WORK ORDER / JOB PENDING

ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 01-02 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 0 BCM 0.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,472 BCM 1,584 TON
CLASSIFICATION : Pit KURANG : 355,639 BCM 49,093 TON
HALAMAN : 1
COMMENT AFTER PROGRESS

Ex-11 vs 5 DT loading OB, dumping


ke dumpingan ke OPD KPL, jarak
1300 meter (P1)

Ex-20 vs 5 DT loading ekspose


seam B, dumping ke OPD KPL,
jarak 1300 meter

Ex-18 vs 5 DT loading OB
ekspose seam A, dumping ke
OPD KPL, jarak 1300 meter
(P1)

SERAH TERIMA INSTRUKSI PELAKSANAAN PEKERJAAN SERAH TERIMA LAPORAN PELAKSANAAN PEKERJAAN
Dibuat Oleh, Diketahui Oleh, Diterima Oleh, Dilaporkan Oleh, Diterima Oleh, Diketahui Oleh,

Afri. S Riris.HH Afri. S Riris.HH


Mine Plan Engineering Suptend Product. SPV Product. SPV Mine Plan Engineering Suptend
WORK ORDER / JOB PENDING
ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 01-02 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 0 BCM 0.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,472 BCM 1,584 TON
CLASSIFICATION : Pit KURANG : 355,639 BCM 49,093 TON
HALAMAN : 2
COMMENT AFTER PROGRESS

Ex-13 vs 5 DT loading OB RL +90,


dumping ke OPD KPL, jarak 1400
meter

Ex-80 vs 6 DT loading OB RL+90


slope tegak/90 derajat, dumping
ke pembentukan jalan OPD KPL,
jarak 1400 meter
WORK ORDER / JOB PENDING
ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 01-02 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 0 BCM 0.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,472 BCM 1,584 TON
CLASSIFICATION : DSP KURANG : 355,639 BCM 49,093 TON
HALAMAN : 3
COMMENT AFTER PROGRESS

Continue dumping desak lumpuran void


WORK ORDER / JOB PENDING
ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 01-02 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 232,488 BCM 40,907.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 3,973 BCM 264 TON
CLASSIFICATION : General KURANG : 123,151 BCM 8,186 TON
HALAMAN : 4
COMMENT AFTER PROGRESS

1x PC 200/DZ general pembentukan


box control
tanggul di jalan menuju sump dan di
upayakan air tidak masuk kedalam Pit dan
jalan
Arahkan aliran air menuju box
control, agar air over flow dan
mengalir ke kanal DAS

Arah aliran air

Paritan

1x PC 200/DZ general pembentukan


tanggul di badan jalan simpang lima
ketika hujan, untuk memblok dan
mengarahkan aliran air dari parkiran
menuju paritan yang sudah di bentuk