Professional Documents
Culture Documents
Industrial Cluster
Contact: 0938496666 2
Tan Thinh Industrial Cluster
Invester BMK Group
Land area 50ha
Located in Tan Thinh commune, Nam Truc district, Nam Dinh province
Operation period 50 years
The main industry is the textile and garment auxiliary industry;
manufacturing industry of plastic products; Industries do not cause heavy
pollution to the environment …
Contact: 0938496666 3
Tan Thinh Industrial Cluster
Infrastructure
• 39 leveled land lots with variety size (maximum construction
density of 70%, maximum height of 4 floors)
• 15 lots from 3,020m2 to 7,634m2 on national highway 21
• 24 lots from 9,440m2 to 16,000m2
• Labor scale of 3,000 employees
• Synchronous technical infrastructure includes:
• Power supply system 110/35Kv with transformer station
in site 2x400kvA
• Wastewater treatment system with a capacity of
1,000m3/day, incident lake 2,000m3
• Clean water supply system with a capacity of
1,500m3/day
• Administrative works, services
Contact: 0938496666 4
Ideal Location
Sân bay
Nội Bài
5
Tan Thinh
Industrial Cluster KCN
Mỹ Trung KCN
Phúc Khánh
Logistic Ga
Cảng
Diêm Điền
Nam Định
Cảng Tân Cảng
• Inland waterways:
Nam Định
Thịnh
Trà Lý
KCN
Bảo Minh
• 5km to planned Nam Dinh new port on the Red river (2021-
2030), receive ships up to 3,000DWT
• Seaways:
Contact: 0938496666 7
Tan Thinh Industrial Cluster Area Connection
Contact: 0938496666 8
Abundant Human Resources
& High Quality
Contact: 0938496666 9
Tax incentives
Land rental fee • Land rental paid once for the entire 50-year period, including incentives and exemptions according to regulations.
- Exemption from import tax on goods used to create fixed assets (machinery, equipment and components, details, materials that
Import and export tax
cannot be produced domestically...) (According to Decree 87/2010/ND-CP -CP)
Tax on transferring profits abroad - Tax exemption for transferring profits abroad (according to Decree 186/2010/ND/CP)
Financial support - Support for bank loans with incentives from banks for investors
Contact: 0938496666 10
Competitive Pricing
Contact: 0938496666 11
PROJECT PROGRESS
11/2022 12/2023 1/2025
1:500 PLAN CONSTRUCTION OFFICIAL OPERATION
Officially approved Officially put the entire
1:500 Planning for Start construction
phase project into operation,
the project entering the
manufacturing phase
Services supply
Accompany
Human Factories and
throughout Additional
resources warehouses
the rental services
supply Construction
period
Contact: 0938496666 13
Thank you
PHONE NUMBER: +84.09.3849.6666
+84.09.4114.7997
WEBSITE: BMKGROUP.COM.VN
ADDRESS: 1ST FLOOR, B2 TOWER ,
ROMAN PLAZA BUILDING, TO HUU
STREET, DAI MO WARD,NAM TU LIEM
DISTRICT, HANOI CITY, VIETNAM
14