‫ﻧﻮﺗﺔ ﺣﺴﺎﺑﻴﺔ‬

‫ﻣﺷروع ‪:‬‬

‫اﻟﻣﺎﻟك ‪:‬‬

‫اﻟﻌﻧوان ‪:‬‬

‫اﻋداد ‪ :‬اﻟﻣﻛﺗب اﻟﮭﻧدﺳﻲ ﻟﻠﺗﺻﻣﯾﻣﺎت واﻻﺳﺗﺷﺎرات اﻟﮭﻧدﺳﯾﺔ ‪.‬‬


Assumption

L.L = 200 kg/m2


F.C = 150 kg/m2

Qall = 120 KN/M2

Fy = 360 N/mm2
Fcu = 25 N/mm2
Design by using SAP And C.D.P.
Loads of columns (ultimate) for one floor

Design of columns
Maximum load =212ton .…. section (30*70)
Pu * 1000 = 0.35 * fcu * Ac + 0.67 * Fy * As
212 *1000 = 0.35*250*Ac + 0.67 *3600* Ac/100
Ac =1900cm2<Ac= 30*70=2100cm2

Safe
‫ﺳﻘف اﻻرﺿﻰ و اﻟﻣﺗﻛرر‬
SOLID SLAB
For (ultimate moment )
M1-1

B = 100 cm
t = 12 cm
cover = 2 cm
Max moment on slab in direction X :
M(x-x)max = 1 t.m
Use As = 5Ø 10 / m
M(x-x)max = 1 t.m<Mcapacity = 1.13t.m
Safe
M2-2

B = 100 cm
t = 12 cm
cover = 2 cm
Max moment on slab in direction Y :
M(y-y)max = 0.9t.m
As = 5Ø 10 / m
M(y-y)max= 0.9t.m<Mcapacity = 1.13t.m

Safe
FLAT SLAB
For (ultimate moment )
M1-1 lower

B = 100 cm
t = 22 cm
cover = 2 cm
Max moment on slab in direction X :
M(x-x)max = 4.5 t.m
Use As = 7Ø 12 / m
M(x-x)max = 3 t.m<Mcapacity = 4.5t.m

Safe
M2-2lower

B = 100 cm
t = 22 cm
cover = 2 cm
Max moment on slab in direction Y :
M(y-y)max = 3.2t.m
As = 7Ø 12 / m
M(y-y)max= 3t.m<Mcapacity = 4.5t.m

Safe

M11 upper

B = 100 cm
t = 22 cm
cover = 2 cm
Max moment on slab in direction X :
M(x-x)max = -5.3 t.m
Use As = 7Ø 12 / m
‫ﺗم اﺿﺎﻓﺔ ﻧﺻف ﺷﺑﻛﺔ ﻋﻠوﯾﺔ ﻟﻣﻘﺎوﻣﺔ اﻟزﯾﺎدة ﻓﻰ اﻟﻌزم‬
M(x-x)max = -5.3 t.m<Mcapacity =- 6.6t.m

Safe
M22 upper

B = 100 cm
t = 22 cm
cover = 2 cm
Max moment on slab in direction Y :
M(y-y)max = -4t.m
As = 7Ø 12 / m
M(y-y)max= -4t.m<Mcapacity = -4.5t.m

Deflecationmax = 0.004 m <Allowable S/250=0.0158 m

Safe deflecation.
Safe shear.

Safe shear punching.

Design of beams

Maximum moment on beams :


Maximum moment upper = - 6t.m for all sec (3‫ ))ك‬on Beam
Beam3
Maximum moment lower = + 9t.m for all sec (3‫ ))ك‬on beam
beam3
Maximum moment upper = - 6t.m for all sec (2‫ ))ك‬on Beam
Beam2
Maximum moment lower = + 7t.m for all sec (2‫ )ك‬on beam2
Maximum moment upper = - 1.5t.m for all sec (1‫ )ك‬on Beam2
Maximum moment lower = + 1.5t.m for all sec (1‫ )ك‬on beam2

Sec (3‫)ك‬

Beam 12*70 with R.F.T =


Mult(max) upper and Mult(min) lower for all beam sec(‫ك‬3)
<Mcapacitylower = 14.5t.m and Mcapacityupper = 14.5t.m
Sec (2‫)ك‬

Beam 12*70 with R.F.T =


Mult(max) upper and Mult(min) lower for all beam sec(2‫)ك‬
<Mcapacitylower = 9.7t.m and Mcapacityupper = 9.7t.m
Sec (‫ك‬1)
Beam 12*70 with R.F.T =
Mult(max) upper and Mult(min) lower for all beam sec(‫ك‬1)
<Mcapacitylower
lower = 2.5t.m and Mcapacityupper
upper = 2.5t.m

Safe all beam

(Ultimate shear)for
for sec 25*70
Qu = 10 t (Maximum shear on beams)
qu= (10*1000) / (25*65) = 6.08 kg/cm2 = 0.6108 t/m2
qcu = 0.98 t/m2
qmax= 2.86 t/m2
use stirrups 5Ø8@20cm

Design of footing
(‫ق‬1)
All footing (‫ق‬1) is safe

(‫ق‬2)
All footing (‫ق‬2) is safe
(‫ق‬3)
All footing (‫ق‬3) is safe
Combined footing 4‫ق‬
* Design of Strap beam
1‫ش‬
Design strap beam
Stairs