SHORT CIRCUIT FORCE–

STRUNG BUS

Sensitivity: LNT Construction Internal Use


Short Circuit Force – Strung Bus

TABLE OF CONTENT

1. SUBSTATION ENGINEERING AND DESIGN - HOME PAGE……………………………3

2. CALCULATION CONSOLE……………………………………………………..………….….….3

2.1 Project Selection…………………………………………………….……….….….3

2.2 Copy Project / System ……………………………………..…....……………..…….........4

3. PROJECT PARAMETERS…..……………………………………………..…………………..…..5

4. DOCUMENT PARAMETERS …………………….…………………..………………….…...….6

5. FEEDER BAY CONFIGURATION……………….....………….……….…….....................….7

6. SHORT CIRCUIT FORCE – STRUNG BUS INPUTS…….…………………………........….9

7. SHORT CIRCUIT FORCE – STRUNG BUS OUTPUT…...........................................….11

8. DOCUMENT CREATION……………………………….……….…..................................…12

2|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

1. SUBSTATION ENGINEERING AND DESIGN - HOME PAGE

Select Short Circuit Force –


Strung Bus to perform the
calculation

2. CALCULATION CONSOLE

2.1 Project Selection

If you want to go to the


STEP1: Please select the Menu Page, Please click this
project button
STEP2: Please select the If you want to clear the
system STEP3: Click Go project, please click this
button

3|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

2.2 Copy Project / System

If this current project has the same details as


some previous existing project, Please Click the
Copy Project / System.

STEP1: Please select the


required Source Project.

STEP3: Click the Copy button if the


STEP2: Please select the current project requires copy of the
required Source System. previous project.

4|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

3. PROJECT PARAMETERS

Please select “Project Level


Parameters”

STEP 1: Please fill all mandatory


fields All mandatory fields are
marked with *

STEP2: Click on “Save” to


Save the Details

5|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

Please select “System


Parameters”

4. DOCUMENT PARAMETERS

Please select “Document


Parameters”

Click this button to go to


Calculation Console Page

6|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

STEP 1: Please fill all mandatory


fields

STEP3: Choose the


format of output STEP2: Choose the Language
document
and

STEP4: Click on “Save” to


Save the Details

5. FEEDER BAY CONFIGURATION

Please select “Feeder Bay


Configuration”

7|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

Edit/Delete options can be


used to edit/delete details

Please enter Feeder/ Bay Click on “Add New”


Name and SLD Reference

Please select “Input /


Output Console”

8|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

6. SHORT CIRCUIT FORCE – STRUNG BUS INPUTS

Please click on “Input” to


provide the inputs for
calculation

9|Page

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

Please click on “Layout


Arrangement” to upload
the image.

Please click on “Criteria


for Dropper Condition” to
refer the criteria’s.

Please fill all


mandatory fields All mandatory fields are
marked with *

Please click on the links to view


reference for Girder Width,
Length of Insulator, Spring
Constant, Material Constant,
Spacer weight and Pantograph
Suspended Mass

New conductors can be added


in General Masters -> Overhead
Conductors

Please click this button to Conductor parameter details can be


view the output edited only in General Masters ->
Overhead Conductors

10 | P a g e

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

7. SHORT CIRCUIT FORCE – STRUNG BUS OUTPUT

Click to view the


PDF File.

After checking the Calculation output, If you want to go to the Previous


Please freeze the calculation so that Page, click this button
document creation can be performed.

11 | P a g e

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

8. DOCUMENT CREATION

Please Enter the


Revision Code and
Document Date
Enter the document index and please
click “Add to Document “

12 | P a g e

Sensitivity: LNT
L&T Construction Internal Use
Short Circuit Force – Strung Bus

Step1: Please Enter Document index and If any annexures


Annexure name has to be added in
between the
calculation, it can
be added in Other
Attachments
section
Step2: Please upload the File

Click on “download” to get the complete


generated pdf document

Please enter the remarks for next revision and click


on “Submit” to enter the next revision.

13 | P a g e

Sensitivity: LNT
L&T Construction Internal Use