STOP
Revision # 0
Issue Date [idate]
Next Revision Date TBD
PV-P-PRM-001-0 Page 1 of 4
Assigned Dept: 105 (PM1) PV area: 1141 Main Work Center: 10CG-TAI
(PRTECH)
Frequency: 8 MON Time to Complete: 6 hours Shutdown Required: YES
□ An open work permit Open Permit #: ____________
This work is covered by:
□ A new work permit Permit Board #: ____________
Acceptance:
I have reviewed the work permit and carried out the required risk assessment. I have received the
necessary training and have been deemed competent to accomplish safely and correctly the required
tasks associated with this work instruction.
Document Register
Register identification Type Location Retention period
Maintenance Planning Permanent.
Process Plant MWI Register Copy/filing cabinet
office Latest version is kept.
Permanent:
Livelink Electronic IT server
All versions are kept.
Permanent
RCMCost Electronic IT server
Latest version is kept
Revision History
Task Details
PV1-1141-CRU1130 (JAW CRUSHER RBS)
Not Not
Task Description OK
OK Complete
Observations
Cambie los amortiguadores de goma
□ □ □
Maintenance Work Instruction Code: 1141 8MON CRU1130 MEC
STOP
Revision # 0
Issue Date [idate]
Next Revision Date TBD
PV-P-PRM-001-0 Page 4 of 4