 6,479

Jenis Pekerjaan : Memasang Plasteran (1 SP : 2 PP) t = 15 mm


Satuan : 1 m2
Harga Satuan : Rp 8,064
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50
Jumlah 0.480 OH Jumlah Rp48
B Bahan :
3 Semen PC /50 kg 0.204 zak 100.00 20.45
4 Pasir Pasang 0.020 m3 347,188.00 6,943.76
5
7

Jumlah Rp6,964
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 7,012
E Overhead + Profit 15 % Rp 1,052
F Harga Satuan Pekerjaan (D + E) Rp 8,064

Jenis Pekerjaan : Memasang Plasteran (1 SP : 3 PP) t = 15 mm


Satuan : 1 m2
Harga Satuan : Rp 8,058
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Semen PC /50 kg 0.156 zak 100.00 15.56
4 Pasir Pasang 0.020 m3 347,188.00 6,943.76
5
7

Jumlah Rp6,959
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 7,007
E Overhead + Profit 15 % Rp 1,051
F Harga Satuan Pekerjaan (D + E) Rp 8,058

Jenis Pekerjaan : Memasang Plasteran (1 SP : 4 PP) t = 15 mm


Satuan : 1 m2
Harga Satuan : Rp 8,055
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Semen PC /50 kg 0.125 zak 100.00 12.48
4 Pasir Pasang 0.020 m3 347,188.00 6,943.76
5
7

Jumlah Rp6,956
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 7,004
E Overhead + Profit 15 % Rp 1,051
F Harga Satuan Pekerjaan (D + E) Rp 8,055

Jenis Pekerjaan : Memasang Plasteran (1 SP : 5 PP) t = 15 mm


Satuan : 1 m2
Harga Satuan : Rp 8,052
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Semen PC /50 kg 0.104 zak 100.00 10.36
4 Pasir Pasang 0.020 m3 347,188.00 6,943.76
5
7

Jumlah Rp6,954
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 7,002
E Overhead + Profit 15 % Rp 1,050
F Harga Satuan Pekerjaan (D + E) Rp 8,052

Jenis Pekerjaan : Memasang Plasteran (1 SP : 1/2 KP : 3 PP) t = 15 mm


Satuan : 1 m2
Harga Satuan : Rp 5,259
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Semen PC /50 kg 0.115 zak 100.00 11.52
4 Pasir Pasang 0.013 m3 347,188.00 4,513.44
5 Kapur Padam 0.003 m3 100.00 0.30
7

Jumlah Rp4,525
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 4,573
E Overhead + Profit 15 % Rp 686
F Harga Satuan Pekerjaan (D + E) Rp 5,259

Jenis Pekerjaan : Memasang Plesteran Skoning (1 SP : 3 PP) L = 10 cm


Satuan : 1 m2
Harga Satuan : Rp 5,256
Total Koefisien : 0.560 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.080 OH 100.00 8.00
2 Tukang Batu 0.400 OH 100.00 40.00
3 Kepala Tukang 0.040 OH 100.00 4.00
4 Mandor 0.040 OH 100.00 4.00

Jumlah 0.560 OH Jumlah Rp56


B Bahan :
3 Semen PC /50 kg 0.010 zak 100.00 1.00
4 Pasir Pasang 0.013 m3 347,188.00 4,513.44
5
7

Jumlah Rp4,514
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 4,570
E Overhead + Profit 15 % Rp 686
F Harga Satuan Pekerjaan (D + E) Rp 5,256

Jenis Pekerjaan : Memasang Plesteran Granit (1 SP : 2 PP) t = 10 cm


Satuan : 1 m2
Harga Satuan : Rp 1,831
Total Koefisien : 0.721 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.450 OH 100.00 45.00
2 Tukang Batu 0.225 OH 100.00 22.50
3 Kepala Tukang 0.023 OH 100.00 2.30
4 Mandor 0.023 OH 100.00 2.30

Jumlah 0.721 OH Jumlah Rp72


B Bahan :
3 Semen PC /50 kg 0.200 zak 100.00 20.00
4 Bubuk Batu Granit 15.000 kg 100.00 1,500.00
5
7

Jumlah Rp1,520
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 1,592
E Overhead + Profit 15 % Rp 239
F Harga Satuan Pekerjaan (D + E) Rp 1,831

Jenis Pekerjaan : Memasang Plesteran Traso (1 SP : 2 PP) t = 10 cm


Satuan : 1 m2
Harga Satuan : Rp 1,831
Total Koefisien : 0.721 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.450 OH 100.00 45.00
2 Tukang Batu 0.225 OH 100.00 22.50
3 Kepala Tukang 0.023 OH 100.00 2.30
4 Mandor 0.023 OH 100.00 2.30

Jumlah 0.721 OH Jumlah Rp72


B Bahan :
3 Semen PC /50 kg 0.200 zak 100.00 20.00
4 Bubuk Traso 15.000 kg 100.00 1,500.00
5
7

Jumlah Rp1,520
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 1,592
E Overhead + Profit 15 % Rp 239
F Harga Satuan Pekerjaan (D + E) Rp 1,831

Jenis Pekerjaan : Memasang Plesteran Ciprat (Kamprotan) (1 SP : 2 SP)


Satuan : 1 m2
Harga Satuan : Rp 2,454
Total Koefisien : 0.425 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.425 OH Jumlah Rp43


B Bahan :
3 Semen PC /50 kg 0.086 zak 100.00 8.64
4 Pasir Pasang 0.006 m3 347,188.00 2,083.13
5
7

Jumlah Rp2,092
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 2,134
E Overhead + Profit 15 % Rp 320
F Harga Satuan Pekerjaan (D + E) Rp 2,454

Jenis Pekerjaan : Memasang Finishing Dinding Siar Pasang Bata Merah


Satuan : 1 m2
Harga Satuan : Rp 35
Total Koefisien : 0.241 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Tukang Batu 0.075 OH 100.00 7.50
3 Kepala Tukang 0.008 OH 100.00 0.80
4 Mandor 0.008 OH 100.00 0.80

Jumlah 0.241 OH Jumlah Rp24


B Bahan :
3 Semen PC /50 kg 0.064 zak 100.00 6.36
4
5
7

Jumlah Rp6
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 30
E Overhead + Profit 15 % Rp 5
F Harga Satuan Pekerjaan (D + E) Rp 35

Jenis Pekerjaan : Memasang Finishing Dinding Siar Conblok Ekspose


Satuan : 1 m2
Harga Satuan : Rp 17
Total Koefisien : 0.113 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.070 OH 100.00 7.00
2 Tukang Batu 0.035 OH 100.00 3.50
3 Kepala Tukang 0.004 OH 100.00 0.40
4 Mandor 0.004 OH 100.00 0.40

Jumlah 0.113 OH Jumlah Rp11


B Bahan :
3 Semen PC /50 kg 0.032 zak 100.00 3.20
4
5
7

Jumlah Rp3
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15
E Overhead + Profit 15 % Rp 2
F Harga Satuan Pekerjaan (D + E) Rp 17

Jenis Pekerjaan : Memasang Finishing Dinding Siar Pasang Batu Kali (1 SP : 2 PP)
Satuan : 1 m2
Harga Satuan : Rp 4,861
Total Koefisien : 0.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.300 OH 100.00 30.00
2 Tukang Batu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.015 OH 100.00 1.50

Jumlah 0.480 OH Jumlah Rp48


B Bahan :
3 Semen PC /50 kg 0.127 zak 100.00 12.68
4 Pasir Pasang 0.012 m3 347,188.00 4,166.26
5
7

Jumlah Rp4,179
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 4,227
E Overhead + Profit 15 % Rp 634
F Harga Satuan Pekerjaan (D + E) Rp 4,861

H.1 PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


Jenis Pekerjaan : Memasang Lantai Ubin PC Abu-abu (Ukuran 20 - 40 cm2)
Satuan : 1 m2
Harga Satuan : Rp 18,279
Total Koefisien : 0.401 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.250 OH 100.00 25.00
2 Tukang Batu 0.125 OH 100.00 12.50
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.013 OH 100.00 1.30

Jumlah 0.401 OH Jumlah Rp40


B Bahan :
3 Ubin Abu-abu 1.060 m2 200.00 212.00
4 Semen PC /50 kg 0.196 zak 100.00 19.60
5 Pasir Pasang 0.045 m3 347,188.00 15,623.46
7

Jumlah Rp15,855
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,895
E Overhead + Profit 15 % Rp 2,384
F Harga Satuan Pekerjaan (D + E) Rp 18,279

Jenis Pekerjaan : Memasang Lantai Ubin Warna (ukuran 30 - 40 cm2)


Satuan : 1 m2
Harga Satuan : Rp 18,351
Total Koefisien : 0.416 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.260 OH 100.00 26.00
2 Tukang Batu 0.130 OH 100.00 13.00
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.013 OH 100.00 1.30

Jumlah 0.416 OH Jumlah Rp42


B Bahan :
3 Ubin Warna 1.060 m2 200.00 212.00
4 Semen PC /50 kg 0.200 zak 100.00 20.00
5 Semen Warna 0.600 kg 100.00 60.00
7 Pasir Pasang 0.045 m3 347,188.00 15,623.46

Jumlah Rp15,915
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,957
E Overhead + Profit 15 % Rp 2,394
F Harga Satuan Pekerjaan (D + E) Rp 18,351

Jenis Pekerjaan : Memasang Lantai Ubin Teraso (Ukuran 30 - 40 cm2)


Satuan : 1 m2
Harga Satuan : Rp 18,429
Total Koefisien : 0.401 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.250 OH 100.00 25.00
2 Tukang Batu 0.125 OH 100.00 12.50
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.013 OH 100.00 1.30

Jumlah 0.401 OH Jumlah Rp40


B Bahan :
3 Ubin Warna 1.060 m2 200.00 212.00
4 Semen PC /50 kg 0.196 zak 100.00 19.60
5 Semen Warna 1.300 kg 100.00 130.00
7 Pasir Pasang 0.045 m3 347,188.00 15,623.46

Jumlah Rp15,985
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 16,025
E Overhead + Profit 15 % Rp 2,404
F Harga Satuan Pekerjaan (D + E) Rp 18,429

Jenis Pekerjaan : Memasang Lantai Ubin Granit (30 cm - 40 cm)


Satuan : 1 m2
Harga Satuan : Rp 18,307
Total Koefisien : 0.401 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.250 OH 100.00 25.00
2 Tukang Batu 0.125 OH 100.00 12.50
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.013 OH 100.00 1.30

Jumlah 0.401 OH Jumlah Rp40


B Bahan :
3 Granit Tile 40x40 1.060 m2 100.00 106.00
4 Semen PC /50 kg 0.196 zak 100.00 19.60
5 Semen Warna 1.300 kg 100.00 130.00
7 Pasir Pasang 0.045 m3 347,188.00 15,623.46

Jumlah Rp15,879
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,919
E Overhead + Profit 15 % Rp 2,388
F Harga Satuan Pekerjaan (D + E) Rp 18,307

Jenis Pekerjaan : Memasang Lantai Ubin Teralux


Satuan : 1 m2
Harga Satuan : Rp 18,332
Total Koefisien : 0.416 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.260 OH 100.00 26.00
2 Tukang Batu 0.130 OH 100.00 13.00
3 Kepala Tukang 0.013 OH 100.00 1.30
4 Mandor 0.013 OH 100.00 1.30

Jumlah 0.416 OH Jumlah Rp42


B Bahan :
3 Ubin Teralux (rata-rata) 1.070 m2 100.00 107.00
4 Semen PC /50 kg 0.192 zak 100.00 19.20
5 Semen Warna 1.500 kg 100.00 150.00
7 Pasir Pasang 0.045 m3 347,188.00 15,623.46

Jumlah Rp15,900
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,941
E Overhead + Profit 15 % Rp 2,391
F Harga Satuan Pekerjaan (D + E) Rp 18,332

Jenis Pekerjaan : Memasang Lantai Plint Ubin Abu-abu 30 s.d 40 cm


Satuan : 1m
Harga Satuan : Rp 1,303
Total Koefisien : 0.194 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.090 OH 100.00 9.00
2 Tukang Batu 0.090 OH 100.00 9.00
3 Kepala Tukang 0.009 OH 100.00 0.90
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.194 OH Jumlah Rp19


B Bahan :
3 Plin Tegel Warna 10x30 0.600 bh 100.00 60.00
4 Semen PC /50 kg 0.025 zak 100.00 2.48
5 Semen Warna 0.100 kg 100.00 10.00
7 Pasir Pasang 0.003 m3 347,188.00 1,041.56

Jumlah Rp1,114
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 1,133
E Overhead + Profit 15 % Rp 170
F Harga Satuan Pekerjaan (D + E) Rp 1,303

Jenis Pekerjaan : Memasang Lantai Keramik Ukuran 30 s.d 40 cm


Satuan : 1 m2
Harga Satuan : Rp 18,291
Total Koefisien : 1.120 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.700 OH 100.00 70.00
2 Tukang Batu 0.350 OH 100.00 35.00
3 Kepala Tukang 0.035 OH 100.00 3.50
4 Mandor 0.035 OH 100.00 3.50

Jumlah 1.120 OH Jumlah Rp112


B Bahan :
3 Keramik (rata-rata) 1.000 m2 100.00 100.00
4 Semen PC /50 kg 0.200 zak 100.00 20.00
5 Semen Warna 0.500 kg 100.00 50.00
7 Pasir Pasang 0.045 m3 347,188.00 15,623.46

Jumlah Rp15,793
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 15,905
E Overhead + Profit 15 % Rp 2,386
F Harga Satuan Pekerjaan (D + E) Rp 18,291

Jenis Pekerjaan :
Satuan :
Harga Satuan : Rp -
Total Koefisien : 0.000 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1
2
3
4

Jumlah 0.000 OH Jumlah Rp0


B Bahan :
3
4
5
7

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp -
E Overhead + Profit 15 % Rp -
F Harga Satuan Pekerjaan (D + E) Rp -

I.1 PEKERJAAN KAYU


Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Jendela, Kayu Kelas I
Satuan : 1 m3
Harga Satuan : Rp 3,784
Total Koefisien : 30.450 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 7.000 OH 100.00 700.00
2 Tukang Kayu 21.000 OH 100.00 2,100.00
3 Kepala Tukang 2.100 OH 100.00 210.00
4 Mandor 0.350 OH 100.00 35.00

Jumlah 30.450 OH Jumlah Rp3,045


B Bahan :
3 Kayu Balok Kelas I 1.100 m3 100.00 110.00
4 Paku 8 cm s/d 12 cm 1.250 kg 100.00 125.00
5 Phenol film 12 mm 1.000 Lbr 10.00 10.00
7
Jumlah Rp245
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 3,290
E Overhead + Profit 15 % Rp 494
F Harga Satuan Pekerjaan (D + E) Rp 3,784

Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Jendela, Kayu Kelas II atau III
Satuan : 1 m3
Harga Satuan : Rp 3,295
Total Koefisien : 26.100 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 6.000 OH 100.00 600.00
2 Tukang Kayu 18.000 OH 100.00 1,800.00
3 Kepala Tukang 1.800 OH 100.00 180.00
4 Mandor 0.300 OH 100.00 30.00

Jumlah 26.100 OH Jumlah Rp2,610


B Bahan :
3 Kayu Balok Kelas II atau III 1.200 m3 100.00 120.00
4 Paku 8 cm s/d 12 cm 1.250 kg 100.00 125.00
5 Phenol film 12 mm 1.000 Lbr 10.00 10.00
7

Jumlah Rp255
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 2,865
E Overhead + Profit 15 % Rp 430
F Harga Satuan Pekerjaan (D + E) Rp 3,295

Jenis Pekerjaan : Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas II
Satuan : 1 m2
Harga Satuan : Rp 185
Total Koefisien : 1.523 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.350 OH 100.00 35.00
2 Tukang Kayu 1.050 OH 100.00 105.00
3 Kepala Tukang 0.105 OH 100.00 10.50
4 Mandor 0.018 OH 100.00 1.80

Jumlah 1.523 OH Jumlah Rp152


B Bahan :
3 Kayu Papan Kelas II 0.040 m3 100.00 4.00
4 Paku 4 cm s/d 7 cm 0.050 kg 100.00 5.00

Jumlah Rp9
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 161
E Overhead + Profit 15 % Rp 24
F Harga Satuan Pekerjaan (D + E) Rp 185

Jenis Pekerjaan : Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas III
Satuan : 1 m2
Harga Satuan : Rp 185
Total Koefisien : 1.523 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.350 OH 100.00 35.00
2 Tukang Kayu 1.050 OH 100.00 105.00
3 Kepala Tukang 0.105 OH 100.00 10.50
4 Mandor 0.018 OH 100.00 1.80

Jumlah 1.523 OH Jumlah Rp152


B Bahan :
3 Kayu Papan Kelas III 0.040 m3 100.00 4.00
4 Paku 4 cm s/d 7 cm 0.050 kg 100.00 5.00
7

Jumlah Rp9
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 161
E Overhead + Profit 15 % Rp 24
F Harga Satuan Pekerjaan (D + E) Rp 185

Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel, Kayu Kelas I atau II
Satuan : 1 m2
Harga Satuan : Rp 181
Total Koefisien : 1.523 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.350 OH 100.00 35.00
2 Tukang Kayu 1.050 OH 100.00 105.00
3 Kepala Tukang 0.105 OH 100.00 10.50
4 Mandor 0.018 OH 100.00 1.80

Jumlah 1.523 OH Jumlah Rp152


B Bahan :
3 Kayu Papan Kelas II 0.040 m3 100.00 4.00
4 Lem Kayu 0.050 kg 20.00 1.00

Jumlah Rp5
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 157
E Overhead + Profit 15 % Rp 24
F Harga Satuan Pekerjaan (D + E) Rp 181

Jenis Pekerjaan : Membuat dan Memasang Pintu dan Jendela Kaca, Kayu Kelas I atau II
Satuan : 1 m2
Harga Satuan : Rp 410
Total Koefisien : 3.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.800 OH 100.00 80.00
2 Tukang Kayu 2.400 OH 100.00 240.00
3 Kepala Tukang 0.240 OH 100.00 24.00
4 Mandor 0.040 OH 100.00 4.00

Jumlah 3.480 OH Jumlah Rp348


B Bahan :
3 Kayu Papan Kelas II 0.024 m3 100.00 2.40
4 Lem Kayu 0.300 kg 20.00 6.00

Jumlah Rp8
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 356
E Overhead + Profit 15 % Rp 53
F Harga Satuan Pekerjaan (D + E) Rp 410

Jenis Pekerjaan : Membuat Daun Pintu Kayu Lapis (playwood) rangkap, rangka tertutup kayu kelas II (L s.d 90 cm)
Satuan : 1 m2
Harga Satuan : Rp 483
Total Koefisien : 3.045 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.700 OH 100.00 70.00
2 Tukang Kayu 2.100 OH 100.00 210.00
3 Kepala Tukang 0.210 OH 100.00 21.00
4 Mandor 0.035 OH 100.00 3.50

Jumlah 3.045 OH Jumlah Rp305


B Bahan :
3 Kayu Papan Kelas II 0.025 m3 100.00 2.50
4 Paku 1 cm s/d 3 cm 0.030 kg 100.00 3.00
Lem Kayu 0.500 kg 20.00 10.00
7 Tripleks 4 mm 120x240 1.000 lbr 100.00 100.00

Jumlah Rp116
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 420
E Overhead + Profit 15 % Rp 63
F Harga Satuan Pekerjaan (D + E) Rp 483

Jenis Pekerjaan : Membuat Daun Pintu Kayu Lapis (playwood) Rangkap, Rangka Ekspose Kayu kelas I atau II
Satuan : 1 m2
Harga Satuan : Rp 533
Total Koefisien : 3.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.800 OH 100.00 80.00
2 Tukang Kayu 2.400 OH 100.00 240.00
3 Kepala Tukang 0.240 OH 100.00 24.00
4 Mandor 0.040 OH 100.00 4.00

Jumlah 3.480 OH Jumlah Rp348


B Bahan :
3 Kayu Papan Kelas II 0.026 m3 100.00 2.56
4 Paku 1 cm s/d 3 cm 0.030 kg 100.00 3.00
Lem Kayu 0.500 kg 20.00 10.00
7 Tripleks 4 mm 120x240 1.000 lbr 100.00 100.00

Jumlah Rp116
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 464
E Overhead + Profit 15 % Rp 70
F Harga Satuan Pekerjaan (D + E) Rp 533

Jenis Pekerjaan : Membuat dan Memasang Jalusi Kusen, Kayu kelas I atau II
Satuan : 1 m2
Harga Satuan : Rp 393
Total Koefisien : 3.205 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.670 OH 100.00 67.00
2 Tukang Kayu 2.000 OH 100.00 200.00
3 Kepala Tukang 0.200 OH 100.00 20.00
4 Mandor 0.335 OH 100.00 33.50

Jumlah 3.205 OH Jumlah Rp321


B Bahan :
3 Kayu Papan Kelas II 0.060 m3 100.00 6.00
4 Paku 1 cm s/d 3 cm 0.150 kg 100.00 15.00

Jumlah Rp21
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 342
E Overhead + Profit 15 % Rp 51
F Harga Satuan Pekerjaan (D + E) Rp 393

Jenis Pekerjaan : Membuat Teakwood Rangkap, Rangka Expse Kayu kelas I


Satuan : 1 m2
Harga Satuan : Rp 540
Total Koefisien : 3.480 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.800 OH 100.00 80.00
2 Tukang Kayu 2.400 OH 100.00 240.00
3 Kepala Tukang 0.240 OH 100.00 24.00
4 Mandor 0.040 OH 100.00 4.00
Jumlah 3.480 OH Jumlah Rp348
B Bahan :
3 Kayu Papan Kelas I 0.025 m3 100.00 2.50
4 Paku 1 cm s/d 3 cm 0.030 kg 100.00 3.00
4 Lem Kayu 0.800 kg 20.00 16.00
4 Teakwood 4 mm 120x240 1.000 lbr 100.00 100.00

Jumlah Rp122
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 470
E Overhead + Profit 15 % Rp 70
F Harga Satuan Pekerjaan (D + E) Rp 540

Jenis Pekerjaan : Membuat Teakwood Rangkap Lapis Formika, Rngka Expose Kayu kelas II
Satuan : 1 m2
Harga Satuan : Rp 619
Total Koefisien : 3.668 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.850 OH 100.00 85.00
2 Tukang Kayu 2.550 OH 100.00 255.00
3 Kepala Tukang 0.225 OH 100.00 22.50
4 Mandor 0.043 OH 100.00 4.30

Jumlah 3.668 OH Jumlah Rp367


B Bahan :
3 Kayu Papan Kelas II 0.025 m3 100.00 2.50
4 Paku 1 cm s/d 3 cm 0.030 kg 100.00 3.00
4 Lem Kayu 0.800 kg 20.00 16.00
4 Teakwood 4 mm 120x240 1.000 lbr 100.00 100.00
Formika 120x240 0.500 lbr 100.00 50.00

Jumlah Rp172
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 538
E Overhead + Profit 15 % Rp 81
F Harga Satuan Pekerjaan (D + E) Rp 619

Jenis Pekerjaan : Memasang Konstruksi Kuda-kuda Konvensional, Kayu kelas I, II dan III batang s.d 6 meter
Satuan : 1 m3
Harga Satuan : Rp 2,001
Total Koefisien : 17.400 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 4.000 OH 100.00 400.00
2 Tukang Kayu 12.000 OH 100.00 1,200.00
3 Kepala Tukang 1.200 OH 100.00 120.00
4 Mandor 0.200 OH 100.00 20.00

Jumlah 17.400 OH Jumlah Rp1,740


B Bahan :
3 Kayu Balok Kelas II atau III m3 100.00 0.00
4 Plat Besi 2 mm s/d 5 mm kg 100.00 0.00
4 Paku 8 cm s/d 12 cm kg 100.00 0.00
4

Jumlah Rp0
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 1,740
E Overhead + Profit 15 % Rp 261
F Harga Satuan Pekerjaan (D + E) Rp 2,001

Jenis Pekerjaan : Memasang Konstruksi Kuda-kuda expose, Kayu kelas I


Satuan : 1 m3
Harga Satuan : Rp 5,859
Total Koefisien : 29.145 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 6.700 OH 100.00 670.00
2 Tukang Kayu 20.100 OH 100.00 2,010.00
3 Kepala Tukang 2.010 OH 100.00 201.00
4 Mandor 0.335 OH 100.00 33.50

Jumlah 29.145 OH Jumlah Rp2,915


B Bahan :
3 Kayu Balok Kelas I 1.200 m3 100.00 120.00
4 Plat Besi 2 mm s/d 5 mm 15.000 kg 100.00 1,500.00
4 Paku 8 cm s/d 12 cm 5.600 kg 100.00 560.00
4

Jumlah Rp2,180
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 5,095
E Overhead + Profit 15 % Rp 764
F Harga Satuan Pekerjaan (D + E) Rp 5,859

Jenis Pekerjaan : Memasang Konstruksi Gordeng, kayu kelas II


Satuan : 1 m3
Harga Satuan : Rp 3,397
Total Koefisien : 10.440 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 2.400 OH 100.00 240.00
2 Tukang Kayu 7.200 OH 100.00 720.00
3 Kepala Tukang 0.720 OH 100.00 72.00
4 Mandor 0.120 OH 100.00 12.00

Jumlah 10.440 OH Jumlah Rp1,044


B Bahan :
3 Kayu Balok Kelas I 1.100 m3 100.00 110.00
4 Plat Besi 2 mm s/d 5 mm 15.000 kg 100.00 1,500.00
4 Paku 8 cm s/d 12 cm 3.000 kg 100.00 300.00
4

Jumlah Rp1,910
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 2,954
E Overhead + Profit 15 % Rp 443
F Harga Satuan Pekerjaan (D + E) Rp 3,397

Jenis Pekerjaan : Memasang Rangka Atap Genteng Keramik, Kayu kelas II


Satuan : 1 m2
Harga Satuan : Rp 59
Total Koefisien : 0.215 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang Kayu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.215 OH Jumlah Rp22


B Bahan :
3 Kayu Kaso 4/6-5/7 0.014 m3 100.00 1.40
4 Kayu Reng 2/3 Kamper Banjar 0.036 m3 100.00 3.60
4 Paku 8 cm s/d 12 cm 0.250 kg 100.00 25.00
4

Jumlah Rp30
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 52
E Overhead + Profit 15 % Rp 8
F Harga Satuan Pekerjaan (D + E) Rp 59

Jenis Pekerjaan : Memasang Rangka Atap Genteng Beton, Kayu kelas II


Satuan : 1 m2
Harga Satuan : Rp 62
Total Koefisien : 0.215 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang Kayu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.215 OH Jumlah Rp22


B Bahan :
3 Kayu Kaso 4/6-5/7 0.014 m3 100.00 1.40
4 Kayu Reng 2/3 Kamper Banjar 0.057 m3 100.00 5.70
4 Paku 8 cm s/d 12 cm 0.250 kg 100.00 25.00
4

Jumlah Rp32
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 54
E Overhead + Profit 15 % Rp 8
F Harga Satuan Pekerjaan (D + E) Rp 62

Jenis Pekerjaan : Memasang Rangka Atap Sirap, Kayu kelas II


Satuan : 1 m2
Harga Satuan : Rp 72
Total Koefisien : 0.258 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.120 OH 100.00 12.00
2 Tukang Kayu 0.120 OH 100.00 12.00
3 Kepala Tukang 0.012 OH 100.00 1.20
4 Mandor 0.006 OH 100.00 0.60

Jumlah 0.258 OH Jumlah Rp26


B Bahan :
3 Kayu Kamper Singkil/Kapur (K. Samarinda Kla 0.165 m3 100.00 16.50
4 Paku 8 cm s/d 12 cm 0.200 kg 100.00 20.00
4
4

Jumlah Rp37
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 62
E Overhead + Profit 15 % Rp 9
F Harga Satuan Pekerjaan (D + E) Rp 72

Jenis Pekerjaan : Memasang Rangka Langit-langit (50x100) cm, Kayu kelas II atau III
Satuan : 1 m2
Harga Satuan : Rp 89
Total Koefisien : 0.555 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Tukang Kayu 0.300 OH 100.00 30.00
3 Kepala Tukang 0.030 OH 100.00 3.00
4 Mandor 0.075 OH 100.00 7.50

Jumlah 0.555 OH Jumlah Rp56


B Bahan :
3 Kayu Kaso 4/6-5/7 0.015 m3 100.00 1.54
4 Paku 8 cm s/d 12 cm 0.200 kg 100.00 20.00
4
4
Jumlah Rp22
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 77
E Overhead + Profit 15 % Rp 12
F Harga Satuan Pekerjaan (D + E) Rp 89

Jenis Pekerjaan : Memasang Rangka Langitlangit (60x60) cm, Kayu kelas II atau III
Satuan : 1 m2
Harga Satuan : Rp 93
Total Koefisien : 0.540 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.200 OH 100.00 20.00
2 Tukang Kayu 0.300 OH 100.00 30.00
3 Kepala Tukang 0.030 OH 100.00 3.00
4 Mandor 0.010 OH 100.00 1.00

Jumlah 0.540 OH Jumlah Rp54


B Bahan :
3 Kayu Kaso 4/6-5/7 0.016 m3 100.00 1.63
4 Paku 8 cm s/d 12 cm 0.250 kg 100.00 25.00
4
4

Jumlah Rp27
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 81
E Overhead + Profit 15 % Rp 12
F Harga Satuan Pekerjaan (D + E) Rp 93

Jenis Pekerjaan : Memasang Lisplank Ukuran (3x20) cm, Kayu kelas I atau II
Satuan : 1m
Harga Satuan : Rp 50
Total Koefisien : 0.325 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang Kayu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.325 OH Jumlah Rp33


B Bahan :
3 Kayu Papan Kelas II 0.011 m3 100.00 1.08
4 Paku 4 cm s/d 7 cm 0.100 kg 100.00 10.00
4
4

Jumlah Rp11
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 44
E Overhead + Profit 15 % Rp 7
F Harga Satuan Pekerjaan (D + E) Rp 50

Jenis Pekerjaan : Memasang Lisplank Ukuran (3x20) cm, Kayu kelas I atau II
Satuan : 1m
Harga Satuan : Rp 44
Total Koefisien : 0.325 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang Kayu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.325 OH Jumlah Rp33


B Bahan :
3 Kayu Papan Kelas II 0.011 m3 100.00 1.10
4 Paku 4 cm s/d 7 cm 0.050 kg 100.00 5.00
4
4

Jumlah Rp6
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 39
E Overhead + Profit 15 % Rp 6
F Harga Satuan Pekerjaan (D + E) Rp 44

Jenis Pekerjaan : Memasang Rangka Dinding Pemisah (60x120) cm, Kayu kelas II atau III
Satuan : 1 m2
Harga Satuan : Rp 96
Total Koefisien : 0.653 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Tukang Kayu 0.450 OH 100.00 45.00
3 Kepala Tukang 0.045 OH 100.00 4.50
4 Mandor 0.008 OH 100.00 0.80

Jumlah 0.653 OH Jumlah Rp65


B Bahan :
3 Kayu Balok Kelas II atau III 0.028 m3 100.00 2.80
4 Paku 4 cm s/d 7 cm 0.150 kg 100.00 15.00
4
4

Jumlah Rp18
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 83
E Overhead + Profit 15 % Rp 12
F Harga Satuan Pekerjaan (D + E) Rp 96

Jenis Pekerjaan : Memasang Dinding Pemisah Playwood Rangkap, Rangka Kayu kelas II
Satuan : 1 m2
Harga Satuan : Rp 207
Total Koefisien : 0.653 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.150 OH 100.00 15.00
2 Tukang Kayu 0.450 OH 100.00 45.00
3 Kepala Tukang 0.045 OH 100.00 4.50
4 Mandor 0.008 OH 100.00 0.80

Jumlah 0.653 OH Jumlah Rp65


B Bahan :
3 Kayu Balok Kelas II atau III 0.028 m3 100.00 2.80
4 Paku 4 cm s/d 7 cm 0.150 kg 100.00 15.00
4 Tripleks 4 mm ukuran pintu 0.860 lbr 100.00 86.00
4 Lem Kayu 0.560 kg 20.00 11.20

Jumlah Rp115
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 180
E Overhead + Profit 15 % Rp 27
F Harga Satuan Pekerjaan (D + E) Rp 207

Jenis Pekerjaan : Memasang Dinding Lambrisering dari Papan Kayu kelas I


Satuan : 1 m2
Harga Satuan : Rp 330
Total Koefisien : 2.610 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.600 OH 100.00 60.00
2 Tukang Kayu 1.800 OH 100.00 180.00
3 Kepala Tukang 0.180 OH 100.00 18.00
4 Mandor 0.030 OH 100.00 3.00

Jumlah 2.610 OH Jumlah Rp261


B Bahan :
3 Kayu Papan Kelas I 0.007 m3 100.00 0.70
4 Paku 8 cm s/d 12 cm 0.100 kg 100.00 10.00
4 Paku Skrup 0.150 kg 100.00 15.00

Jumlah Rp26
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 287
E Overhead + Profit 15 % Rp 43
F Harga Satuan Pekerjaan (D + E) Rp 330

Jenis Pekerjaan : Memasang Dinding Lambrisering dari Playwood (Kayu Lapis) Ukuran (120 x 240) cm
Satuan : 1 m2
Harga Satuan : Rp 64
Total Koefisien : 0.109 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Tukang Kayu 0.075 OH 100.00 7.50
3 Kepala Tukang 0.008 OH 100.00 0.80
4 Mandor 0.001 OH 100.00 0.10

Jumlah 0.109 OH Jumlah Rp11


B Bahan :
3 Tripleks 4 mm 120x240 0.400 lbr 100.00 40.00
4 Paku 1 cm s/d 3 cm 0.050 kg 100.00 5.00

Jumlah Rp45
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 56
E Overhead + Profit 15 % Rp 8
F Harga Satuan Pekerjaan (D + E) Rp 64

Jenis Pekerjaan : Memasang Dinding Bilik, Rangka Kayu kelas III atau IV
Satuan : 1 m2
Harga Satuan : Rp 194
Total Koefisien : 0.160 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.100 OH 100.00 10.00
2 Tukang Kayu 0.050 OH 100.00 5.00
3 Kepala Tukang 0.005 OH 100.00 0.50
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.160 OH Jumlah Rp16


B Bahan :
3 Bilik Bambu (tanpa kulit) 1.500 m2 100.00 150.00
4 Kayu Kaso 5/7 0.014 m3 100.00 1.40
Paku 4 cm s/d 7 cm 0.012 kg 100.00 1.20
Kayu Reng 2/3 Kamper Banjar 0.003 m3 100.00 0.30

Jumlah Rp153
C Peralatan :
1
Jumlah Rp0
D Jumlah A + B + C Rp 169
E Overhead + Profit 15 % Rp 25
F Harga Satuan Pekerjaan (D + E) Rp 194

J.1 PEKERJAAN KUNCI DAN KACA


Jenis Pekerjaan : Pemasangan Kunci Tanam Antik
Satuan : 1 bh
Harga Satuan : Rp 198
Total Koefisien : 0.723 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.060 OH 100.00 6.00
2 Tukang Kayu 0.600 OH 100.00 60.00
3 Kepala Tukang 0.060 OH 100.00 6.00
4 Mandor 0.003 OH 100.00 0.30

Jumlah 0.723 OH Jumlah Rp72


B Bahan :
3 Kunci Tanam Antik 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 172
E Overhead + Profit 15 % Rp 26
F Harga Satuan Pekerjaan (D + E) Rp 198

Jenis Pekerjaan : Pemasangan Kunci Tanam Biasa


Satuan : 1 bh
Harga Satuan : Rp 635
Total Koefisien : 0.525 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.010 OH 100.00 1.00
2 Tukang Kayu 0.500 OH 100.00 50.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.005 OH 100.00 0.50

Jumlah 0.525 OH Jumlah Rp53


B Bahan :
3 Kunci Tanam Biasa 1.000 bh 500.00 500.00
4

Jumlah Rp500
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 553
E Overhead + Profit 15 % Rp 83
F Harga Satuan Pekerjaan (D + E) Rp 635

Jenis Pekerjaan : Pemasangan Kunci Tanam Kamar Mandi


Satuan : 1 bh
Harga Satuan : Rp 174
Total Koefisien : 0.513 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.005 OH 100.00 0.50
2 Tukang Kayu 0.500 OH 100.00 50.00
3 Kepala Tukang 0.005 OH 100.00 0.50
4 Mandor 0.003 OH 100.00 0.25

Jumlah 0.513 OH Jumlah Rp51


B Bahan :
3 Kunci Kamar Mandi "Alpha" 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 151
E Overhead + Profit 15 % Rp 23
F Harga Satuan Pekerjaan (D + E) Rp 174

Jenis Pekerjaan : Pemasangan Kunci Silinder


Satuan : 1 bh
Harga Satuan : Rp 174
Total Koefisien : 0.510 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.005 OH 100.00 0.50
2 Tukang Kayu 0.500 OH 100.00 50.00
3 Kepala Tukang 0.005 OH 100.00 0.50
4 Mandor 0.000 OH 100.00 0.03

Jumlah 0.510 OH Jumlah Rp51


B Bahan :
3 Kunci Silinder ALFA untuk Pintu Aluminium 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 151
E Overhead + Profit 15 % Rp 23
F Harga Satuan Pekerjaan (D + E) Rp 174

Jenis Pekerjaan : Pemasangan Engsel Pintu


Satuan : 1 bh
Harga Satuan : Rp 136
Total Koefisien : 0.181 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.015 OH 100.00 1.50
2 Tukang Kayu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.001 OH 100.00 0.08

Jumlah 0.181 OH Jumlah Rp18


B Bahan :
3 Engsel Pintu Kuningan 4" 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 118
E Overhead + Profit 15 % Rp 18
F Harga Satuan Pekerjaan (D + E) Rp 136

Jenis Pekerjaan : Pemasangan Engsel Jendela Kupu-kupu


Satuan : 1 bh
Harga Satuan : Rp 129
Total Koefisien : 0.121 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.010 OH 100.00 1.00
2 Tukang Kayu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.001 OH 100.00 0.05

Jumlah 0.121 OH Jumlah Rp12


B Bahan :
3 Engsel Jendela 77 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 112
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 129

Jenis Pekerjaan : Pemasangan Engsel Angin


Satuan : 1 bh
Harga Satuan : Rp 201
Total Koefisien : 0.250 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.020 OH 100.00 2.00
2 Tukang Kayu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.010 OH 100.00 1.00

Jumlah 0.250 OH Jumlah Rp25


B Bahan :
3 Engsel Angin 1.000 bh 150.00 150.00
4

Jumlah Rp150
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 175
E Overhead + Profit 15 % Rp 26
F Harga Satuan Pekerjaan (D + E) Rp 201

Jenis Pekerjaan : Pemasangan Spring Knip untuk Jendela


Satuan : 1 bh
Harga Satuan : Rp 136
Total Koefisien : 0.181 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.015 OH 100.00 1.50
2 Tukang Kayu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.001 OH 100.00 0.08

Jumlah 0.181 OH Jumlah Rp18


B Bahan :
3 Spring Knip 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 118
E Overhead + Profit 15 % Rp 18
F Harga Satuan Pekerjaan (D + E) Rp 136
Jenis Pekerjaan : Memasang Kait Angin
Satuan : 1 bh
Harga Satuan : Rp 136
Total Koefisien : 0.181 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.015 OH 100.00 1.50
2 Tukang Kayu 0.150 OH 100.00 15.00
3 Kepala Tukang 0.015 OH 100.00 1.50
4 Mandor 0.001 OH 100.00 0.08

Jumlah 0.181 OH Jumlah Rp18


B Bahan :
3 Kait Angin Kuningan Ukuran 21 - 30 cm 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 118
E Overhead + Profit 15 % Rp 18
F Harga Satuan Pekerjaan (D + E) Rp 136

Jenis Pekerjaan : Memasang Doorcloser


Satuan : 1 bh
Harga Satuan : Rp 184
Total Koefisien : 0.603 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.050 OH 100.00 5.00
2 Tukang Kayu 0.500 OH 100.00 50.00
3 Kepala Tukang 0.050 OH 100.00 5.00
4 Mandor 0.003 OH 100.00 0.25

Jumlah 0.603 OH Jumlah Rp60


B Bahan :
3 Door Closer Klas Standard (Klas Baik) 1.000 unit 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 160
E Overhead + Profit 15 % Rp 24
F Harga Satuan Pekerjaan (D + E) Rp 184

Jenis Pekerjaan : Memasang Kunci Selot (Grendel) untuk Jendela


Satuan : 1 bh
Harga Satuan : Rp 143
Total Koefisien : 0.241 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.020 OH 100.00 2.00
2 Tukang Kayu 0.200 OH 100.00 20.00
3 Kepala Tukang 0.020 OH 100.00 2.00
4 Mandor 0.001 OH 100.00 0.10

Jumlah 0.241 OH Jumlah Rp24


B Bahan :
3 Grendel Ukuran 16 - 20 cm 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 124
E Overhead + Profit 15 % Rp 19
F Harga Satuan Pekerjaan (D + E) Rp 143

Jenis Pekerjaan : Memasang Doorholder


Satuan : 1 bh
Harga Satuan : Rp 198
Total Koefisien : 0.723 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.060 OH 100.00 6.00
2 Tukang Kayu 0.600 OH 100.00 60.00
3 Kepala Tukang 0.060 OH 100.00 6.00
4 Mandor 0.003 OH 100.00 0.30

Jumlah 0.723 OH Jumlah Rp72


B Bahan :
3 Door Holder 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 172
E Overhead + Profit 15 % Rp 26
F Harga Satuan Pekerjaan (D + E) Rp 198

Jenis Pekerjaan : Memasang Doorstoper


Satuan : 1 bh
Harga Satuan : Rp 129
Total Koefisien : 0.121 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.010 OH 100.00 1.00
2 Tukang Kayu 0.100 OH 100.00 10.00
3 Kepala Tukang 0.010 OH 100.00 1.00
4 Mandor 0.001 OH 100.00 0.05

Jumlah 0.121 OH Jumlah Rp12


B Bahan :
3 Door Stoper 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 112
E Overhead + Profit 15 % Rp 17
F Harga Satuan Pekerjaan (D + E) Rp 129

Jenis Pekerjaan : Memasang Rel Pintu Dorong


Satuan : 1 bh
Harga Satuan : Rp 150
Total Koefisien : 0.301 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Tukang Kayu 0.250 OH 100.00 25.00
3 Kepala Tukang 0.025 OH 100.00 2.50
4 Mandor 0.001 OH 100.00 0.13

Jumlah 0.301 OH Jumlah Rp30


B Bahan :
3 Rel Pintu Dorong 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 130
E Overhead + Profit 15 % Rp 20
F Harga Satuan Pekerjaan (D + E) Rp 150

Jenis Pekerjaan : Memasang Kunci Lemari


Satuan : 1 bh
Harga Satuan : Rp 150
Total Koefisien : 0.301 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Tukang Kayu 0.250 OH 100.00 25.00
3 Kepala Tukang 0.025 OH 100.00 2.50
4 Mandor 0.001 OH 100.00 0.13

Jumlah 0.301 OH Jumlah Rp30


B Bahan :
3 Kunci Lemari 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 130
E Overhead + Profit 15 % Rp 20
F Harga Satuan Pekerjaan (D + E) Rp 150

Jenis Pekerjaan :
Satuan :
Harga Satuan : Rp 150
Total Koefisien : 0.301 OH
Sumber : KEMEN.PUPR-CIPTA KARYA DAN PERUMAHAN
ID No. Uraian Koefisien Satuan Harga Satuan Jumlah harga
A Upah :
1 Pekerja 0.025 OH 100.00 2.50
2 Tukang Kayu 0.250 OH 100.00 25.00
3 Kepala Tukang 0.025 OH 100.00 2.50
4 Mandor 0.001 OH 100.00 0.13

Jumlah 0.301 OH Jumlah Rp30


B Bahan :
3 Kunci Lemari 1.000 bh 100.00 100.00
4

Jumlah Rp100
C Peralatan :
1

Jumlah Rp0
D Jumlah A + B + C Rp 130
E Overhead + Profit 15 % Rp 20
F Harga Satuan Pekerjaan (D + E) Rp 150
INDEX ANALISA HARGA SATUAN PEKERJAAN (INDX.AHSP)
1 2 3 4 5 Rp 6.00
Total Index
No. Jenis Pekerjaan Code Satuan Harga Total Pekerjaan
Pekerja (OH)
1 Pembuatan Direksikit N12 1 m2 3.35 Rp 109,079.80
2 Membuat Barak Pekerja dan Gudang N46 1 m2 3.25 Rp 1,175.30
3 Pembuatan Stager/ Perancah dari Bambu s.d Tinggi 6 m N76 1 m2 3.25 Rp 538.89
4 Pemasangan Bowplank N102 1 m1 0.215 Rp 27.83
5 Pemasagan Pagar BRC Lengkap Tanpa Pondasi N128 1 m2 1.1 Rp 241.50
6 Pemasanga Panel Beton Pracetak 50x50x240 Untuk Pagar N153 1 m2 0.531 Rp 101,253.03
7 Pembersihan Lahan Ringan N182 1 m2 0.075 Rp 8.63
8 Pengukuran (UILZET) N205 1 m2 0.075 Rp 9.40
9 Membongkar Beton N229 1 m3 7 Rp 805.00
10 Membongkar Dinding N252 1 m3 1.09 Rp 125.35
11 Membongkar Rangka Atap N275 1 m2 0.1325 Rp 15.24
12 Membongkar Atap Seng N300 1 m2 0.03 Rp 3.45
13 Pemasangan Lapisan Ijuk Tebal 10 cm untuk Bidang Resapan Tanki Septik N324 1 m2 0.165 Rp 708.98
14 Menggali Tanah Biasa Sedalam 1 meter N347 1 m3 0.775 Rp 89.13
15 Menggali Tanah Biasa Sedalam 2 meter N370 1 m3 0.945 Rp 108.68
16 Menggali Tanah Biasa Sedalam 3 meter N393 1 m3 1.117 Rp 128.46
17 Menggali Tanah Keras Sedalam 1 meter N416 1 m3 1.032 Rp 118.68
18 Menggali Tanah Cadas Sedalam 1 meter N439 1 m3 1.56 Rp 179.40
19 Menggali Tanah Lumpur Sedalam 1 meter N462 1 m3 1.245 Rp 143.18
20 Mengerjakan Stripping Tebing Setinggi 1 meter N485 1 m2 0.055 Rp 6.33
21 Membuang Tanah Sejauh 30 meter N508 1 m3 0.34 Rp 39.10
22 Memadatkan Tanah (per 20 cm) N531 1 m3 0.34 Rp 39.10
23 Mengurug Pasir Urug N554 1 m3 0.31 Rp 383,330.65
24 Mengurug Sirtu Padat Untuk Penginggian Lantai Bangunan N577 1 m3 0.31 Rp 448,535.65
25 Memasang Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL N600 1 m3 1.32 Rp 159,982.83
26 Memasang Batu Kosong (Aanstamping) untuk Pondasi Gedung N628 1 m3 1.248 Rp 814,329.72
27 Memasang Batu Belah, Campuran 1 PC : 3 PP N654 1 m3 2.4 Rp 870,584.71
28 Memasang Batu Belah, Campuran 1 PC : 4 PP N681 1 m3 2.4 Rp 884,469.32
29 Memasang Batu Belah, Campuran 1 PC : 5 PP N708 1 m3 2.4 Rp 893,989.61
30 Memasang Batu Belah, Campuran 1 PC : 6 PP N735 1 m3 2.4 Rp 900,733.44
31 Memasang Batu Belah, Campuran 1 PC : 8 PP N762 1 m3 2.4 Rp 909,856.76
32 Memasang Pondasi Batu Belah, Campuran 1 KP : 1 SM : 2 PP N789 1 m3 2.4 Rp 812,265.61
33 Memasang Pondasi Batu Belah, Campuran 1 PC : 3 KP : 10 PP N817 1 m3 2.4 Rp 873,072.18
34 Memasang Pondasi Batu Belah, Campuran 1/4 PC : 1 KP : 4 PP N845 1 m3 2.4 Rp 885,401.59
35 Memasang Pondasi Siklop, 60% Beton Campuran 1 PC : 2PB : 3 KR dan 40% Batu Belah N873 1 m3 4.505 Rp 636,756.33
36 Memasang Pondasi Sumuran, Diamter 100 cm N903 1 m3 3.399 Rp 605,027.14
37 Pembuatan Beton Mutu F'C = 7,4 Mpa (K100) N932 1 m3 2.036 Rp 635,032.47
38 Pembuatan Beton Mutu F'C = 9,8 Mpa (K125) N960 1 m3 2.036 Rp 628,112.86
39 Pembuatan Beton Mutu F'C = 12,2 Mpa (K150) N988 1 m3 2.036 Rp 621,705.43
40 Pembuatan Beton Mutu F'C = 14,5 Mpa (K175) N1019 1 m3 2.036 Rp 614,989.56
41 Pembuatan Beton Mutu F'C = 16,9 Mpa (K200) N1050 1 m3 2.036 Rp 607,502.92
42 Pembuatan Beton Mutu F'C = 19,3 Mpa (K225) N1078 1 m3 2.036 Rp 603,927.94
43 Pembuatan Beton Mutu F'C = 21,7 Mpa (K250) N1106 1 m3 2.036 Rp 599,350.40
44 Pembuatan Beton Mutu F'C = 24 Mpa (K275) N1134 1 m3 2.036 Rp 592,413.00
45 Pembuatan Beton Mutu F'C = 26,4 Mpa (K300) N1162 1 m3 2.036 Rp 589,763.34
46 Pembuatan Beton Mutu F'C = 28,8 Mpa (K325) N1190 1 m3 2.59 Rp 581,319.20
47 Pembuatan Beton Mutu F'C = 31,2 Mpa (K350) N1218 1 m3 2.59 Rp 578,312.11
48 Pembuatan Beton Kedap Air Dengan Aditif Kedap Air N1246 1 m3 2.59 Rp 608,153.63
49 Memasang PCV Waterstop Lebar 150 mm N1275 1 m1 0.116 Rp 134.09
50 Memasang PCV Waterstop Lebar 200 mm N1300 1 m1 0.116 Rp 134.09
51 Memasang PCV Waterstop Lebar 230 - 300 mm N1325 1 m1 0.116 Rp 134.09
52 Memasang Pembesian Dengan Besi Beton Polis atau Ulir N1350 1 kg 0.151 Rp 155.36
53 Memasang Kabel Presstressed Polos / Strands N1379 1 kg 0.108 Rp 134.89
54 Memasang Jaringan Anyam Tulangan Tunggal (Wiremesh) M6 - M8 N1408 1 kg 0.076 Rp 126.62
55 Memasang Bekisting untuk Pondasi Telapak Beton Bangunan Gedung N1437 1 m2 0.832 Rp 146.28
56 Pemasangan Bekisting untuk Sloof Bangunan Gedung N1464 1 m2 0.832 Rp 146.86
57 Pemasangan Bekisting untuk Kolom Bangunan Gedung N1491 1 m2 1.056 #N/A
58 Pemasangan Bekisting untuk Balok Bangunan Gedung N1521 1 m2 1.056 #N/A
59 Pemasangan Bekisting untuk Plat Lantai Beton Bangunan Gedung N1551 1 m2 1.056 #N/A
60 Memasang Bekisting untuk Dinding Sheerwall N1581 1 m2 1.056 Rp 627.44
61 Memasang Bekisting untuk Dinding Tangga Beton Bangunan Gedung N1612 1 m2 1.056 Rp 460.12
62 Memasang Bekisting Jembatan untuk Pengecoran Beton N1642 1 m2 0.213 Rp 154.03
63 Pembuatan Bekisting untuk Pelat Beton Pracetak Komponen Modular Bangunan (5x pakai N1670 1 m2 0.092 Rp 521.46
64 Pembuatan Bekisting untuk Balok Beton Pracetak (10-12 kali pakai) N1701 1 m2 0.047 Rp 93.76
65 #N/A #N/A #N/A #N/A #N/A
66 Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 2 PP)- 17, N1760 1 m2 0.85 Rp 48,239.10
67 Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 3 PP)-12,5 N1789 1 m2 0.85 Rp 52,606.76
68 Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 4 PP)-5,2 N1818 1 m2 0.85 Rp 53,390.57
69 Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 5 PP)-2,4 N1847 1 m2 0.85 Rp 56,973.96
70 Memasang Dinding Bata Merah (5x11x22) cm tebal 1 Bata - (Campuran 1 SP : 6 PP) N1876 1 m2 0.85 Rp 64,950.78
71 Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 2 PP)-17 N1905 1 m2 0.425 Rp 23,314.58
72 Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 3 PP)-12 N1934 1 m2 0.425 Rp 24,102.57
73 Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 4 PP)-5, N1963 1 m2 0.425 Rp 24,095.97
74 Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 5 PP)-2, N1992 1 m2 0.425 Rp 24,091.79
75 Memasang Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata - (Campuran 1 SP : 6 PP) N2021 1 m2 0.425 Rp 24,088.66
76 Memasang Dinding Conblok HB20 (Campuran 1 SP : 3 PP)-12,5 Mpa N2050 1 m2 0.533 Rp 292,266.52
77 Memasang Dinding Conblok HB20 (Campuran 1 SP : 4 PP)-5,2 Mpa N2079 1 m2 0.533 Rp 309,820.30
78 Memasang Dinding Conblok HB15 (Campuran 1 SP : 3 PP)-12,5 Mpa N2108 1 m2 0.448 Rp 221,169.93
79 Memasang Dinding Conblok HB15 (Campuran 1 SP : 4 PP)-5,2 Mpa N2137 1 m2 0.448 Rp 221,159.49
80 Memasang Dinding Conblok HB10 (Campuran 1 SP : 3 PP)-12,5 Mpa N2166 1 m2 0.425 Rp 146,886.34
81 Memasang Dinding Conblok HB10 (Campuran 1 SP : 4 PP)-5,2 Mpa N2195 1 m2 0.425 Rp 156,461.76
82 Memasang Dinding Terawang (rooster) 12x11x24 cm (1 PC : 3 PP)-12,5 Mpa N2224 1 m2 0.425 Rp 17,498.49
83 Memasang Dinding Terawang (rooster) 12x11x24 cm (1 PC : 4 PP)-5,2 Mpa N2252 1 m2 0.425 Rp 17,498.49
84 Memasang Dinding Bata Berongga Ekspose 12x11x24 (1 SP : 3 PP)-12,5 Mpa N2280 1 m2 0.48 Rp 20,913.92
85 Memasang Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai N2308 1 m2 0.816 Rp 1,157.94
86 Memasang Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai N2336 1 m2 0.817 Rp 1,156.75
87 Memasang Berapen (1 SP : 5 PP) t = 15 mm N2365 1 m2 0.241 Rp 10,420.56
88 Memasang Plasteran (1 SP : 1 PP) t = 15 mm N2393 1 m2 0.48 Rp 6,479.12
89 Memasang Plasteran (1 SP : 2 PP) t = 15 mm N2421 1 m2 0.48 Rp 8,064.04
90 Memasang Plasteran (1 SP : 3 PP) t = 15 mm N2449 1 m2 0.48 Rp 8,058.42
91 Memasang Plasteran (1 SP : 4 PP) t = 15 mm N2477 1 m2 0.48 Rp 8,054.88
92 Memasang Plasteran (1 SP : 5 PP) t = 15 mm N2505 1 m2 0.48 Rp 8,052.44
93 Memasang Plasteran (1 SP : 1/2 KP : 3 PP) t = 15 mm N2533 1 m2 0.48 Rp 5,259.25
94 Memasang Plesteran Skoning (1 SP : 3 PP) L = 10 cm N2561 1 m2 0.56 Rp 5,256.01
95 Memasang Plesteran Granit (1 SP : 2 PP) t = 10 cm N2589 1 m2 0.721 Rp 1,830.92
96 Memasang Plesteran Traso (1 SP : 2 PP) t = 10 cm N2617 1 m2 0.721 Rp 1,830.92
97 Memasang Plesteran Ciprat (Kamprotan) (1 SP : 2 SP) N2645 1 m2 0.425 Rp 2,454.41
98 Memasang Finishing Dinding Siar Pasang Bata Merah N2673 1 m2 0.241 Rp 35.03
99 Memasang Finishing Dinding Siar Conblok Ekspose N2701 1 m2 0.113 Rp 16.68
100 Memasang Finishing Dinding Siar Pasang Batu Kali (1 SP : 2 PP) N2729 1 m2 0.48 Rp 4,860.98
101 Memasang Lantai Ubin PC Abu-abu (Ukuran 20 - 40 cm2) N2758 1 m2 0.401 Rp 18,279.43
102 Memasang Lantai Ubin Warna (ukuran 30 - 40 cm2) N2786 1 m2 0.416 Rp 18,350.62
103 Memasang Lantai Ubin Teraso (Ukuran 30 - 40 cm2) N2814 1 m2 0.401 Rp 18,428.93
104 Memasang Lantai Ubin Granit (30 cm - 40 cm) N2842 1 m2 0.401 Rp 18,307.03
105 Memasang Lantai Ubin Teralux N2870 1 m2 0.416 Rp 18,332.45
106 Memasang Lantai Plint Ubin Abu-abu 30 s.d 40 cm N2898 1m 0.194 Rp 1,303.46
107 Memasang Lantai Keramik Ukuran 30 s.d 40 cm N2926 1 m2 1.12 Rp 18,291.28
108 #N/A #N/A #N/A #N/A #N/A
109 Membuat dan Memasang Kusen Pintu dan Jendela, Kayu Kelas I N2984 1 m3 30.45 Rp 3,783.50
110 Membuat dan Memasang Kusen Pintu dan Jendela, Kayu Kelas II atau III N3012 1 m3 26.1 Rp 3,294.75
111 Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas II N3040 1 m2 1.523 Rp 185.50
112 Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas III N3068 1 m2 1.523 Rp 185.50
113 Membuat dan Memasang Daun Pintu Panel, Kayu Kelas I atau II N3096 1 m2 1.523 Rp 180.90
114 Membuat dan Memasang Pintu dan Jendela Kaca, Kayu Kelas I atau II N3124 1 m2 3.48 Rp 409.86
115 Membuat Daun Pintu Kayu Lapis (playwood) rangkap, rangka tertutup kayu kelas II (L s.d N3152 1 m2 3.045 Rp 483.00
116 Membuat Daun Pintu Kayu Lapis (playwood) Rangkap, Rangka Ekspose Kayu kelas I atau N3180 1 m2 3.48 Rp 533.09
117 Membuat dan Memasang Jalusi Kusen, Kayu kelas I atau II N3208 1 m2 3.205 Rp 392.73
118 Membuat Teakwood Rangkap, Rangka Expse Kayu kelas I N3234 1 m2 3.48 Rp 539.93
119 Membuat Teakwood Rangkap Lapis Formika, Rngka Expose Kayu kelas II N3264 1 m2 3.668 Rp 619.05
120 Memasang Konstruksi Kuda-kuda Konvensional, Kayu kelas I, II dan III batang s.d 6 meter N3294 1 m3 17.4 Rp 2,001.00
121 Memasang Konstruksi Kuda-kuda expose, Kayu kelas I N3324 1 m3 29.145 Rp 5,858.68
122 Memasang Konstruksi Gordeng, kayu kelas II N3354 1 m3 10.44 Rp 3,397.10
123 Memasang Rangka Atap Genteng Keramik, Kayu kelas II N3384 1 m2 0.215 Rp 59.23
124 Memasang Rangka Atap Genteng Beton, Kayu kelas II N3414 1 m2 0.215 Rp 61.64
125 Memasang Rangka Atap Sirap, Kayu kelas II N3444 1 m2 0.258 Rp 71.65
126 Memasang Rangka Langit-langit (50x100) cm, Kayu kelas II atau III N3474 1 m2 0.555 Rp 88.60
127 Memasang Rangka Langitlangit (60x60) cm, Kayu kelas II atau III N3504 1 m2 0.54 Rp 92.72
128 Memasang Lisplank Ukuran (3x20) cm, Kayu kelas I atau II N3534 1m 0.325 Rp 50.12
129 Memasang Lisplank Ukuran (3x20) cm, Kayu kelas I atau II N3564 1m 0.325 Rp 44.39
130 Memasang Rangka Dinding Pemisah (60x120) cm, Kayu kelas II atau III N3594 1 m2 0.653 Rp 95.57
131 Memasang Dinding Pemisah Playwood Rangkap, Rangka Kayu kelas II N3624 1 m2 0.653 Rp 207.35
132 Memasang Dinding Lambrisering dari Papan Kayu kelas I N3654 1 m2 2.61 Rp 329.71
133 Memasang Dinding Lambrisering dari Playwood (Kayu Lapis) Ukuran (120 x 240) cm N3684 1 m2 0.109 Rp 64.29
134 Memasang Dinding Bilik, Rangka Kayu kelas III atau IV N3714 1 m2 0.16 Rp 194.24
135 Pemasangan Kunci Tanam Antik N3745 1 bh 0.723 Rp 198.15
136 Pemasangan Kunci Tanam Biasa N3775 1 bh 0.525 Rp 635.38
137 Pemasangan Kunci Tanam Kamar Mandi N3805 1 bh 0.5125 Rp 173.94
138 Pemasangan Kunci Silinder N3835 1 bh 0.51025 Rp 173.68
139 Pemasangan Engsel Pintu N3865 1 bh 0.18075 Rp 135.79
140 Pemasangan Engsel Jendela Kupu-kupu N3895 1 bh 0.1205 Rp 128.86
141 Pemasangan Engsel Angin N3925 1 bh 0.25 Rp 201.25
142 Pemasangan Spring Knip untuk Jendela N3955 1 bh 0.18075 Rp 135.79
143 Memasang Kait Angin N3985 1 bh 0.18075 Rp 135.79
144 Memasang Doorcloser N4015 1 bh 0.6025 Rp 184.29
145 Memasang Kunci Selot (Grendel) untuk Jendela N4045 1 bh 0.241 Rp 142.72
146 Memasang Doorholder N4075 1 bh 0.723 Rp 198.15
147 Memasang Doorstoper N4105 1 bh 0.1205 Rp 128.86
148 Memasang Rel Pintu Dorong N4135 1 bh 0.30125 Rp 149.64
149 Memasang Kunci Lemari N4135 1 bh 0.30125 Rp 149.64
150 #N/A #N/A #N/A #N/A #N/A
151 #N/A #N/A #N/A #N/A #N/A
152 #N/A #N/A #N/A #N/A #N/A
153 #N/A #N/A #N/A #N/A #N/A
154 #N/A #N/A #N/A #N/A #N/A
155 #N/A #N/A #N/A #N/A #N/A
156 #N/A #N/A #N/A #N/A #N/A
157 #N/A #N/A #N/A #N/A #N/A
158 #N/A #N/A #N/A #N/A #N/A
VOLUME PEKERJAAN

Nama Proyek :A
Lokasi Proyek :B
Nilai Proyek :C

TINGGI /
JUMLAH
No. ITEM PEKERJAAN VOLUME SATUAN KETERANGAN PANJANG LEBAR DALAM/B JUMLAH TOTAL
TOTAL
ERAT

1 POJECT MILESTONE
A PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pembersihan Lahan/Lapangan 220 M2 11 20 1 220 220
2 Pemasangan Bowplank 37 M1 18.5 2 37 37
3 Penyediaan Air Kerja 1 LS sepanjang pekerjaan 1 1 1
4 Administrasi dan Dokumentasi 1 LS 1 1 1

Sub Total
B PEKERJAAN PENDAHULUAN
B.I Galian Tanah dan Urugan
1.1 Galian Tanah Pondasi 25.0425 M3 55.65 0.5 0.9 25.0425 25.043

B.II Urugan Pasir Sirtu Padat


2.1 Urugan Pasir Lean Concrete Pondasi 2.50425 M3 55.65 0.05 0.9 2.50425 2.504

B.III Urugan Tanah


3.1 Urgan Tanah Setelah Pekerjaan Konstruksi 6.260625 M3 0.25 25.0425 6.260625 6.261

B.IV Urugan Pasir Timbunan Dibawah Lantai


4.1 Urugan Pasir Tipe I 9.06 M3 0.2 45.3 9.06 9.060
4.2 Urugan Pasir Tipe II 0.945 M3 0.1 9.45 0.945 0.945

C.I Pekerjaan Pondasi Dangkal


C.I.1 Pekerjaan Pasang dan Plasteran
1.1 Pekerjaan Batu Kosong / Aanstamping 5.0085 M3 55.65 0.9 0.1 5.0085 5.009

C.I.2 Pasang Pondasi Batu Karang


2.1 Pondasi Batu Karang Tipe I 13.53 M3 45.1 1 0.3 13.53 13.530
2.2 Pondasi Batu Karang Tipe II 2.927625 M3 10.55 0.925 0.3 2.927625 2.928

Sub Total
D PEKERJAAN STRUKTUR ATAS
D.I Pekerjaan Sloof
D.I.1 Pekerjaan Sloof Dim. ( 15 x 20) Sloof Utama
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 111.223376 Kg Tul.Utama 45.1 0.617 4 111.223376 111.223
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 59.5164256 Kg Tul Sengkang 0.50 0.395 302 59.5164256 59.516
1.3 Pembuatan Bekisting Sloof 22.55 M2 45.1 0.25 2 22.55 22.55
1.4 Pekerjaan Beton Mutu K-225 2.706 M3 45.1 0.15 0.2 2 2.706 2.706

D.I.2 Pekerjaan Sloof Dim. ( 10 x 22) Sloof Pengubung


2.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 26.017885 Kg Tul.Utama 10.55 0.617 4 26.017885 26.0179
2.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 11.2587979 Kg Tul Sengkang 0.40 0.395 71 11.2587979 11.259
2.3 Pembuatan Bekisting Sloof 5.275 M2 10.55 0.25 2 5.275 5.275
2.4 Pekerjaan Beton Mutu K-225 0.2321 M3 10.55 0.1 0.22 1 0.2321 0.2321

Sub Total
D.II Pekerjaan Kolom
D.II.1 Pekerjaan Kolom untuk Dim. ( 20 x 20) Kolom Utama
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 194.628576 Kg Tul.Utama 78.92 0.617 4 194.628576 194.629
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 124.799039 Kg Tul Sengkang 0.60 0.395 527 124.799039 124.799
1.3 Pembuatan Bekisting Kolom 63.136 M2 78.92 0.2 4 63.136 63.136
1.4 Pekerjaan Beton Mutu K-225 3.1568 M3 78.92 0.2 0.2 1 3.1568 3.1568

D.II.2 Pekerjaan Kolom untuk Dim. ( 15 x 15) Kolom Praktis


2.1 Fabrikasi Tulangan Utama (Dia. 8 mm) 124.562289 Kg Tul.Utama 78.92 0.395 4 124.562289 124.562
2.2 Fabrikasi Tulangan Sengkang (Dia. 6 mm) 70.1994596 Kg Tul Sengkang 0.60 0.222 527 70.1994596 70.199
2.3 Pembuatan Bekisting Kolom 63.136 M2 78.92 0.2 4 63.136 63.136
2.4 Pekerjaan Beton Mutu K-225 3.1568 M3 78.92 0.2 0.2 1 3.1568 3.1568

D.II.3 Pekerjaan Kolom untuk Dim. ( 10 x 15) Kolom Praktis Jendela


3.1 Fabrikasi Tulangan Utama (Dia. 8 mm) 26.5160473 Kg Tul.Utama 16.8 0.395 4 26.5160473 26.516
3.2 Fabrikasi Tulangan Sengkang (Dia. 6 mm) 15.0484487 Kg Tul Sengkang 0.60 0.222 113 15.0484487 15.048
3.3 Pembuatan Bekisting Kolom 13.44 M2 16.8 0.2 4 13.44 13.44
3.4 Pekerjaan Beton Mutu K-225 3.1568 M3 78.92 0.2 0.2 1 3.1568 3.1568

Sub Total
D.III Pekerjaan Balok
D.III.1 Pekerjaan Balok Dim. ( 20 x 15) Kolom Praktis Jendela
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 94.704 Kg Tul.Utama 78.92 0.2 6 94.704 94.704
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 42.171 Kg Tul Sengkang 0.4 0.2 527 42.171 42.171
1.3 Pembuatan Bekisting Sloof 59.190 M2 118.38 0.25 2 59.19 59.19
1.4 Pekerjaan Beton Mutu K-225 2.368 M3 78.92 0.15 0.2 1 2.368 2.368

Sub Total
E Pekerjaan Dinding
E.I.1 Pekerjaan Dinding I
1.1
1.2
1.3
1.4
Tanggal Keterangan Hari Libur
1-Jan-22 Tahun Baru Masehi
16-Feb-22 Tahun Baru Imlek
17-Mar-22 Hari Raya Nyepi
30-Mar-22 Jumat Agung
14-Apr-22 Isra' Mi'raj
1-May-22 Hari Buruh
10-May-22 Kenaikan Isa Almasih
29-May-22 Hari Waisak
1-Jun-22 Hari Kesaktian Pancasila
11-Jun-22 Cuti Bersama Lebaran
12-Jun-22 Cuti Bersama Lebaran
13-Jun-22 Cuti Bersama Lebaran
14-Jun-22 Cuti Bersama Lebaran
15-Jun-22 Hari Raya Idul Fitri
16-Jun-22 Hari Raya Idul Fitri
17-Jun-22 Cuti Bersama Lebaran
1-Aug-22 Cuti Bersama Lebaran
19-Jun-22 Cuti Bersama Lebaran
20-Jun-22 Cuti Bersama Lebaran
17-Aug-22 Hari Kemerdekaan
22-Aug-22 Idul Adha
11-Sep-22 Tahun Baru Islam
20-Nov-22 Maulid Nabi Muhammad S.A.W
24-Dec-22 Cuti Bersama Hari Natal
25-Dec-22 Hari Natal
1-Jan-23 Tahun Baru Masehi
5-Feb-23 Tahun Baru Imlek
7-Mar-23 Hari Raya Nyepi
3-Apr-23
19-Apr-23
1-May-23
19-May-23
30-May-23
1-Jun-23
2-Jun-23
3-Jun-23
4-Jun-23
5-Jun-23
6-Jun-23
7-Jun-23
8-Jun-23
9-Jun-23
10-Jun-23
17-Aug-23
ANALISA TENAGA KERJA (OH)

Nama Proyek :A
Lokasi Proyek :B
Nilai Proyek :C

No. ITEM PEKERJAAN VOLUME SATUAN DURASI Harga Satuan Jumlah Harga

1 2 3 4 5 6 7
1 POJECT MILESTONE
A PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pembersihan Lahan/Lapangan 220.00 M2 1 Rp 8.625 Rp 1,897.50
2 Pemasangan Bowplank 37.00 M1 1 Rp 27.830 Rp 1,029.71
3 Penyediaan Air Kerja 1.00 LS 1
4 Administrasi dan Dokumentasi 1.00 LS 1

Sub Total Jumlah


B PEKERJAAN PENDAHULUAN
B.I Galian Tanah dan Urugan
1.1 Galian Tanah Pondasi 25.04 M3 2 Rp 108.675 Rp 2,721.49

Sub Total Jumlah


B.II Urugan Pasir Sirtu Padat
2.1 Urugan Pasir Lean Concrete Pondasi 2.50 M3 2 Rp 383,330.650
0
Sub Total Jumlah
B.III Urugan Tanah
3.1 Urgan Tanah Setelah Pekerjaan Konstruksi 6.26 M3 2 Rp 39.100

Sub Total Jumlah


B.IV Urugan Pasir Timbunan Dibawah Lantai
4.1 Urugan Pasir Tipe I 9.06 M3 2 Rp 383,330.650
4.2 Urugan Pasir Tipe II 0.95 M3 2 Rp 383,330.650

Sub Total Jumlah


C.I Pekerjaan Pondasi Dangkal
C.I.1 Pekerjaan Pasang dan Plasteran
1.1 Pekerjaan Batu Kosong / Aanstamping 5.01 M3 1 Rp 814,329.720

Sub Total Jumlah


C.I.2 Pasang Pondasi Batu Karang
2.1 Pondasi Batu Karang Tipe I 13.53 M3 Rp 870,584.707
2.2 Pondasi Batu Karang Tipe II 2.93 M3 Rp 870,584.707
0
Sub Total Jumlah
D PEKERJAAN STRUKTUR ATAS
D.I Pekerjaan Sloof
D.I.1 Pekerjaan Sloof Dim. ( 15 x 20)
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 111.22 Kg Rp 155.365
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 59.52 Kg Rp 155.365
1.3 Pembuatan Bekisting Sloof 22.55 M2 Rp 146.855
1.4 Pekerjaan Beton Mutu K-225 2.71 M3 Rp 603,927.937
0
Sub Total Jumlah
D.I.2 Pekerjaan Sloof Dim. ( 10 x 22)
2.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 26.02 Kg Rp 155.365
2.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 11.26 Kg Rp 155.365
2.3 Pembuatan Bekisting Sloof 5.28 M2 Rp 146.855
2.4 Pekerjaan Beton Mutu K-225 0.23 M3 Rp 603,927.937
0
Sub Total Jumlah
D.II Pekerjaan Kolom
D.II.1 Pekerjaan Kolom untuk Dim. ( 20 x 20)
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 194.63 Kg Rp 383,330.650
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 124.80 Kg Rp 383,330.650
1.3 Pembuatan Bekisting Kolom 63.14 M2 Rp 383,330.650
1.4 Pekerjaan Beton Mutu K-225 3.16 M3 Rp 383,330.650
0
Sub Total Jumlah
D.II.2 Pekerjaan Kolom untuk Dim. ( 15 x 15)
2.1 Fabrikasi Tulangan Utama (Dia. 8 mm) 124.56 Kg Rp 383,330.650
2.2 Fabrikasi Tulangan Sengkang (Dia. 6 mm) 70.20 Kg Rp 383,330.650
2.3 Pembuatan Bekisting Kolom 63.14 M2 Rp 383,330.650
2.4 Pekerjaan Beton Mutu K-225 3.16 M3 Rp 383,330.650
0
Sub Total Jumlah
D.II.3 Pekerjaan Kolom untuk Dim. ( 10 x 15)
3.1 Fabrikasi Tulangan Utama (Dia. 8 mm) 26.52 Kg Rp 383,330.650
3.2 Fabrikasi Tulangan Sengkang (Dia. 6 mm) 15.05 Kg Rp 383,330.650
3.3 Pembuatan Bekisting Kolom 13.44 M2 Rp 383,330.650
3.4 Pekerjaan Beton Mutu K-225 3.16 M3 Rp 383,330.650
0
Sub Total Jumlah
D.III Pekerjaan Balok
D.III.1 Pekerjaan Balok Dim. ( 20 x 15)
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 94.70 Kg Rp 383,330.650
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 42.17 Kg Rp 383,330.650
1.3 Pembuatan Bekisting Sloof 59.19 M2 Rp 383,330.650
1.4 Pekerjaan Beton Mutu K-225 2.37 M3 Rp 383,330.650
0
Sub Total Jumlah
E Pekerjaan Dinding
E.I.1 Pekerjaan Dinding I
1.1 0 Rp 383,330.650
1.2 0 Rp 383,330.650
1.3 0 Rp 383,330.650
1.4 0 Rp 383,330.650
Sub Total Jumlah
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
Sub Total
Jumlah Total
PPN 11%
Jumlah + PPN
Dibulatkan
ANALISA TENAGA KERJA (OH)

Nama Proyek :A
Lokasi Proyek :B
Nilai Proyek :C

ANALISA KEBUTUHAN TENAGA KERJA (OH)


No. ITEM PEKERJAAN VOLUME SATUAN DURASI VOLUME PEKERJA
INDEX PEKERJA
Total Per Hari
1 2 3 4 5 6 7= 3 x 6 8=7/5
1 POJECT MILESTONE
A PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pembersihan Lahan/Lapangan 220.00 M2 1 0.075 16.500 16.500
2 Pemasangan Bowplank 37.00 M1 1 0.215 7.955 7.955
3 Penyediaan Air Kerja 1.00 LS 1 1.000 1.000 1.000
4 Administrasi dan Dokumentasi 1.00 LS 4 1.000 1.000 0.250

B PEKERJAAN PENDAHULUAN
B.I Galian Tanah dan Urugan
1.1 Galian Tanah Pondasi 25.04 M3 2 0.945 23.665 11.833

B.II Urugan Pasir Sirtu Padat


2.1 Urugan Pasir Lean Concrete Pondasi 2.50 M3 2 0.310 0.776 0.388
0
B.III Urugan Tanah
3.1 Urgan Tanah Setelah Pekerjaan Konstruksi 6.26 M3 2 0.340 2.129 1.064

B.IV Urugan Pasir Timbunan Dibawah Lantai


4.1 Urugan Pasir Tipe I 9.06 M3 2 0.310 2.809 1.404
4.2 Urugan Pasir Tipe II 0.95 M3 2 0.310 0.293 0.146

C.I Pekerjaan Pondasi Dangkal


C.I.1 Pekerjaan Pasang dan Plasteran
1.1 Pekerjaan Batu Kosong / Aanstamping 5.01 M3 1 1.248 6.251 6.251

C.I.2 Pasang Pondasi Batu Karang


2.1 Pondasi Batu Karang Tipe I 13.53 M3 2.400 32.472
2.2 Pondasi Batu Karang Tipe II 2.93 M3 2.400 7.026
0
0 Sub Total
D PEKERJAAN STRUKTUR ATAS
D.I Pekerjaan Sloof
D.I.1 Pekerjaan Sloof Dim. ( 15 x 20)
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 111.22 Kg 0.151 16.795
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 59.52 Kg 0.151 8.987
1.3 Pembuatan Bekisting Sloof 22.55 M2 0.832 18.762
1.4 Pekerjaan Beton Mutu K-225 2.71 M3 2.036 5.509
0
D.I.2 Pekerjaan Sloof Dim. ( 10 x 22)
2.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 26.02 Kg 0.151 3.929
2.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 11.26 Kg 0.151 1.700
2.3 Pembuatan Bekisting Sloof 5.28 M2 0.832 4.389
2.4 Pekerjaan Beton Mutu K-225 0.23 M3 2.036 0.473
0
0 Sub Total
D.II Pekerjaan Kolom
D.II.1 Pekerjaan Kolom untuk Dim. ( 20 x 20)
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 194.63 Kg 0.310 60.335
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 124.80 Kg 0.310 38.688
1.3 Pembuatan Bekisting Kolom 63.14 M2 0.310 19.572
1.4 Pekerjaan Beton Mutu K-225 3.16 M3 0.310 0.979
0
D.II.2 Pekerjaan Kolom untuk Dim. ( 15 x 15)
2.1 Fabrikasi Tulangan Utama (Dia. 8 mm) 124.56 Kg 0.310 38.614
2.2 Fabrikasi Tulangan Sengkang (Dia. 6 mm) 70.20 Kg 0.310 21.762
2.3 Pembuatan Bekisting Kolom 63.14 M2 0.310 19.572
2.4 Pekerjaan Beton Mutu K-225 3.16 M3 0.310 0.979
0
D.II.3 Pekerjaan Kolom untuk Dim. ( 10 x 15)
3.1 Fabrikasi Tulangan Utama (Dia. 8 mm) 26.52 Kg 0.310 8.220
3.2 Fabrikasi Tulangan Sengkang (Dia. 6 mm) 15.05 Kg 0.310 4.665
3.3 Pembuatan Bekisting Kolom 13.44 M2 0.310 4.166
3.4 Pekerjaan Beton Mutu K-225 3.16 M3 0.310 0.979
0
0 Sub Total
D.III Pekerjaan Balok
D.III.1 Pekerjaan Balok Dim. ( 20 x 15)
1.1 Fabrikasi Tulangan Utama (Dia. 10 mm) 94.70 Kg 0.310 29.358
1.2 Fabrikasi Tulangan Sengkang (Dia. 8 mm) 42.17 Kg 0.310 13.073
1.3 Pembuatan Bekisting Sloof 59.19 M2 0.310 18.349
1.4 Pekerjaan Beton Mutu K-225 2.37 M3 0.310 0.734
0
0 Sub Total
E Pekerjaan Dinding
E.I.1 Pekerjaan Dinding I
1.1 0 0.310 #VALUE!
1.2 0
1.3 0
1.4 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
0 0 0.00 0
Month

START END PRODECESSOR JEDA HARI


0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0
25/07/22 26/07/22 27/07/22 28/07/22 29/07/22 30/07/22 31/07/22 01/08/22 02/08/22 03/08/22 04/08/22 05/08/22 06/08/22 07/08/22 08/08/22 09/08/22
25-Jul-22 31-Jul-22

25/07/22 25/07/22 16.50


26/07/22 26/07/22 2 0 7.96
27/07/22 27/07/22 3 0 1.00
28/07/22 31/07/22 4 0 0.25 0.25 0.25 0.25

27/07/22 28/07/22 3 0 11.83 11.83

26/07/22 27/07/22 2 0 0.39 0.39

26/07/22 27/07/22 2 0 1.06 1.06

26/07/22 27/07/22 2 0 1.40 1.40


26/07/22 27/07/22 2 0 0.15 0.15

26/07/22 26/07/22 2 0 6.25

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0
26/07/22 26/07/22 2 0

26/07/22 26/07/22 2 0
0 0
10/08/22 11/08/22
0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0
12/08/22 13/08/22 14/08/22 15/08/22 16/08/22 17/08/22 18/08/22 19/08/22 20/08/22 21/08/22 22/08/22 23/08/22 24/08/22 25/08/22 26/08/22 27/08/22 28/08/22 29/08/22 30/08/22 31/08/22 01/09/22 02/09/22
0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03/09/22 04/09/22 05/09/22 06/09/22 07/09/22 08/09/22 09/09/22 10/09/22 11/09/22 12/09/22 13/09/22 14/09/22 15/09/22 16/09/22 17/09/22 18/09/22 19/09/22 20/09/22 21/09/22 22/09/22 23/09/22 24/09/22 25/09/22 26/09/22 27/09/22 28/09/22 29/09/22 30/09/22
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01/10/22 02/10/22 03/10/22 04/10/22 05/10/22 06/10/22 07/10/22 08/10/22 09/10/22 10/10/22 11/10/22 12/10/22 13/10/22 14/10/22 15/10/22 16/10/22 17/10/22