Name of Project: Sheet No: 01

Sr. Rate Per


Description or Particular Quantity Unit Amount
no Unit

01 Earth work in foundation 54 M^3 143 7722

02 PCC in Foundation 9.8 M^3 50.28 492.744

03 UCR in Foundation 24.7 M^3 365 9015.5

04 Brick Work 39.1 M^3 5267 205939.7

05 Internal Plastering 147.88 M^2 210 31054.8

06 Plinth Filling 31.5 M^3 945 29767.5

07 Concrete in Lintel (0.3x0.15) 8.76 M^3 10113 88589.88

In Chajja 0.41 M^3 10113 4146.33

08 RCC Slab 10.6 M^3 10086 106911.6

09 External Plastering 81.65 M^2 477 38947.05

10 Celling Plastering 52.62 M^2 112 5893.44

11 Coloring

External coloring 81.65 M^2 76 6205.4

Internal coloring 154.18 M^2 76 11717.68

12 Flooring 52.62 M^2 633 33308.46

13 Skirting 56.2 RM 1023 57492.6