Residual Risk
Contingency Plan / Risk Mitigation
Recovery
Internal / Positive / Evaluation Date:
Sl. No. Dept./ Project Events Risks / Opportunities Severity Probability Impact Measure If
External Issue Negative Effects
Control fails
Target Completion
Control Methodology/Plan Responsibility Severity Probability Impact
Period
Tender: DPC- Slippage of construction Delay from project approved 2. Recovery plan to be submitted within approved
6 External Issue Negative Critical Frequent Serious Project Manager Marginal Probable High
2018-030 schedule construction schedule 3. Necessary EOT recovery schedule
claim to be submitted if project delay is due to
the Client .
Delay in Document Affect the Execution of the project Distributing the Document submission within within approved
Tender: DPC- Internal/
8 Submission for Client related activities without Client Negative Critical Remote medium the team to speed-up the submission as per construction Project Manager Marginal Remote Low
2018-030 External Issue
Approval approval. the client needs. schedule
Probable 2 Critical: Risk Can result in significant quality / delivery 2. Medium: Cross functional team must authorize the task with contingency plan before it is
High High Serious Medium impact but unlikely to be serious effect on process function undertaken.
(B)
Occasional
High Serious Medium Low 3. Serious: Task must not proceed until general manager authorizes the task and contingency plan
(C) 3 Marginal: Risk will not result in quality / Delivery
taken to mitigate the risk.
Remote
Serious Medium Medium Low
(D) 4. High: Task must not proceed until control measures, contingency planning taken and risk rating
4 Negligible: No foreseeable quality / Delivery impact
reduced.
Improbable
Medium Medium Medium Low
(E)
Eliminated
Eliminated
(F)
Page 1 of 1
FR-059, Rev 01, Date:25.05.2017