Matiur Rahman

MEASUREMENT SHEET
Site Address : Khar west PAGE NO 1
Measurement for shuttering work and concreting work DATE : 11/7/2022
Shuttering work
Sr. No. Description Nos. Length Breadth Qty. in sft
1 Left Side wall 1 13.67 9.75 133.283
2 Front wall outside 1 10.00 11.00 110.000
3 Less door -1 3.50 7.00 -24.500
4 front wall inside 1 9.25 11.00 101.750
5 Less door -1 3.50 7.00 -24.500
6 Door bottom 1 3.50 0.67 2.345
7 Door jambs 2 7.00 0.25 3.500
Total Qty. in sqft 301.878

Concreting work
Sr. No. Description Nos. Length Breadth Qty. in sft
1 Left Side wall 1 13.67 9.75 133.283
2 Front wall outside 1 10.00 11.00 110.000
3 Less door -1 3.50 7.00 -24.500
Total Qty. in sqft 218.783
Matiur Rahman
MEASUREMENT SHEET
Site Address : Khar west
Measurement for Reinforcement work work
No. of Cutting Number Diameter of the bars in mm
Sr. No. Description Dia
member length of bar 8 10 12
1 P1 vertical 12 1 3.1 52 161.20
P1 vertical Lapping 12 1 0.5 52 26.00
P1 vertical Extra 12 1 0.7 26 18.20
P1 Horizental 12 1 4.5 48 216.00
P1 Horizental Lapping 12 1 0.6 48 28.80
P2 vertical 12 1 3.7 26 96.20
P2 vertical Lapping 12 1 0.5 26 13.00
P2 Horizental 12 1 1.1 48 52.80
P2 Horizental 12 1 1.1 17 18.70
P2 Horizental Lapping 12 1 0.5 32 16.00
Total in RMT 646.90
Weight in kg per Rmt 0.89
Total Weight in kg 575.02
PAGE NO 2s
DATE : 11/7/2022
of the bars in mm
Remark
16
Matiur Rahman
MEASUREMENT SHEET
Site Address : Khar west PAGE NO 3
Departmental labour supply DATE : 11/7/2022
Sr. No. Description Fitter/car Labour Remark
1 3 labour for breaking of wall 3.00
2 3 labour for existing steel removing 3.00
3 fitter for steel binding and removing 8.00
4 carpenter for making charge 2.00
Total 10 6

MEASUREMENT SHEET
Site Address : Khar west PAGE NO 3
Hilti rebar DATE : 11/7/2022
Sr. No. Description No of bars Remark
1 16 mm P1 top 90.00
2 P1 column 48.00
3 Top to Bottom P2 48.00
4 P2 column 60.00
Total 246.00
Matiur Rahman
Civil contractor