• A spillway is a structure used to
provide for the controlled release
of flows from a dam or levee into
a downstream area, typically being
the river that was dammed.
2
Upper South Dam, Australia – Ogee
Spillway
3
4
Source:http://www.leanhtuan.com/
5
6
Stepped Chute Spillway
7
Drop Spillway
8
Ogee Spillway
9
Ogee Spillway
10
Chute Spillway
11
Flip Bucket
12
• Common type of spillways:
13
Free overfall or straight drop spillway
14
Ogee or overflow spillway
•Siphonic action takes place after the air in the bend over the
crest has been exhausted.
17
Required spillway capacity
18
Overflow Spillway
Basic equation flow over weirs,
Where
Q=discharge m3/s
Q Cd Le He Cd=coefficient of discharge
3/ 2
Le=effective length
He=actual effective head
He Hd Ha Hd=design head
Ha=head due to velocity of approach
(sometimes neglected)
19
Contraction Coefficients
Table 1: Pier Contraction Coefficient (Kp)
•Downstream profile
dy 1
dx 0.8
23
C. vs.
24
Cd. vs. (P/Hd)
26
Problem 01
Problem 01: An overflow spillway with the upstream face vertical is to
be designed for a flood peak of 3000 m3/s. The height of the
spillway crest is kept at RL 130.50 m. The average river bed level
at the site is 102.50 m. The number of spans is 6, clear waterway
between piers is 12 m, thickness of the pier is 2 m, pier
contraction coefficient, Kp = 0.02 and abutment contraction
coefficient, Ka = 0.20 for the effect of end contraction. Assume
the coefficient of discharge is 2.20 and the slope of the d/s face
of the overflow section is 0.8: 1.
Q CLH 3/ 2
Q CLH 3/ 2
H 3/ 2
Q
CL
3000
H 3/ 2 7.11m
2.2(72)
29
P=Height of spillway crest at R.L- average river bed level at the site
=130.5-102.5
=28 m
Check,
P/Hd = 28/7.11
= 3.94 ~~greater than 1.33
So effect of velocity can be neglected
He=Hd+Ha(due to velocity~0)
He = Hd
X 1.85
y
2(7.110.85 )
X 1.85 X 1.85 X 1.85
y y 0 . 094 X 1.85
2(7.110.85 ) 2(7.110.85 ) 2(7.110.85 )
y 0.094 X 1.85
dy
0.174(0.1X 1.851 )
dx
dy
0.174 X 0.85
dx
Since slope of the d/s face of the overflow section is 0.8: 1, So...
dy 1
1
dx 0.8 1 0.85
x
1
0.174 X 0.85 0.8 * 0.174
0.8 x 10 .17 m