Professional Documents
Culture Documents
E
O V
PROPOSED RENOVATION OF
THREE-STOREY BUILDING FOR
Y -
ISOLATION ROOMS
F L
H
MAIN ENTRANCE
NORTH MAIN EXIT
GATE
I WATER TANK
STORE
G
10 26 STAIR
S
A B 6 J 13
K
OLD PS C E F
BGHMC DRIVE
WAY 27
14 L
1
2 Q
3
R
S
T P
22 19 18
U 23 24 V
W SHED
WATER TANK
IL-AM
TO BRGY. PH
17
OLD BUILDING
WATER TANK
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
HOOK LENGTH
GENERAL NOTES HOOK LENGTH
DIAMETER
REBAR
D D
MATERIAL SPECIFICATIONS
400
HOOK
HOOK
400
400
NOTES ON SPLICES
400
0
CONCRETE MIXING AND PLACEMENT 60
A A'
0
60
HOOK
400
60
0
40 BAR DIAMETER
600mm MINIMUM
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
F2-C4
F2-C4
F2-C4
F2-C4
F2-C4
F-01 C3
RWF 2
2 200
H
F2-C4
F2-C4
F2-C4
F2-C4
F2-C4
EFT-01
G'
4 300
G
RWF 1
RW 1
7 675
4 200
FOUNDATION PLAN
1:100 MTS
CFT-01
F
C3
C3
22 750
4 000
CFT-01
E
C4
C4
250mm STRUCTURAL GAP
4 300
CFT-01
EXISTING STRUCTURE
B C D
C4
C4
SCALE
250
C1
C2
C3
C2
C3
CFT-02
CFT-02
CFT-02
CFT-03
CFT-03
3 500
3
1
S
C3
C2
C3
C2
C1
A
2 000
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-3
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
RW 2
C4
J
C4
C4
C4
C4
C3
2 200
1B-1
1B-1
1B-1
1B-1
1B-1
H
C4
C4
C4
C4
C4
1:100 MTS
GENERATOR
4 300
PROPOSED
G
RW 1
1B-1
1B-1
4 200
F
C3
C3
22 750
4 000
1B-1
1B-1
E
C4
C4
250mm STRUCTURAL GAP
1B-1
1B-1
EXISTING STRUCTURE
B C D
C4
C4
250
C1
C1
C2
C3
C2
C3
3 500
1B-1
1B-1
1B-1
SCALE
C3
C2
C3
C2
C1
C1
1B-1 1B-1 1B-1 1B-1 1B-1
A
4
1
S
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-4
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
RW 2
J
C4
C4
C4
C4
C4
C3
STAIRS
2 200
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
H
C4
C4
C4
C4
C4
RB-1 RB-1 RB-1 RB-1 RB-1
1:100 MTS
SECOND FLOOR FRAMING PLAN
G'
4 300
2B-5
G
2B-3
2B-3
4 200
F
2B-1
C3
C3
22 750
4 000
RB-1
RB-1
E
RB-1
C4
C4
250mm STRUCTURAL GAP
RB-1
RB-1
EXISTING STRUCTURE
B C D
RB-1
C4
C4
250
C1
C1
C3
C2
C3
C2
STAIRS
3 500
2B-1
2B-1
2CB-2
2B-3
2B-3
2B-3
SCALE
C3
C2
C2
C3
C1
C1
A
S 4a
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-4a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
S 5b
3
J
3B-4
C3
STAIRS
3B-1
3B-3
ROOF
H
G'
4 300
S 5b
2
3B-5
G
3B-3
3B-3
4 200
C3
C3
F
3B-3
22 750
4 000
C3
C3
C3
C3
250mm STRUCTURAL GAP
4 300
SCALE
B C D
S 4b
RDB-2 3B-2 3B-4 3B-1 3B-4
C1
C1
1
C3
C2
C3
C2
STAIRS
RDB-1
3 500
3B-1
3B-1
3CB-2
3B-3
3B-3
3B-3
S 5b
1
C3
C2
C2
C3
C1
C1
EXISTING COLUMN
A
RDB-2 3B-2 3B-4 3B-1 3B-4
6 075 1 500 1 825 3 275 3 050 6 075 2 800
24 950
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-4b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
J
4B-4 4B-3
C3
C3
C3
STAIRS
2 200
4CB-1
4CB-1
4B-3
4B-1
4B-1
4B-1
ROOF
RDB-3
RDB-3
4 200
C3
C3
F
RDB-1
RDB-3
RDB-3
22 750
4 000
SCALE
B C D
S 4c
4B-2 4B-4 RDB-1 RDB-4
C1
1
C3
C2
C3
C2
STAIRS
RDB-1
3 500
RDB-3
4B-1
4CB-1
4B-3
4B-3
EXISTING COLUMN
C3
C2
C2
C3
C1
A
4B-2 4B-4 RDB-1 RDB-4
6 075 1 500 1 825 3 275 3 050 6 075 2 800
24 950
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-4c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
J
RB-3
C3
C3
RB-3
RB-3
ROOF
C3
C3
H
RB-3
G'
RB-3
RB-3
C3
C3
G
F
RB-2 RB-4
C1
C3
C2
RB-1
RB-3
RB-3
C3
C2
C1
A
RB-2 RB-4
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-4d
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
SCALE
5
1
S
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-5
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
C3
STAIRS
2 200
H
G'
4 300
G
4 200
F
22 750
4 000
E
STAIRS
3 500
A
SCALE
S 5a
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-5a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
STAIRS
2 200
ROOF
H
G'
4 300
G
4 200
F
22 750
4 000
E
STAIRS
3 500
A
SCALE
S 5b
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-5b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
1:100 MTS
STAIRS
2 200
ROOF
H
G'
4 300
G
4 200
F
22 750
4 000
E
STAIRS
3 500
A
SCALE
S 5c
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-5c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
@ROOF FRAMING LAYOUT)
PURLINS (VERIFY SPACING
10mmØ SAGROD WELDED
ALTERNATELY BETWEEN
X 2.0mm THK. C-PURLINS
ROOF
H
G'
4 300
TRUSS - 1
4 200
4 150
TRUSS - 5
TRUSS - 4
TRUSS - 6
TRUSS - 2
TRUSS - 7
TRUSS - 3
TRUSS - 1
F
22 750
TRUSS - 5
TRUSS - 4
TRUSS - 6
TRUSS - 2
TRUSS - 7
TRUSS - 3
4 000
4 000
13 225
E
TRUSS - 4
TRUSS - 6
DESEASE BUILDING
TRUSS - 2
TRUSS - 7
TRUSS - 3
4 125
4 300
B C D
SCALE
TRUSS - 1
250
6
3 500
1
S
A
5 525 3 600 3 172 3 600 5 525
24 500
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-6
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
@ROOF FRAMING LAYOUT)
PURLINS (VERIFY SPACING
10mmØ SAGROD WELDED
ALTERNATELY BETWEEN
11 025
7 525
J
TRUSS - 9
TRUSS - 14
TRUSS - 15
TRUSS - 12
2 200
2 075
ROOF
H
TRUSS - 8
TRUSS - 11
TRUSS - 13
TRUSS - 16
TRUSS - 17
2 188
7 075
G'
4 300
TRUSS - 11
TRUSS - 13
TRUSS - 16
TRUSS - 17
2 188
G
TRUSS - 8
4 200
F
22 750
4 000
E
SCALE
B C D
250
S 6a
1
TRUSS - 18
1 550
3 500
3 100
1 550
TRUSS - 18
A
7 300
ALTERNATELY BETWEEN
PURLINS (VERIFY SPACING
10mmØ SAGROD WELDED
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
AND MEDICAL CENTER JOSELITO F. BUHANGIN, PhD.
ISOLATION ROOMS
AS SHOWN
S-6a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA RAY P. SUANDING, MD, FPCP, FPCCP RECARDO B. RUNEZ, MD, FPCS, MHA, CSEE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Supervising Administrative Officer Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center OIC - Chief Administrative Officer, HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
C D E F
7 750
7 H J
350
TRUSS - 19
1 375
8 3 000
3 300
50.8x152.4mm (2X6")
X 2.0mm THK. C-PURLINS
1 325
5 000
1 700
@ROOF FRAMING LAYOUT)
TRUSS - 22 50.8x152.4mm (2X6")
X 2.0mm THK. C-PURLINS
1 350
TRUSS - 20
SPACED @ 60mm O.C.
5 100
TRUSS - 22 10mmØ SAGROD WELDED
3 900 ALTERNATELY BETWEEN
1 875
PURLINS (VERIFY SPACING
@ROOF FRAMING LAYOUT)
TRUSS - 23
1 875
9 150
1 ROOF 3 FRAMING PLAN TRUSS - 22
50.8x152.4mm (2X6")
S 6b SCALE 1:100 MTS
8
X 2.0mm THK. C-PURLINS
1 875
SPACED @ 60mm O.C.
3 100
10mmØ SAGROD WELDED
ALTERNATELY BETWEEN
PURLINS (VERIFY SPACING
@ROOF FRAMING LAYOUT)
1 875
9
TRUSS - 22 TRUSS - 23
H J
4 350
1 975 1 975
8
TRUSS - 21
TRUSS - 21
7 600
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
BEAM NGL 2
1 500 LEVEL
050
Ø20 TOP &BTM BARS @ 250 3 850 16mmØ VERTICAL BAR SPA. @ 150mm (STAGGERED)
TIES "a"
3 600
D10 @ 100mm
H/4
Y
Ø20 TOP &BTM BARS @ 250
3 450
2 000
NGL 1
1 000
A
LAP SPLICE
B (SEE NOTE)
300
'B' SHALL BE GREATER
TIES "b"
1.32Ld
H/2
OR EQUAL TO 10A OR
CFT-01 CFT-02
H
D10 @ 250mm
300mm WHICHEVER IS 7-16mmØ LONGITUDINAL TOP AND BOTTOM BARS
LONGER
16mmØ TRANSVERSE TOP AND BOTTOM BARS @ 150mm O.C.
50MM LEAN CONCRETE
CRANK DETAIL
1 500
3 850
H/4
RETAINING WALL 1 DETAILS
Y
Ø20 TOP &BTM BARS @ 200
BEAM 3
TIES "a"
LEVEL D10 @ 100mm
S 7 SCALE 1:50 MTR
050
Ø20 TOP &BTM BARS @ 250
2 500
050
VERTICAL BARS
1 500
150
H=500MM
CFT-03 TOP OF
FOOTING
500
16mmØ HORIZONTAL BAR SPA. @ 300mm (STAGGERED)
16mmØ VERTICAL BAR SPA. @ 200mm (STAGGERED)
4 000
1 200
1 700
6-Ø20 BTM BARS EW 5-Ø20 TOP BARS EW
8-Ø20 BTM BARS EW
1 200
1 700
H=350MM NGL
F-02
1 000
H=500MM
250
6-16mmØ LONGITUDINAL TOP AND BOTTOM BARS
16mmØ TRANSVERSE TOP AND BOTTOM BARS @ 200mm O.C.
50MM LEAN CONCRETE 200
1 000
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
ROOF BEAM
300
300
300
300
RB-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200
RB-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
RB-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
ROOF DECK
300
300
300
THIRD FLOOR
COLUMN SCHEDULE
2B-1 250 400 Ø20 4 2 2 4 4 2 Ø10:1@50, 5@100, REST @ 250
2B-2 250 400 Ø20 2 2 2 2 2 2 Ø10:1@50, REST @ 200 2
2B-3 250 400 Ø20 5 3 3 5 5 3 Ø10:1@50, 5@100, REST @ 250
2B-4 250 400 Ø20 6 3 3 6 6 3 Ø10:1@50, 5@100, REST @ 250
S 8 SCALE NTS
2B-5 300 400 Ø20 3 3 3 3 3 3 Ø10:1@50, REST @ 200
2CB-1 200 400 Ø16 2 2 2 2 2 2 Ø10:1@50, REST @ 200
2CB-2 200 400 Ø16 3 3 3 3 3 3 Ø10:1@50, REST @ 200
RB-1 200 400 Ø16 3 3 3 3 3 3 Ø10:1@50, 5@100, REST @ 250
GROUND FLOOR
SHORT CLEAR SPAN "S"
MIDDLE
STRIP
S/2
STRIP
COL
L/4
LONG CLEAR SPAN "L"
SHORT SPAN "S"
0.25L1 0.25L1 0.25L2 0.25L2
MIDDLE
TOP BAR SHALL BE
STRIP
L/2
D D D D 1 COL
STRIP
MIDDLE
STRIP
COL
STRIP
EXTENDED W/ RATIO 1 OF 3
-
A B A A B A A S/4 S/2 S/4
STRIP
COL
L/4
2Ø12 TIE BAR
(CONTINUOUS)
TWO-WAY SLAB
D
125mm
BEAM OR WALL
SHORT CLEAR SPAN "S"
SECTION-1
STRIP
COL
S/4
LONG CLEAR SPAN "L"
MIDDLE
STRIP
1
-
STRIP
BEAM SCHEDULE
COL
S/4
1
S 8 SCALE NTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
887 887 5 PANELS = 5 525 3 PANELS = 3600 3 PANELS = 3000 3 PANELS = 3 600 5 PANELS = 5 525 1 475
1 105 1 105 1 105 1 105 1 105 1 200 1 200 1 200 1000 1000 1000 1 200 1 200 1 200 1 105 1 105 1 105 1 105 1 105
300
TRUSS 2
2 600
2 433
TRUSS 3
TRUSS 4
TRUSS 5
TRUSS 6
TOP OF LOWER
TRUSS 7
ROOF BEAM
438
300
TRUSS - 1 (4-SET/S)
4 150 (VERIFY)
4 150 (VERIFY)
1 038 1 038 1 038 1 038
1 915
TOP OF LOWER TOP OF LOWER
ROOF BEAM ROOF BEAM
4 150 (VERIFY)
4 150 (VERIFY)
1 295
TOP OF LOWER TOP OF LOWER
ROOF BEAM ROOF BEAM
SCHEDULE B
DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm
A- KING POST
(2 1 2 " x 2 1 2 ") ANGLE BAR
957
ROOF BEAM ROOF BEAM
438
TRUSS - 6 (3-SET/S) TRUSS - 7 (3-SET/S)
11 025
7 500
625 4 EQUALLY SPACED PANELS = 3 775 6 EQUALLY SPACED PANELS = 5 525 875 6 EQUALLY SPACED PANELS = 5 525 1 100
944 944 944 944 921 921 921 921 921 921 1 100 921 921 921 921 921 921
TRUSS 17
300
TRUSS 15
TRUSS 16
300
1 335
TRUSS 13
TRUSS 14
TOP OF LOWER TOP OF LOWER
1 004
924
TRUSS 11
TRUSS 12
ROOF BEAM ROOF BEAM
403
300
300
TRUSS - 8 (3-SET/S) TRUSS - 9 (1-SET/S)
2 188
2 075
1 094 1 094
2 188 2 075 1 038 1 038
922
922
ROOF BEAM ROOF BEAM ROOF BEAM ROOF BEAM
403
403
SCHEDULE B
DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm
A- KING POST
(2 1 2 " x 2 1 2 ") ANGLE BAR
1 440 1 440
2 075 1 094 1 094
1 038 1 038
300
300
1 335
1 276
TOP OF LOWER TOP OF LOWER TOP OF LOWER
1 035
1 004
704
ROOF BEAM ROOF BEAM ROOF BEAM
7 300 7 750
3 900
950 950 950 950 950 850 850 850 900 900 900 900 900 900 783 783 783
1 028
985
666
300
300
300
TRUSS - 18 (2-SET/S) TRUSS - 19 (2-SET/S) TRUSS - 20 (1-SET/S)
7 600
5 100
3 000
950 950 950 950 950 950 950 950
850 850 850 850 850 850
750 750 750 750
779
ROOF BEAM ROOF BEAM ROOF BEAM
582
300
300
300
TRUSS - 21 (2-SET/S) TRUSS - 22 (6-SET/S) TRUSS - 23 (2-SET/S)
SCHEDULE B
DOUBLE - 6.35mm (41 ") THK. X 63.5mm x 63.5mm
A- KING POST
(2 1 2 " x 2 1 2 ") ANGLE BAR
1 000
3 275 1 825 1 500
ROOF DECK FFL
3 900
4 000
4 600
2 803
∅20 TOP &BTM BARS @ 200
ROOFDECK FFL
ELEV ± 11.70 M
1a THIRD FFL
THIRD FCL
3 900
3 900
3 000
SECOND FLL
THIRD FLOOR
ELEV ± 7.80 M
1b
3 800
900
SECOND FCL
S 10
3 900
3 900
3 000
GROUND FFL
SECOND FLOOR
ELEV ± 3.90 M
1 500
900
H=500MM
TOP OF ELEVATOR FOOTING
500
GROUND FCL
BOTTOM OF ELEVATOR FOOTING
3 900
BASEMENT FCL
16mmØ
3 600
16MM∅ TOP & BTM BARS SPA.
@ 150MM O.C. B.W.
DIA.12mm; SPACED @ 1000mm,
SPACED @ 200MM O.C. HORIZONTAL & VERTICAL
16MM∅ TOP & BTM BARS SPA.
@ 150MM O.C. B.W.
BAR SPACED @ 300MM O.C.
1a BLOW UP SECTION 1
3 500
16mmØ SPACED @ 120mm
S 10 SCALE 1:50 MTR
DIA.12mm; SPACED @ 1000mm,
HORIZONTAL & VERTICAL
16mmØ
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,
TB
1
C1 C1
1 F1 F1
375
5 350
1 000
250
PART OF PROPOSED DELTA E.R.
5 350
TB
TB
PART OF PROPOSED DELTA E.R.
375
SPACED EQUALLY EACHWAY
12mmØ BOTTOM BAR
SPACED @ 300MM B.W. O.C.
ON 125mm THICK SLAB ON FILL
2
F1
PLAN
2 C1 F1 C1
POWER HOUSE
TB
ROOF DECK SLAB
POWER HOUSE
1 FOUNDATION & FLOOR FRAMING PLAN 3 REINFORCEMENT DETAILS
S 11 SCALE 1:50 MTR S 11 SCALE 1:50 MTR
250 250
A B
3 475
350
350
C1 RDB C1
1 000
1 TIE BEAM (TB) ROOF BEAM (RB)
1 250
POWER HOUSE
4 BEAM SCHEDULE
S 11 SCALE 1:10 MTR
RDB
RDB
5 350
250
250
250
SECTION
1 000 2" THK. LEAN CONCRETE
2 C1 RDB C1
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES STRUCTURAL ENGINEER Drawings and specifications and PROJECT TITLE SHEET CONTENTS NOTED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
PROPOSED RENOVATION OF BGHMC THREE-STOREY BUILDING FOR
BAGUIO GENERAL HOSPITAL and documents of the architect,