Report Activity NISSIN Work (November 23)
Report Activity NISSIN Work (November 23)
ManPower :
POC : 2 person
PT.Legno Tropicalindo
Staff : 2 Person
Worker : 3 Person
Activity :
Install Scaffolding
install temporary protection
Repair Ceiling Existing
Repair Wall Existing
Equipment : Weather : 23 24
1 2
22 3
- Gerinda Cutting 20
21 4
5
- Exhaust Blower 19
18
6
7
17 8
16 9
15 10
14 13 12 11
Sunny : Yellow
Cloudy : Green
Rainy : Orange
Stormy : Red
ACTIVITY WORK
ManPower :
POC : 2 person
PT.Legno Tropicalindo
Staff : 2 Person
Worker : 3 Person
Activity :
Dismantle Logo Existing
Demolish FloorExisting
Demolish Ceiling cantilever
Finishing Plastering Stair
Equipment : Weather : 23 24
1 2
22 3
- Gerinda Cutting 20
21 4
5
- Exhaust Blower 19
18
6
7
17 8
16 9
15 10
14 13 12 11
Sunny : Yellow
Cloudy : Green
Rainy : Orange
Stormy : Red