You are on page 1of 3

GREAT CIRCLE SHIPPING AGENCY LIMITED

BUNKER PLAN
Form : S - 07
( Rev 04/14 )
M/V. BOONYA NAREE DATE 10-Mar-14 PLACE OF BUNKER : Singpore
FUEL OIL ( F.O. )
EST QTY TO REC
MAX' INITAIL INITIAL EST FINAL EST FINAL
Tank No. MAX. CBM
SDG/ULG SDG/ULG
M3… MT SDG/ULG
M3… MT Mt %
HFO_1P_tank 392.72 12250 4930 149.96 144.07 0 0.00 Err:502 Err:502 0.00

HFO_1S_tank 392.98 12300 9440 301.41 291.62 9500 303.40 293.34 1.72 77.20

HFO_2P_tank 146.30 6950 0 0.00 0.00 4000 115.92 112.08 112.08 79.24

HFO_2S_tank 146.32 6950 1420 33.38 31.91 0 0.00 Err:502 Err:502 0.00

HFO Servic P tank 30.89 2500 1410 17.23 16.02 0 0.00 Err:502 Err:502 0.00

HFO Servic S tank 31.04 2500 2400 29.61 27.56 0 0.00 Err:502 Err:502 0.00

HFO Sett P tank 31.46 2500 1520 19.19 18.08 0 0.00 Err:502 Err:502 0.00

HFO Sett S tank 31.35 2500 1380 17.59 16.40 0 0.00 Err:502 Err:502 0.00

HFO Over flow tank 36.24 2350 630 5.50 5.00 0 0.00 0.00 -5.00 0.00

Total 1239.3 573.86 550.66 419.32 Err:502 Err:502 33.84

MDO
INITIAL EST FINAL EST FINAL
MAX' INITAIL EST QTY TO REC mt
Tank No. MAX. CBM
SDG/ULG SDG/ULG %
M … MT
3
SDG/ULG M … MT
3

MDO Storate P tank 48.90 5350 3400 24.49 20.17 0 0.00 0.00 -20.17 0.00

MDO Storate S tank 48.76 5650 1690 5.18 4.26 0 0.00 0.00 -4.26 0.00

Total 97.7 29.67 24.43 0.00 0.00 -24.43 0.00

BUNKERING SEQUENCE
1 2 3 4 5 6 7 8 9
F.O. TK.
D.O. TK.

SP.GR. TEMP. OC CORR. FACTOR DRAFF BEFORE AFTER

BUNKERED F.O.
HFO_1P_tank Err:502 15 0.0000
HFO_1S_tank 0.9784 15 0.9784 FWD 5.38 6.65

HFO_2P_tank 0.9784 15 0.9784 AFT 6.7 8.07

HFO_2S_tank Err:502 15 0.0000


HFO Servic P tank Err:502 15 0.0000
HFO Servic S tank Err:502 15 0.0000
HFO Sett P tank Err:502 15 0.0000
HFO Sett S tank Err:502 15 0.0000
HFO Over flow tank 0.9200 15 0.9500 TRIM 1.32 1.42

BUNKERED D.O.
MDO Storate P tank 0.8400 15 0.8697 FWD 5.38 6.65

MDO Storate S tank 0.8400 15 0.8697 AFT 6.7 8.07

TRIM 1.32 1.42


Note : - Bunker Plant shall be completed prior to every bunkering & signed by the Chief Engineer & Master for approval.

Signature of Chief Engineer : - …………………………………. Signature of Master : - …………………………..


M.V. BOONYA NAREE Form : S - 07

( Rev 06/14 )

Tank Condition
DRAFT
FWD 5.38 DATE : - 19.11.2015 PORT : - JNPT
AFT 6.7 S.W. 37 o
C
TRIM 1.32 E/ R 29 o
C
LIST 0 Degee Time 0800 Hrs.

Pls. Note : - Port List record as - and STBD List record as +

Before Bunkering HFO


TANK MAX MAX Actual Obs V
SG @ 15o Temp oC OBS. SG Mt %
NO. M3 Sndng (mm) Sdng M3
HFO_1P_tank 392.72 12250 4930 149.963 0.9716 31 0.9607 144.074 38.2
HFO_1S_tank 392.98 12300 9440 301.407 0.9784 31 0.9675 291.618 76.7
HFO_2P_tank 146.30 6950 0 0.000 0.9784 31 0.9675 0.000 0.0
HFO_2S_tank 146.32 6950 1420 33.377 0.9669 31 0.9560 31.909 22.8
HFO Servic P tank 30.89 2500 1410 17.233 0.9784 86 0.9297 16.021 55.8
HFO Servic S tank 31.04 2500 2400 29.605 0.9784 84 0.9310 27.564 95.4
HFO Sett P tank 31.46 2500 1520 19.186 0.9784 68 0.9421 18.076 61.0
HFO Sett S tank 31.35 2500 1380 17.588 0.9784 82 0.9324 16.399 56.1
HFO Over flow tank 36.24 2350 630 5.499 0.9200 31 0.9090 4.998 15.2

TOTAL 1239.3 573.86 550.66 46.3


Log book 546.51
4.15

Before Bunkering MDO


TANK MAX MAX Actual Obs V
SG @ 15o Temp oC OBS. SG Mt %
NO. M3 Sndng mm. Sdng (mm) M3
MDO Storate P tank 48.90 5350 3400 24.489 0.8400 38 0.8236 20.170 50.1
MDO Storate S tank 48.76 5650 1690 5.176 0.8400 38 0.8236 4.263 10.6
MDO Sett P tank 26.94 6250 3150 9.384 0.8697 38 0.8535 8.009 34.8
MDO Servic S tank 27.12 6350 5240 20.474 0.8697 38 0.8535 17.475 75.5
TOTAL 151.72 59.523 49.92 39.23
Log book 46.25
3.67

………………………………
Chief Engineer
M.V. BOONYA NAREE Form : S - 07

( Rev 06/14 )

Tank Condition
DRAFT
FWD 6.65 DATE : - 28.10.15 PORT : - KOCHI
AFT 8.07 S.W. 30 o
C
TRIM 1.42 E/ R 37 o
C
LIST 0 Degee Time 1000 Hrs.

Pls. Note : - Port List record as - and STBD List record as +

After Bunkering HFO


TANK MAX MAX Actual Obs V
SG @ 15o Temp oC OBS. SG Mt %
NO. M3 Sndng (mm) Sdng M3
HFO_1P_tank 392.72 12250 0.000 Err:502 Err:502 0.0
HFO_1S_tank 392.98 12300 9500 303.397 0.9784 32 0.9668 293.336 77.2
HFO_2P_tank 146.30 6950 4000 115.924 0.9784 32 0.9668 112.080 79.2
HFO_2S_tank 146.32 6950 0.000 Err:502 Err:502 0.0
HFO Servic P tank 30.89 2500 0.000 Err:502 Err:502 0.0
HFO Servic S tank 31.04 2500 0.000 Err:502 Err:502 0.0
HFO Sett P tank 31.46 2500 0.000 Err:502 Err:502 0.0
HFO Sett S tank 31.35 2500 0.000 Err:502 Err:502 0.0
HFO Over flow tank 36.24 2350 0 0.000 0.9500 0.9602 0.000 0.0

TOTAL 1239.3 419.32 Err:502 33.8

Log book
Err:502

After Bunkering MDO


TANK MAX MAX Actual Obs V
SG @ 15o Temp oC OBS. SG Mt %
NO. M3 Sndng mm. Sdng (mm) M3
MDO Sorate P tank 48.90 5350 0.000 0.8697 34 0.8563 0.000 0.0
MDO Storate S tank 48.76 5650 0.000 0.8697 34 0.8563 0.000 0.0
MDO Sett P tank 26.94 6250 0.000 0.8697 34 0.8563 0.000 0.0
MDO Servic S tank 27.12 6350 0.000 0.8697 34 0.8563 0.000 0.0
TOTAL 151.72 0.000 0.00 0.0

Log book 67.20


-67.20

………………………………
Chief Engineer