WORK ORDER / JOB PENDING

ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 04-05 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 29,700 BCM 4,704.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,641 BCM 1,585 TON
CLASSIFICATION : Pit KURANG : 325,939 BCM 44,389 TON
HALAMAN : 1
COMMENT AFTER PROGRESS

Pita boundary LOM

Akses Jalan

Ex-13 vs 6 DT loading OB RL+90,


dumping ke OPD KPL, jarak 1600
meter

Ex-22 vs 5 DT loading OB RL+85,


dumping ke OPD KPL, jarak 1300
meter
Akses Jalan
Ex-11 vs 6 DT loading OB, dumping
ke dumpingan ke OPD KPL, jarak
1700 meter (P1)
Akses Jalan

Ex-80 vs 5 DT loading OB
RL+50, dumping ke OPD KPL,
jarak 1400 meter (P1) Ex-20 vs 5 DT loading OB RL+50,
dumping ke OPD KPL, jarak 1300
meter (P1)

SERAH TERIMA INSTRUKSI PELAKSANAAN PEKERJAAN SERAH TERIMA LAPORAN PELAKSANAAN PEKERJAAN
Dibuat Oleh, Diketahui Oleh, Diterima Oleh, Dilaporkan Oleh, Diterima Oleh, Diketahui Oleh,

Afri. S Riris.HH Afri. S Riris.HH


Mine Plan Engineering Suptend Product. SPV Product. SPV Mine Plan Engineering Suptend
WORK ORDER / JOB PENDING
ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2020
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 01-02 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 0 BCM 0.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,472 BCM 1,584 TON
CLASSIFICATION : Pit KURANG : 355,639 BCM 49,093 TON
HALAMAN : 2
COMMENT AFTER PROGRESS

Akses Jalan

Ex-15 Coal getting seam B VS 6 TC,


loading satu layer dan arahkan alirah
air menuju sump , jarak 3300 meter
WORK ORDER / JOB PENDING
ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 04-05 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 29,700 BCM 4,704.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,641 BCM 1,585 TON
CLASSIFICATION : DSP KURANG : 325,939 BCM 44,389 TON
HALAMAN : 3
COMMENT AFTER PROGRESS

Continue dumping desak lumpuran void

Jangan di dumping
WORK ORDER / JOB PENDING
ENGINEERING - PRODUKSI
PT. CAHAYA RIAU MANDIRI - DAS
2022
SITE : PT. CRM-DAS Overburden Coal Mining
DATE : 04-05 DES 2022 PLAN : 355,639 BCM 49,093 TON
TIME (From-Until) : 18.00 - 09.00 WIB MTD : 29,700 BCM 4,704.00 TON
PIT / BLOCK : CRM / UTARA PER DAY : 11,641 BCM 1,585 TON
CLASSIFICATION : General KURANG : 325,939 BCM 44,389 TON
HALAMAN : 4
COMMENT AFTER PROGRESS

1x PC 200/DZ general pembentukan


box control
tanggul di jalan menuju sump dan di
upayakan air tidak masuk kedalam Pit dan
jalan
Arahkan aliran air menuju box
control, agar air over flow dan
mengalir ke kanal DAS

Arah aliran air

Paritan

1x PC 200/DZ general pembentukan


tanggul di badan jalan simpang lima
ketika hujan, untuk memblok dan
mengarahkan aliran air dari parkiran
menuju paritan yang sudah di bentuk