MAINTENANCE REPORT FOR FEED AIR COMPRESSOR IN 250 TPD NEW
OXYGEN PLANT
TO: Mr. ALI SASI
THE FOLLOWING ARE OBSERVATIONS AND WORK DONE FOR THE FEED AIR .COMPRESSOR INSTALLED IN 250 TPD NEW OXYGEN PLANT :MECHANICAL WORKS
1. FEED AIR COMPRESSOR INSPECTION DONE AND FOUND STAGE-2
IMPELLER SMALL PIECE OF PART BREAKEN. 2. CHECKED THE MANUAL AND GIVEN PART NUMBER FOR NEW IMPELLER WITH BALANCING. 3. AFTER RECEIVED NEW IMPALLER, REPLACEMENT DONE AND MEASURED VALUES FOR ALL STAGES TAKEN IN COORDINATION WITH SERVICE ENGINNER. 4. ALL OIL SEAL & SEALING GASKETS WERE REPLACEMENT DONE. 5. MAINTENANCE DONE FOR ALL STAGE INTERCOOLERS. 6. OIL FILTER REPLACEMENT DONE. 7. AFTER ASSEMBLING COMPRESSOR, MOTOR AND COMPRESSOR ALIGNMENT DONE.
INSTRUMENTATION WORKS:
1.ALL INSTRUMENTS MOUNTED ON COMPRESSOR WERE REMOVED
2.VIBRATION SENSOR FOUND DAMAGE, SO ORDERED NEW SENSORS AS PER PART NUMBER. 2. AFTER COMPRESSOR INSTALLATION, NEW VIBRATION SENSORS AS RECEIVED WERE FIXED AND GAP VOLTAGES MAINTAINED AS PER RECORDS 3.ALL TEMPERATURE, PRESSURE SENSORS WERE INSTALLED AND CHECK PARAMETERS ACCORDING TO OPERATION. 4. CHECKED THE INLET VALVE OPERATION FROM CONTROLLER AND RESPONSE ACCORDING TO COMMAND WAS SATISFACTORY. 5. BLEED VALVE OPERAION NOT GOOD ACCORDING TO COMMAND GIVEN FROM CONTROLLER, SO ACTUATOR REPLACEMENT DONE AND TRIALS TAKEN, NOW WORKING OK. 6. RESISTANCE PANEL EACH PHASE RESISTANCE, MOTOR AND CABLE INSULATION VALUES WERE CHECKED AND FOUND SATISFACTORILY. 7. ALL ALARM & TRIP PARAMETERS WERE VERIFIED IN CONTROLLER AND MADE READY FOR OPERATION. AFTER WORK COMPLETE BY MECHANICAL & INSTRUMENTATION TEAM FEED AIR COMPRESSOR STARTED AND RUNNING SMOOTHLY.