4161 3M Hex252 Mech Stop
4161 3M Hex252 Mech Stop
STOP
Revision # 0
Issue Date 2023-10-16
Next Revision Date TBD
PV-P-PRM-001-0 Page 1 of 4
Assigned Dept: 175 (PMR) PV area: 4161 Main Work Center: 10RF-TAI
(PRTECH)
Frequency: 3MON Time to Complete: 9 hours Shutdown Required: YES
□ An open work permit Open Permit #: ____________
This work is covered by:
□ A new work permit Permit Board #: ____________
Acceptance:
I have reviewed the work permit and carried out the required risk assessment. I have received the
necessary training and have been deemed competent to accomplish safely and correctly the required
tasks associated with this work instruction.
Document Register
Register identification Type Location Retention period
Maintenance Planning Permanent.
Process Plant MWI Register Copy/filing cabinet
office Latest version is kept.
Permanent:
Livelink Electronic IT server
All versions are kept.
Permanent
RCMCost Electronic IT server
Latest version is kept
Revision History
Task Details
PV3-4161-HEE0293-HEX-252 (HEAT EXCHANGER PRIMARY BARREN TRIM 2)
Not Not
Task Description OK
OK Complete
Observations
verifique la placa fija, placa móvil y paquete de placa si
presentan desgaste, socavación o ataque corrosivo. Cambiar □ □ □
o reparar.
Cambiar paquete de placas con su respectivas juntas.
□ □ □
Inspeccionar los pernos o espárragos de compresión y las
tuercas, que no presenten desgaste excesivo ni corrosión. □ □ □
Cambiar si es necesario.
Verificar que las juntas estén instaladas correctamente y el
torque sea el correcto según la cantidad de placas usada □ □ □
para la operación correcta.
Realizar prueba de presión hidrostática, con presencia del
personal de operación □ □ □
Maintenance Work Instruction Code: 4161 3M HEX252 MECH
STOP
Revision # 0
Issue Date 2023-10-16
Next Revision Date TBD
PV-P-PRM-001-0 Page 4 of 4