24 April 2012
This is not an ADB material. The views expressed in this document are the views of the author/s and/or their organizations and do not necessarily reflect the views
or policies of the Asian Development Bank, or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy and/or
completeness of the material’s contents, and accepts no responsibility for any direct or indirect consequence of their use or reliance, whether wholly or partially.
Please feel free to contact the authors directly should you have queries.
Flood in Pasig-Marikina-Laguna Lake Basin by “Ondoy”
(Unit: m3/s)
Marikina River water level rapidly rose 4.6 m in 6 hours at
Marikina Bridge on September 26, 2009 due to
approximately 400 mm rainfall in 6 hours. Sierra Madre Mountains
Also, Laguna Lake water level rose from Elev. 12.90 m at 5,000
9:00 AM on September 26, 2009 to Elev. 13.84 m in 24
hours.
4,150
3,500
500
1,200 3,000
Inflow:
7,000m3/s
Overall Pasig-Marikina River Channel Improvement Project
Phase I - Detailed Design for the entire project (Delpan
Bridge to Marikina Bridge) (Completed)
Marikina River
Napindan River
Non-Structural Componentsion
Implementation of Information Campaign and Publicity (ICP) Activities:
Marikina River
Pasig River
M8 Marikina Br.
M7 Marcos Br.
M7 Marcos Br.
A
GS . 2-
AG CT
MC E No
CK RA
Km . 3
AG CT
PA CONT
6.1 E No
M6 MRT Br.
CK RA
.
M5 Manalo Br.
PA ONT
M.C.G.S.
M4 Rosario Br.
1. Construction Phase 1
-B
M2 Vargas Br.2
1.2 Upper Pasig River Improvement
6.0 KAGE
5m Approx. 140m
5m 3m Approx. 100m 3 5m
pe Br. Grass Sodding
AC
Concrete Ditch
1.2m
H.W.L.
R
Approx.
3. Construction Phase 3
• To be implemented at a
Old CL
10m
5 Br.
NT
Revetment
Existing Ground Level
Coping Concrete
Design Riverbed Level
3.1 Marikina River Improvement
CO
4m separate funding
Contract Packagerequest
- Dredging/Excavation of Riverbed
Pavement
Concrete Block Revetment Wall
Concrete Ditch Concrete Ditch
Pavement
(Freeboard)
Existing Riverbed
1.2m
H.W.L.
- Earth Dike
Existing Facilities Removal
Embankment Dredging/Excavation
Design Riverbed Level