You are on page 1of 22

PROJECT: R

E
O V
PROPOSED RENOVATION OF
THREE-STOREY BUILDING FOR
Y -
ISOLATION ROOMS
F L
H
MAIN ENTRANCE
NORTH MAIN EXIT
GATE
I WATER TANK
STORE

G
10 26 STAIR
S

A B 6 J 13
K
OLD PS C E F
BGHMC DRIVE
WAY 27
14 L

1
2 Q
3
R
S
T P

22 19 18

U 23 24 V
W SHED
WATER TANK

IL-AM
TO BRGY. PH

17

OLD BUILDING

WATER TANK

PARTIAL INDICATIVE BGHMC MASTER BENECO POST


25
1 SITE DEVELOPMENT PLAN 0 10 20 30 40 50 60 70 80 90 100m
BENECO POST
S 1 SCALE 1:1,000 MTRS 0 10 000 50 000 100 000mm

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-1
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
CONSTRUCTION NOTES NOTES ON COLUMNS

HOOK LENGTH
GENERAL NOTES HOOK LENGTH

DIAMETER
REBAR
D D

NOTES ON REINFORCEMENT NOTES ON CONCRETE HOLLOW BLOCKS

MATERIAL SPECIFICATIONS

400
HOOK

HOOK
400
400

NOTES ON SPLICES

400
0
CONCRETE MIXING AND PLACEMENT 60
A A'
0
60

HOOK
400
60
0

40 BAR DIAMETER
600mm MINIMUM

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-2
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
6 050
RW 2
J

F2-C4

F2-C4

F2-C4

F2-C4

F2-C4
F-01 C3

RWF 2
2 200
H

F2-C4

F2-C4

F2-C4

F2-C4

F2-C4
EFT-01
G'
4 300
G

RWF 1
RW 1

7 675
4 200

FOUNDATION PLAN
1:100 MTS
CFT-01
F

C3
C3
22 750
4 000

CFT-01
E

C4

C4
250mm STRUCTURAL GAP
4 300

CFT-01

EXISTING STRUCTURE
B C D

C4

C4

SCALE
250

C1

C2

C3

C2
C3
CFT-02

CFT-02

CFT-02
CFT-03

CFT-03
3 500

3
1
S
C3

C2
C3
C2
C1
A

2 000
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-3
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
RW 2

C4
J

C4

C4

C4
C4
C3
2 200

1B-1

1B-1

1B-1

1B-1

1B-1
H

C4

C4

C4

C4

C4

GROUND FLOOR FRAMING PLAN


G'

1:100 MTS
GENERATOR
4 300

PROPOSED
G

RW 1
1B-1

1B-1
4 200
F

C3

C3
22 750
4 000

1B-1

1B-1
E

C4

C4
250mm STRUCTURAL GAP

1B-1

1B-1

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300

EXISTING STRUCTURE
B C D

C4

C4
250

1B-1 1B-1 1B-1 1B-1 1B-1

C1

C1

C2

C3

C2
C3
3 500

1B-1
1B-1

1B-1

SCALE
C3

C2
C3
C2
C1

C1
1B-1 1B-1 1B-1 1B-1 1B-1
A

4
1
S
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-4
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
RW 2
J

RB-1 RB-1 RB-1 RB-1 RB-1

C4

C4

C4

C4

C4
C3

STAIRS
2 200

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1
H

C4

C4

C4

C4

C4
RB-1 RB-1 RB-1 RB-1 RB-1

1:100 MTS
SECOND FLOOR FRAMING PLAN
G'
4 300

2B-5
G

2B-3

2B-3
4 200
F

2B-1

C3
C3
22 750
4 000

RB-1

RB-1
E

RB-1

C4
C4
250mm STRUCTURAL GAP

RB-1

RB-1

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300

EXISTING STRUCTURE
B C D

RB-1

C4
C4
250

2B-2 2B-2 2B-4 2B-1 2B-4

C1

C1

C3
C2

C3

C2
STAIRS
3 500

2B-1

2B-1
2CB-2
2B-3

2B-3

2B-3

SCALE
C3

C2
C2

C3
C1

C1
A

2B-2 2B-2 2B-4 2B-1 2B-4

S 4a
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-4a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
S 5b
3
J

3B-4
C3

STAIRS

THIRD FLOOR FRAMING PLAN


1:100 MTS
2 200

3B-1

3B-3

ROOF
H
G'
4 300

S 5b
2
3B-5
G

3B-3

3B-3
4 200

C3

C3
F

3B-3
22 750
4 000

PART OF PROPOSED DELTA E.R.


E

C3

C3

C3

C3
250mm STRUCTURAL GAP
4 300

SCALE
B C D

S 4b
RDB-2 3B-2 3B-4 3B-1 3B-4

C1

C1

1
C3
C2

C3

C2
STAIRS
RDB-1
3 500

3B-1

3B-1
3CB-2
3B-3

3B-3

3B-3

S 5b
1
C3

C2
C2

C3
C1

C1

EXISTING COLUMN
A
RDB-2 3B-2 3B-4 3B-1 3B-4
6 075 1 500 1 825 3 275 3 050 6 075 2 800
24 950

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-4b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
J

4B-4 4B-3
C3

C3

C3
STAIRS
2 200

4CB-1
4CB-1
4B-3
4B-1

4B-1

4B-1

ROOF

ROOF DECK FRAMING PLAN


1:100 MTS
H
G'
4 300
G

RDB-3

RDB-3
4 200

C3
C3
F

RDB-1

RDB-3

RDB-3
22 750
4 000

PART OF PROPOSED DELTA E.R.


E
250mm STRUCTURAL GAP
4 300

SCALE
B C D

S 4c
4B-2 4B-4 RDB-1 RDB-4

C1

1
C3
C2

C3

C2
STAIRS

RDB-1
3 500

RDB-3
4B-1

4CB-1
4B-3

4B-3

EXISTING COLUMN
C3

C2
C2

C3
C1
A
4B-2 4B-4 RDB-1 RDB-4
6 075 1 500 1 825 3 275 3 050 6 075 2 800
24 950

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-4c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
J

RB-3
C3

C3
RB-3

RB-3

ROOF
C3

C3
H

RB-3
G'

RB-3

RB-3
C3

C3
G
F

PART OF PROPOSED DELTA E.R.


E
B C D

RB-2 RB-4

C1

C3
C2
RB-1

RB-3
RB-3

C3
C2
C1
A

RB-2 RB-4

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-4d
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH

* 12MMØ BOTTOM BAR SPACED @ 200MM B.W. O.C.

GROUND FLOOR SLAB REINFORCEMENT DETAILS


1:100 MTS
J
2 200
H
G'
4 300
G
4 200
F
22 750
4 000
E

250mm STRUCTURAL GAP

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300
B C D
250

* 12MMØ BOTTOM BAR SPACED @ 200MM B.W. O.C.


3 500
A

* 12MMØ BOTTOM BAR SPACED @ 200MM B.W. O.C.

SCALE
5
1
S
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-5
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH

SECOND FLOOR SLAB REINFORCEMENT DETAILS


1:100 MTS
J

C3

STAIRS
2 200
H
G'
4 300
G
4 200
F
22 750
4 000
E

250mm STRUCTURAL GAP

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300
B C D
250

STAIRS
3 500
A

SCALE
S 5a
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-5a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH

THIRD FLOOR SLAB REINFORCEMENT DETAILS


1:100 MTS
J

STAIRS
2 200

ROOF
H
G'
4 300
G
4 200
F
22 750
4 000
E

250mm STRUCTURAL GAP

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300
B C D
250

STAIRS
3 500
A

SCALE
S 5b
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-5b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH

ROOF DECK SLAB REINFORCEMENT DETAILS


J

1:100 MTS
STAIRS
2 200

ROOF
H
G'
4 300
G
4 200
F
22 750
4 000
E

250mm STRUCTURAL GAP

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300
B C D
250

STAIRS
3 500
A

SCALE
S 5c
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-5c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
@ROOF FRAMING LAYOUT)
PURLINS (VERIFY SPACING
10mmØ SAGROD WELDED
ALTERNATELY BETWEEN
X 2.0mm THK. C-PURLINS

16mmØ CROSS BRACING


W/ STD. TURN BUCKLE
SPACED @ 60mm O.C.
50.8x152.4mm (2X6")
J
2 200

ROOF
H
G'
4 300

ROOF 1 FRAMING PLAN


1:100 MTS
G

TRUSS - 1
4 200

4 150

TRUSS - 5

TRUSS - 4
TRUSS - 6

TRUSS - 2
TRUSS - 7

TRUSS - 3
TRUSS - 1
F
22 750

TRUSS - 5

TRUSS - 4
TRUSS - 6

TRUSS - 2
TRUSS - 7

TRUSS - 3
4 000

4 000
13 225
E

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
TRUSS - 5

TRUSS - 4
TRUSS - 6

DESEASE BUILDING
TRUSS - 2
TRUSS - 7

TRUSS - 3
4 125
4 300
B C D

SCALE
TRUSS - 1
250

6
3 500

1
S
A
5 525 3 600 3 172 3 600 5 525
24 500
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-6
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
@ROOF FRAMING LAYOUT)
PURLINS (VERIFY SPACING
10mmØ SAGROD WELDED
ALTERNATELY BETWEEN

X 2.0mm THK. C-PURLINS

16mmØ CROSS BRACING


W/ STD. TURN BUCKLE
SPACED @ 60mm O.C.
50.8x152.4mm (2X6")

11 025
7 525
J

TRUSS - 9

TRUSS - 14

TRUSS - 15
TRUSS - 12
2 200

2 075

ROOF
H

TRUSS - 8
TRUSS - 11

TRUSS - 13

TRUSS - 16

TRUSS - 17
2 188
7 075
G'
4 300

ROOF 2 FRAMING PLAN


1:100 MTS
TRUSS - 8

TRUSS - 11

TRUSS - 13

TRUSS - 16

TRUSS - 17
2 188
G

TRUSS - 8
4 200
F
22 750
4 000
E

(PROPOSED DELTA E.R.)


EXISTING INFECTIOUS
DESEASE BUILDING
4 300

SCALE
B C D
250

S 6a
1
TRUSS - 18

1 550
3 500

3 100
1 550
TRUSS - 18
A
7 300

ALTERNATELY BETWEEN
PURLINS (VERIFY SPACING
10mmØ SAGROD WELDED

@ROOF FRAMING LAYOUT)


SPACED @ 60mm O.C.
X 2.0mm THK. C-PURLINS
50.8x152.4mm (2X6")
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800

10

11

12

13

14
1'
1

2
3

7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.

whether the object for which they are


made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for

ISOLATION ROOMS
AS SHOWN
S-6a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
C D E F
7 750

950 3 000 3 800

7 H J
350

TRUSS - 19
1 375

8 3 000

3 300
50.8x152.4mm (2X6")
X 2.0mm THK. C-PURLINS
1 325
5 000

SPACED @ 60mm O.C.


TRUSS - 19

9 10mmØ SAGROD WELDED


ALTERNATELY BETWEEN F G
PURLINS (VERIFY SPACING
9
1 800

1 700
@ROOF FRAMING LAYOUT)
TRUSS - 22 50.8x152.4mm (2X6")
X 2.0mm THK. C-PURLINS

1 350
TRUSS - 20
SPACED @ 60mm O.C.
5 100
TRUSS - 22 10mmØ SAGROD WELDED
3 900 ALTERNATELY BETWEEN

1 875
PURLINS (VERIFY SPACING
@ROOF FRAMING LAYOUT)

TRUSS - 23

1 875
9 150
1 ROOF 3 FRAMING PLAN TRUSS - 22
50.8x152.4mm (2X6")
S 6b SCALE 1:100 MTS
8
X 2.0mm THK. C-PURLINS

1 875
SPACED @ 60mm O.C.

3 100
10mmØ SAGROD WELDED
ALTERNATELY BETWEEN
PURLINS (VERIFY SPACING
@ROOF FRAMING LAYOUT)

1 875
9
TRUSS - 22 TRUSS - 23

H J
4 350

1 975 1 975

7 10mmØ SAGROD WELDED


ALTERNATELY BETWEEN
4 ROOF 6 FRAMING PLAN
PURLINS (VERIFY SPACING S 6b SCALE 1:50 MTS
@ROOF FRAMING LAYOUT)
50.8x152.4mm (2X6")
X 2.0mm THK. C-PURLINS
SPACED @ 60mm O.C.

8
TRUSS - 21

TRUSS - 21
7 600

3 ROOF 4 FRAMING PLAN


S 6b SCALE 1:100 MTS

2 ROOF 5 FRAMING PLAN


S 6b SCALE 1:50 MTS

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-6b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
200

BEAM NGL 2
1 500 LEVEL

Ø20 TOP &BTM BARS @ 250


16mmØ HORIZONTAL BAR SPA. @ 250mm (STAGGERED)

050
Ø20 TOP &BTM BARS @ 250 3 850 16mmØ VERTICAL BAR SPA. @ 150mm (STAGGERED)

TIES "a"

3 600
D10 @ 100mm

H/4

Y
Ø20 TOP &BTM BARS @ 250
3 450

Ø20 TOP &BTM BARS @ 300 TIES

2 000
NGL 1

1 000
A

H=500MM NOTE: TOP OF RW FTG


H=500MM

LAP SPLICE

B (SEE NOTE)

300
'B' SHALL BE GREATER

TIES "b"
1.32Ld
H/2
OR EQUAL TO 10A OR
CFT-01 CFT-02

H
D10 @ 250mm
300mm WHICHEVER IS 7-16mmØ LONGITUDINAL TOP AND BOTTOM BARS
LONGER
16mmØ TRANSVERSE TOP AND BOTTOM BARS @ 150mm O.C.
50MM LEAN CONCRETE
CRANK DETAIL
1 500

3 850

H/4
RETAINING WALL 1 DETAILS

Y
Ø20 TOP &BTM BARS @ 200
BEAM 3

TIES "a"
LEVEL D10 @ 100mm
S 7 SCALE 1:50 MTR

050
Ø20 TOP &BTM BARS @ 250
2 500

050
VERTICAL BARS

1 500
150
H=500MM

CFT-03 TOP OF
FOOTING

500
16mmØ HORIZONTAL BAR SPA. @ 300mm (STAGGERED)
16mmØ VERTICAL BAR SPA. @ 200mm (STAGGERED)

1 700 50MM LEAN CONCRETE

4 000
1 200
1 700
6-Ø20 BTM BARS EW 5-Ø20 TOP BARS EW
8-Ø20 BTM BARS EW
1 200

1 700

H=350MM NGL

F-02

1 000
H=500MM

F-01 TOP OF RW FTG

250
6-16mmØ LONGITUDINAL TOP AND BOTTOM BARS
16mmØ TRANSVERSE TOP AND BOTTOM BARS @ 200mm O.C.
50MM LEAN CONCRETE 200

1 000

1 FOOTING REINFORCEMENT DETAILS 2 TYPICAL COLUMN DETAILS 4 RETAINING WALL 2 DETAILS


S 7 SCALE 1:50 MTS S 7 SCALE NTS S 7 SCALE 1:50 MTR

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-7
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SECTION REINFORCEMENTS
LEFT SUPPORT MID-SPAN RIGHT SUPPORT 300 300 400 400
BEAM BAR STIRRUPS
MARK WIDTH (B) DEPTH (D) Ø TOP BOTTOM TOP BOTTOM TOP BOTTOM
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)

ROOF BEAM

RB-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250

300

300

300

300
RB-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200
RB-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
RB-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
ROOF DECK

4B-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250


FOUNDATION TO 2ND FLR 2ND FLR TO ROOF DECK FOUNDATION TO 2ND FLR 2ND FLR TO ROOF DECK
4B-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200
4 - Ø20 4 - Ø16 6 - Ø20 6 - Ø16
4B-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
1 SET Ø10 : 2@50, 5@100, REST@200 2 SETS Ø10 : 2@50, 5@100, REST@200
4B-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
RDB-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250
400 400 300
RDB-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
RDB-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
RDB-5 300 400 Ø20 3 3 3 3 3 3 Ø10:1@50, REST @ 200
4B-5 200 300 Ø16 2 2 2 2 2 2 Ø10:1@50, REST @ 200

300

300

300
THIRD FLOOR

3B-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250


3B-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200
3B-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
3B-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
FOUNDATION TO 2ND FLR 2ND FLR TO ROOF DECK FOUNDATION TO 2ND FLR
3B-5 300 400 Ø20 3 3 3 3 3 3 Ø10:1@50, REST @ 200
8 - Ø20 8 - Ø16 4 - Ø20
3CB-1 200 400 Ø16 2 2 2 2 2 2 Ø10:1@50, REST @ 200
3 SETS Ø10 : 2@50, 5@100, REST@200 3 SETS Ø10 : 2@50, 5@100, REST@200
3CB-2 200 400 Ø16 3 3 3 3 3 3 Ø10:1@50, REST @ 200
RDB-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250
RDB-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200
SECOND FLOOR

COLUMN SCHEDULE
2B-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250
2B-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200 2
2B-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
2B-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
S 8 SCALE NTS
2B-5 300 400 Ø20 3 3 3 3 3 3 Ø10:1@50, REST @ 200
2CB-1 200 400 Ø16 2 2 2 2 2 2 Ø10:1@50, REST @ 200
2CB-2 200 400 Ø16 3 3 3 3 3 3 Ø10:1@50, REST @ 200
RB-1 200 400 Ø16 3 3 3 3 3 3 Ø10:1@50, 5@100, REST @ 250
GROUND FLOOR
SHORT CLEAR SPAN "S"

1B-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250


COL COL
STRIP STRIP

BOTTOM BAR REINFORCEMENT


S/4 S/4

MIDDLE
STRIP

S/2

STRIP
COL

L/4
LONG CLEAR SPAN "L"
SHORT SPAN "S"
0.25L1 0.25L1 0.25L2 0.25L2

MIDDLE
TOP BAR SHALL BE

STRIP

L/2
D D D D 1 COL
STRIP
MIDDLE
STRIP
COL
STRIP
EXTENDED W/ RATIO 1 OF 3
-
A B A A B A A S/4 S/2 S/4

STRIP
COL

L/4
2Ø12 TIE BAR
(CONTINUOUS)

TWO-WAY SLAB
D

125mm
BEAM OR WALL
SHORT CLEAR SPAN "S"

COL MIDDLE COL BOTTOM BARS @


L1 L2 L3
STRIP
S/4
STRIP STRIP
S/4 MIDDLE STRIP
S/2 S/5 S/5

TOP BAR REINFORCEMENT


BOTTOM BARS @ COLUMN STRIP BOTTOM BAR SHALL BE
SHALL BE SPACED 4/3 TIMES CUT-OFF W/ RATIO 1 OF 3
THE MIDDLE STRIP @ DISTANCE S/5 FROM THE
FACE SUPPORTING MEMBER

SECTION-1

STRIP
COL

S/4
LONG CLEAR SPAN "L"

MIDDLE
STRIP
1
-

STRIP
BEAM SCHEDULE

COL

S/4
1
S 8 SCALE NTS

3 TYPICAL SLAB DETAILS


S 8 SCALE NTS

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-8
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
24 500

887 887 5 PANELS = 5 525 3 PANELS = 3600 3 PANELS = 3000 3 PANELS = 3 600 5 PANELS = 5 525 1 475

1 105 1 105 1 105 1 105 1 105 1 200 1 200 1 200 1000 1000 1000 1 200 1 200 1 200 1 105 1 105 1 105 1 105 1 105

300

TRUSS 2
2 600

2 433

TRUSS 3

TRUSS 4

TRUSS 5

TRUSS 6
TOP OF LOWER

TRUSS 7
ROOF BEAM

438

300
TRUSS - 1 (4-SET/S)

4 150 (VERIFY)

4 150 (VERIFY)
1 038 1 038 1 038 1 038

1 038 1 038 1 038 1 038


2 433

1 915
TOP OF LOWER TOP OF LOWER
ROOF BEAM ROOF BEAM

TRUSS - 2 (3-SET/S) TRUSS - 3 (3-SET/S)

4 150 (VERIFY)

4 150 (VERIFY)

1 038 1 038 1 038 1 038


1 038 1 038 1 038 1 038
1 577

1 295
TOP OF LOWER TOP OF LOWER
ROOF BEAM ROOF BEAM

TRUSS - 4 (3-SET/S) TRUSS - 5 (3-SET/S)

SCHEDULE B
DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm
A- KING POST
(2 1 2 " x 2 1 2 ") ANGLE BAR

B- VERTICAL DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm A


END MEMBER (2 1 2 " x 2 1 2 ") ANGLE BAR
B D
C- TOP & BOTTOM
CHORD
DOUBLE - 6.35mm (41 ") THK. X 63.5mm
(2 1 2 " x 2 1 2 ") ANGLE BAR
x 63.5mm 1 ROOF TRUSS SECTION AND SCHEDULE
S 9 SCALE VERIFY
D- VERTICAL &
DIAGONAL
SINGLE - 6.35mm (41 ") THK. X 63.5mm
(2 1 2 " x 2 1 2 ") ANGLE BAR
x 63.5mm DIAGRAM
MEMBER
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-9
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
4 150 (VERIFY)

1 038 1 038 1 038 1 038


4 150 (VERIFY)

1 038 1 038 1 038 1 038

TOP OF LOWER TOP OF LOWER

957
ROOF BEAM ROOF BEAM

438
TRUSS - 6 (3-SET/S) TRUSS - 7 (3-SET/S)

11 025
7 500

625 4 EQUALLY SPACED PANELS = 3 775 6 EQUALLY SPACED PANELS = 5 525 875 6 EQUALLY SPACED PANELS = 5 525 1 100

944 944 944 944 921 921 921 921 921 921 1 100 921 921 921 921 921 921
TRUSS 17
300

TRUSS 15
TRUSS 16

300
1 335

TRUSS 13

TRUSS 14
TOP OF LOWER TOP OF LOWER

1 004
924

TRUSS 11

TRUSS 12
ROOF BEAM ROOF BEAM

403

300

300
TRUSS - 8 (3-SET/S) TRUSS - 9 (1-SET/S)

2 188
2 075

1 094 1 094
2 188 2 075 1 038 1 038

1 094 1 094 1 038 1 038

TOP OF LOWER TOP OF LOWER TOP OF LOWER TOP OF LOWER

922

922
ROOF BEAM ROOF BEAM ROOF BEAM ROOF BEAM
403

403

TRUSS - 11 (2-SET/S) TRUSS - 12 (1-SET/S) TRUSS - 13 (2-SET/S) TRUSS - 14 (1-SET/S)

SCHEDULE B
DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm
A- KING POST
(2 1 2 " x 2 1 2 ") ANGLE BAR

B- VERTICAL DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm A


END MEMBER (2 1 2 " x 2 1 2 ") ANGLE BAR
B D
C- TOP & BOTTOM
CHORD
DOUBLE - 6.35mm (41 ") THK. X 63.5mm
(2 1 2 " x 2 1 2 ") ANGLE BAR
x 63.5mm 1 ROOF TRUSS SECTION AND SCHEDULE
S 9a SCALE VERIFY
D- VERTICAL &
DIAGONAL
SINGLE - 6.35mm (41 ") THK. X 63.5mm
(2 1 2 " x 2 1 2 ") ANGLE BAR
x 63.5mm DIAGRAM
MEMBER
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-9a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
2 880
2 188

1 440 1 440
2 075 1 094 1 094

1 038 1 038

300
300

1 335
1 276
TOP OF LOWER TOP OF LOWER TOP OF LOWER

1 035
1 004

704
ROOF BEAM ROOF BEAM ROOF BEAM

TRUSS - 15 (1-SET/S) TRUSS - 16 (2-SET/S) TRUSS - 17 (2-SET/S)

7 300 7 750
3 900
950 950 950 950 950 850 850 850 900 900 900 900 900 900 783 783 783

780 780 780 780 780

TOP OF LOWER TOP OF LOWER TOP OF LOWER

1 028
985

ROOF BEAM ROOF BEAM ROOF BEAM

666
300

300

300
TRUSS - 18 (2-SET/S) TRUSS - 19 (2-SET/S) TRUSS - 20 (1-SET/S)

7 600
5 100
3 000
950 950 950 950 950 950 950 950
850 850 850 850 850 850
750 750 750 750

TOP OF LOWER TOP OF LOWER TOP OF LOWER


1 013

779
ROOF BEAM ROOF BEAM ROOF BEAM

582
300

300

300
TRUSS - 21 (2-SET/S) TRUSS - 22 (6-SET/S) TRUSS - 23 (2-SET/S)

SCHEDULE B
DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm
A- KING POST
(2 1 2 " x 2 1 2 ") ANGLE BAR

B- VERTICAL DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm A


END MEMBER (2 1 2 " x 2 1 2 ") ANGLE BAR
B D
C- TOP & BOTTOM
CHORD
DOUBLE - 6.35mm (41 ") THK. X 63.5mm
(2 1 2 " x 2 1 2 ") ANGLE BAR
x 63.5mm 1 ROOF TRUSS SECTION AND SCHEDULE
S 9b SCALE VERIFY
D- VERTICAL &
DIAGONAL
SINGLE - 6.35mm (41 ") THK. X 63.5mm
(2 1 2 " x 2 1 2 ") ANGLE BAR
x 63.5mm DIAGRAM
MEMBER
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-9b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
5 4 3 2

1 000
3 275 1 825 1 500
ROOF DECK FFL

3 900
4 000
4 600

2 803
∅20 TOP &BTM BARS @ 200

ROOFDECK FFL
ELEV ± 11.70 M
1a THIRD FFL

900 S 10 ∅20 TOP &BTM BARS @ 250

THIRD FCL

3 900
3 900

3 000

SECOND FLL
THIRD FLOOR
ELEV ± 7.80 M
1b

3 800
900

SECOND FCL
S 10

3 900
3 900

3 000

GROUND FFL
SECOND FLOOR
ELEV ± 3.90 M

1 500
900

H=500MM
TOP OF ELEVATOR FOOTING

500
GROUND FCL
BOTTOM OF ELEVATOR FOOTING
3 900

ELEVATOR SHAFT SECTION ELEVATOR FOOTING REINFORCEMENT DETAILS


ROAD LEVEL
ELEV ± 0.00 M
SCALE 1:100 MTR SCALE 1:50 MTR
1 021

BASEMENT FCL

12mmØ SPACED @ 120mm 12mmØ SPACED @ 200mm

16mmØ
3 600
16MM∅ TOP & BTM BARS SPA.
@ 150MM O.C. B.W.
DIA.12mm; SPACED @ 1000mm,
SPACED @ 200MM O.C. HORIZONTAL & VERTICAL
16MM∅ TOP & BTM BARS SPA.
@ 150MM O.C. B.W.
BAR SPACED @ 300MM O.C.

1a BLOW UP SECTION 1

3 500
16mmØ SPACED @ 120mm
S 10 SCALE 1:50 MTR
DIA.12mm; SPACED @ 1000mm,
HORIZONTAL & VERTICAL

16mmØ

16mmØ 150 MM THK SLAB


12mmØ SPACED
@ 200mm

WALL REINFORCEMENT DETAILS ELEVATOR ROOF SLAB REINFORCEMENT DETAILS


1b BLOW UP SECTION 2 SCALE NTS SCALE 1:100 MTR
S 10 SCALE 1:50 MTR

1 STAIRS STRUCTURAL DETAILS 2 ELEVATOR SHAFT DETAILS


S 10 SCALE NTS S 10 SCALE VERIFY

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-10
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
A B A B
1 000
3 475

3 475 375 250 375

5-20mmØ BOTTOM BARS


SPACED EQUALLY EACHWAY

TB
1
C1 C1
1 F1 F1

375
5 350

1 000

250
PART OF PROPOSED DELTA E.R.
5 350

TB

TB
PART OF PROPOSED DELTA E.R.

4-20mmØ TOP BARS

375
SPACED EQUALLY EACHWAY
12mmØ BOTTOM BAR
SPACED @ 300MM B.W. O.C.
ON 125mm THICK SLAB ON FILL
2
F1
PLAN
2 C1 F1 C1
POWER HOUSE
TB
ROOF DECK SLAB
POWER HOUSE
1 FOUNDATION & FLOOR FRAMING PLAN 3 REINFORCEMENT DETAILS
S 11 SCALE 1:50 MTR S 11 SCALE 1:50 MTR

250 250

A B
3 475

350

350
C1 RDB C1

1 000
1 TIE BEAM (TB) ROOF BEAM (RB)

1 250
POWER HOUSE
4 BEAM SCHEDULE
S 11 SCALE 1:10 MTR
RDB

RDB
5 350

PART OF PROPOSED DELTA E.R.

250
250

250

SECTION
1 000 2" THK. LEAN CONCRETE

2 C1 RDB C1

POWER HOUSE POWER HOUSE POWER HOUSE


2 ROOF DECK SLAB BEAM PLAN 5 COLUMN SCHEDULE 6 FOOTING DETAILS
S 11 SCALE 1:50 MTR S 11 SCALE 1:10 MTR S 11 SCALE 1:20 MTR

RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,

AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.


whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
ISOLATION ROOMS
AS SHOWN
S-11
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center