You are on page 1of 15

PROJECT /

PROPOSED (...+...+...) FLOORS


…………... BUILDING.

LOCATION \
………... - ………. - QATAR

OWNER \
………………………………

CONSULTING \

‫الحسابات الهيدروليكيه العمال تغذيه المياه‬


PLUMPING Calculation Sheet
Estamited Water Requirement

Office building
Total Area of Floors = 37038 m2
Gallon Per Day Per Capita = 20 Gallon
Hour Per Day Usage = 9 Hours
Peak Flow Rate = 2.5 X Average flow Rate

No. of Person = 4001 Person


Daily Consumption = 80020 Gallon
Average Flow Rate = 149 Gpm
Peak Flow Rate = 372.5 Gpm

Resturant building
Total Area of Floors = 37038 m2
Gallon Per Day Per Capita = 25 Gallon
Hour Per Day Usage = 9 Hours
Peak Flow Rate = 2.5 X Average flow Rate

No. of Person = 4001 Person


Daily Consumption = 100025 Gallon
Average Flow Rate = 186 Gpm
Peak Flow Rate = 465 Gpm

Appartement House
No of Bed Rooms = 1750 Room
Gallon Per Day Per Capita = 100 Gallon
Hour Per Day Usage = 15 Hours
Peak Flow Rate = 3.0 X Average flow Rate

No. of Person = 1000 Person


Daily Consumption = 100000 Gallon
Average Flow Rate = 112 Gpm
Peak Flow Rate = 336 Gpm

Hotels
No of Suit = 1750 Suit
Gallon Per Day Per Capita = 130 Gallon
Hour Per Day Usage = 11 Hours
Peak Flow Rate = 3.0 X Average flow Rate

No. of Person = 1000 Person


Daily Consumption = 130000 Gallon
Average Flow Rate = 197 Gpm
Peak Flow Rate = 591 Gpm

Hospitals
No. of Bed = 500 Bed
Consumption per year = 50000000 Gal/year
Consumption per month = 5000000 Gal/month
Peak Hourly Flow = 15000 Gal/hour
Minimum hourly flow = 1500 Gal/hour
Peak Installatin flow = 500 Gpm
Consumption per day = 150000 Gal/day
Average Installatin flow = 250 Gpm

University

Dormitory Student (Resedential)

Area of Capita = 9650 m2


No. of Students = 1043 Student

Fixture Usage /Day Gal/ Usage Gal/ Usage


Water closet 3 5 15
Shower 1 20 20
Washup 2 10 20
Miscellaneous 20
Total 78225

Kitchen and Resturant


Area of Capita = 9650 m2
No. of Students = 1043 Student
NO of Meals per Day = 3 Meal
Assume Gal/meal / Capita = 2 Gallon
Total = 6258 Gallon

Non-Residential Student

Area of Capita = 9650 m2


No. of Students = 1043 Student

Fixture Usage /Day Gal/ Usage Gal/ Usage


Water closet 2 5 10
Washup 2 5 10
Miscellaneous 5
Total 25

Faculty and Staff

Area of Capita = 9650 m2


No. of Staff = 1043 Staff

Fixture Usage /Day Gal/ Usage Gal/ Usage


Water closet 2 5 10
Washup 2 5 10
Miscellaneous 5
Total 26075

General Laboratory use

No. of Fixture Usage Hour /Day Gal/ Usage Gal/ Usage


10 1 10 100

General Kitchen

Area of Capita = 9650 m2


No. of Students = 1043 Student
NO of Meals per Day = 2 Meal
Assume Gal/meal / Capita = 2 Gallon
Total = 4172 Gallon

Gym

No. of Showers Usage /Day Gal/ Usage Gal/ Usage


10 8 4 1600

Get All University Water Demand Per Day 123511.3 Gallon

Shopping Centers

Area of Capita = 46296 m2


Domestic Water Consumption = 49999.68 Gallon
Average Flow Rate = 83.3328 Gpm
Peak Flow Rate = 166.6656 Gpm

Parking and Pouplation Methods

No. of Parking Space = 4000 Space


Approximae Customer /day = 24000 Customer
Water Consumption per Coustmure = 1.25 Gallon/day
Domestic Water Consumption = 30000 Gallon

No. of Empolyee = 800 Empolyee


Water Consumption per Coustmure = 20 Gallon/day
Domestic Water Consumption = 16000 Gallon

Total load = Empolyee load + Coustumer Load


1.1*( 30000 + 16000 )= 50600 Gallon

Average Flow Rate = 85 Gpm


Peak Flow Rate = 170 Gpm

Court Houses And Detention Jails


Occupancey Population GPDC Total GPD
No. of Staff 200 20 4000
Office Personnel 2000 20 40000
Short Term Detainess ( prisoners) 1000 10 10000
Long Term Detainess ( prisoners) 1000 80 80000
TOTAL 134000

Flow Rate
Staff 4000 / 480 min = 8.4
Office 40000 / 480 min = 83.4
Short Term 10000 / 360 min = 27.8
Long Term 80000 / 900 min = 88.9
Average Flow Rate 208.5

Peak Flow Rate 208.5 X 2 = 417 Gpm


1- Lift Pump Flow Required

No .of Pumps Will Be Used for Boosting 1 Duty 1 Standby

Roof Water Tank Size 6 m3


Selected Filling Time 2 Hr
Tank Shoul be filled as per Kahramaa requirement Within 2 hours
Getting Pump Flow 3 m3/hr
0.84 L/s
13.4 gpm

2- Lift Pump Pressure Required

Please Refer to next Page for Detailed Calculation


Based on Calculation Get Required Head 59 Psi

3- Booster Pump Power

BHP = GPM * HD * Sp.GR / ( 3960 * Pump EFF)

Where
GPM Pump Flow Gallon / min SP.GR. Specific Gravity1 for Water
HD Ft H2O Pump EFF 65% for Big size Pump
BHP Break Horse Power 54% For Small Size Pump

Selected Pump Effeciebcy 60 %

BHP 0.77 HP
0.57 KW

13.4 GPM
Pump Flow
0.85 L/s
59 PSI
Pump Head
41.5 m
Pump HP 0.57 HP
Pump Kw 0.57 KW
No. of Pumps 1 Duty + 1 Standby
1- Boster Pump Pressure Required

Calculation Will Based on William Hazen Formula

William Hazen Formula Used

∆P = 6.189*L*(V/C)1.852 *(1/D)1.167 )*(ρ*g)

Where :
∆P Pressure drop Pa
L Length of Pipe in meter
V Velocity m/s
C Roughtness factor
D Internal Diameter of Pipe
ρ Water Denisty 1000 Kg/m 3
g 9.810 m/s2
K Fitting Loss Coffecient

From Manufacture of PPR Pipes

PN 10- SDR 11

Nominal
Wall Inner
Outer Diameter
Thicness Diameter
Diameter

20 20 2 16
25 25 2.3 20.4
32 32 2.9 26.2
40 40 3.7 32.6
50 50 4.6 40.8
63 63 5.8 51.4
75 75 6.8 61.4
90 90 8.2 73.6
110 110 10 90
Used Calculation Based on PN-10

Velocity
Pipe Assume 1.5
Water Checking Friction
Length in Diameter Pipe Diameter Velocity Friction Loss for Pipe
Pipe Section Flow Rate Status Min Loss
m Nominal iner (mm) m/s (Pa/m) Fitting &
(L/s) 1.2-Max (Pa/m)
(mm) Valve Pa
1.8m

1 2 2 40 32.6 1 1.2 OK 432 864 1296


2 3 2 50 40.8 2 1.53 OK 521 1042 1563
3 4 2 63 51.4 3 1.45 OK 361 722 1083
4 5 2 75 61.4 4 1.35 OK 257 514 771
5 6 2 75 61.4 5 1.69 OK 389 778 1167
6 7 2 90 73.6 6 1.41 OK 225 450 675
7 8 2 90 73.6 7 1.65 OK 301 602 903
8 9 12 110 90 8 1.26 OK 145 1740 2610
9 10 2 110 90 9 1.41 OK 178 356 534
10 11 2 90 73.6 0 0 Wong 0 0 0
11 12 2 40 32.6 0 0 Wong 0 0 0
12 13 2 40 32.6 0 0 Wong 0 0 0
13 14 2 40 32.6 0 0 Wong 0 0 0
14 15 2 40 32.6 0 0 Wong 0 0 0
15 16 2 40 32.6 0 0 Wong 0 0 0
16 17 2 40 32.6 0 0 Wong 0 0 0
17 18 2 40 32.6 0 0 Wong 0 0 0
10602

Pressure Drop Though Pipe and Fittings 1.09 m


Static Head 15 m
Pressure Drop Though Water Filters 10 m
Pressure Drop In Float Valve 5 m
Residual Pressure Required 8 m

Get the Total Pressure Required for Pump 39.09 m


Assume 10% as factor od safety 43 m
4.3 bar
64 Psi
1- Boster Pump Pressure Required

Calculation Will Based on William Hazen Formula

William Hazen Formula Used

∆P = 6.189*L*(V/C)1.852 *(1/D)1.167 )*(ρ*g)

Where :
∆P Pressure drop Pa
L Length of Pipe in meter
V Velocity m/s
C Roughtness factor
D Internal Diameter of Pipe
ρ Water Denisty 1000 Kg/m 3
g 9.810 m/s2
K Fitting Loss Coffecient

From Manufacture of PPR Pipes

PN 12.5 - SDR 9.0

Nominal
Wall Inner
Outer Diameter
Thicness Diameter
Diameter

20 20 2.3 14.4
25 25 2.8 18
32 32 3.6 23.3
40 40 4.5 29
50 50 5.6 36.2
63 63 7.1 45.6
75 75 8.4 54.4
90 90 10.1 65.4
110 110 12.3 79.8
Used Calculation Based on PN-12.5

Velocity
Pipe Assume 1.5
Water Checking Friction
Length in Diameter Pipe Diameter Velocity Friction Loss for Pipe
Pipe Section Flow Rate Status Min Loss
m Nominal iner (mm) m/s (Pa/m) Fitting &
(L/s) 1.2-Max (Pa/m)
(mm) Valve Pa
1.8m

1 2 2 40 31 1 1.32 OK 546 1092 1638


2 3 2 50 38.8 2 1.69 OK 664 1328 1992
3 4 2 63 48.8 3 1.6 OK 460 920 1380
4 5 2 75 58.2 4 1.5 OK 332 664 996
5 6 2 90 69.8 5 1.31 OK 209 418 627
6 7 2 90 69.8 6 1.57 OK 292 584 876
7 8 2 110 85.4 7 1.22 OK 145 290 435
8 9 2 110 85.4 8 1.4 OK 187 374 561
9 10 2 110 85.4 9 1.57 OK 231 462 693
10 11 2 110 85.4 0 0 Wong 0 0 0
11 12 2 40 31 0 0 Wong 0 0 0
12 13 2 40 31 0 0 Wong 0 0 0
13 14 2 40 31 0 0 Wong 0 0 0
14 15 2 40 31 0 0 Wong 0 0 0
15 16 2 40 31 0 0 Wong 0 0 0
16 17 2 40 31 0 0 Wong 0 0 0
17 18 2 40 31 0 0 Wong 0 0 0
9198

Pressure Drop Though Pipe and Fittings 0.94 m


Static Head 15 m
Pressure Drop Though Water Filters 10 m
Pressure Drop In Float Valve 5 m
Residual Pressure Required 8 m

Get the Total Pressure Required for Pump 38.94 m


Assume 10% as factor od safety 42.83 m
4.3 bar
64 Psi
1- Boster Pump Pressure Required

Calculation Will Based on William Hazen Formula

William Hazen Formula Used

∆P = 6.189*L*(V/C)1.852 *(1/D)1.167 )*(ρ*g)

Where :
∆P Pressure drop Pa
L Length of Pipe in meter
V Velocity m/s
C Roughtness factor
D Internal Diameter of Pipe
ρ Water Denisty 1000 Kg/m 3
g 9.810 m/s2
K Fitting Loss Coffecient

From Manufacture of PPR Pipes

PN 16 - SDR 7.4

Nominal
Wall Inner
Outer Diameter
Thicness Diameter
Diameter

20 20 2.8 14.4
25 25 3.5 18
32 32 4.4 23.3
40 40 5.5 29
50 50 6.9 36.2
63 63 8.6 45.6
75 75 10.3 54.4
90 90 12.3 65.4
110 110 15.1 79.8
Used Calculation Based on PN-16

Velocity
Pipe Assume 1.5
Water Checking Friction
Length in Diameter Pipe Diameter Velocity Friction Loss for Pipe
Pipe Section Flow Rate Status Min Loss
m Nominal iner (mm) m/s (Pa/m) Fitting &
(L/s) 1.2-Max (Pa/m)
(mm) Valve Pa
1.8m

1 2 2 40 29 1 1.51 OK 757 1514 2271


2 3 2 63 45.6 2 1.22 OK 301 602 903
3 4 2 75 54.4 3 1.29 OK 272 544 816
4 5 2 75 54.4 4 1.72 OK 463 926 1389
5 6 2 90 65.4 5 1.49 OK 286 572 858
6 7 2 90 65.4 6 1.79 OK 402 804 1206
7 8 2 110 79.8 7 1.4 OK 202 404 606
8 9 2 110 79.8 8 1.6 OK 259 518 777
9 10 2 110 79.8 9 1.8 OK 322 644 966
10 11 2 110 79.8 0 0 Wong 0 0 0
11 12 2 40 29 0 0 Wong 0 0 0
12 13 2 40 29 0 0 Wong 0 0 0
13 14 2 40 29 0 0 Wong 0 0 0
14 15 2 40 29 0 0 Wong 0 0 0
15 16 2 40 29 0 0 Wong 0 0 0
16 17 2 40 29 0 0 Wong 0 0 0
17 18 2 40 29 0 0 Wong 0 0 0
9792

Pressure Drop Though Pipe and Fittings 1 m


Static Head 15 m
Pressure Drop Though Water Filters 10 m
Pressure Drop In Float Valve 5 m
Residual Pressure Required 5 m

Get the Total Pressure Required for Pump 36 m


Assume 10% as factor od safety 39.6 m
4 bar
59 Psi
1- Boster Pump Pressure Required

Calculation Will Based on William Hazen Formula

William Hazen Formula Used

∆P = 6.189*L*(V/C)1.852 *(1/D)1.167 )*(ρ*g)

Where :
∆P Pressure drop Pa
L Length of Pipe in meter
V Velocity m/s
C Roughtness factor
D Internal Diameter of Pipe
ρ Water Denisty 1000 Kg/m 3
g 9.810 m/s2
K Fitting Loss Coffecient

From Manufacture of PPR Pipes

PN 20 - SDR 6.0

Nominal
Wall Inner
Outer Diameter
Thicness Diameter
Diameter

20 20 3.4 13.2
25 25 4.2 16.6
32 32 5.4 21.2
40 40 6.7 26.6
50 50 8.3 33.4
63 63 10.5 42
75 75 12.5 50
90 90 15 60
110 110 18.3 73.4
Used Calculation Based on PN-20

Velocity
Pipe Assume 1.5
Water Checking Friction
Length in Diameter Pipe Diameter Velocity Friction Loss for Pipe
Pipe Section Flow Rate Status Min Loss
m Nominal iner (mm) m/s (Pa/m) Fitting &
(L/s) 1.2-Max (Pa/m)
(mm) Valve Pa
1.8m

1 2 2 40 26.6 1 1.8 OK 1160 2320 3480


2 3 2 63 42 2 1.44 OK 450 900 1350
3 4 2 75 50 3 1.53 OK 411 822 1233
4 5 2 90 60 4 1.41 OK 286 572 858
5 6 2 90 60 5 1.77 OK 435 870 1305
6 7 2 110 73.4 6 1.42 OK 229 458 687
7 8 2 110 73.4 7 1.65 OK 302 604 906
8 9 2 110 73.4 0 0 Wong 0 0 0
9 10 2 110 73.4 0 0 Wong 0 0 0
10 11 2 110 73.4 0 0 Wong 0 0 0
11 12 2 40 26.6 0 0 Wong 0 0 0
12 13 2 40 26.6 0 0 Wong 0 0 0
13 14 2 40 26.6 0 0 Wong 0 0 0
14 15 2 40 26.6 0 0 Wong 0 0 0
15 16 2 40 26.6 0 0 Wong 0 0 0
16 17 2 40 26.6 0 0 Wong 0 0 0
17 18 2 40 26.6 0 0 Wong 0 0 0
9819

Pressure Drop Though Pipe and Fittings 1.01 m


Static Head 15 m
Pressure Drop Though Water Filters 10 m
Pressure Drop In Float Valve 5 m
Residual Pressure Required 8 m

Get the Total Pressure Required for Pump 39.01 m


Assume 10% as factor od safety 42.91 m
4.3 bar
64 Psi
Automatic Irrigation System Calculation

Irrigation Water Demand Requirement

Plant Description Area / Quantity Watering Rate LPD


Shrubs 431.47 m2 16 liters/ day/m2 6903.52
Turf or Grass 1872 m2 12 liters/ day/m2 22464
Ground Cover 1160 m 2
12 liters/ day/m2 13920
Trees 115 No. 120 liters/ day/m2 13800
Palms 8 No. 150 liters/ day/m2 1200
Total Watering Rate 58287.52
Adding 2% as Factor Of Safety 59453.2704

From Perivious Data Get


Storage tank for 1 day = 59.5 m3
Storage tank for 2 days = 119 m3