Professional Documents
Culture Documents
Workshop
Airplane Maintenance
Aleem Wali – Marketing Director
March 2023
Proprietary: The information contained herein is proprietary to The Boeing Company and shall not be
reproduced or disclosed in whole or in part except when such user possesses direct written
authorization from The Boeing Company.
The statements contained herein are based on good faith assumptions are to be used for general information
purposes only. These statements do not constitute an offer, promise, warranty or guarantee of performance.
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airline Economics
Profits
EQUALS
MINUS
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airline Economics
Profits
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Today’s key topics
10% 4%
17%
3%
2%
10%
9%
3%
4% 737-800W 777-300ER
162 seats
47% 396 seats
10% 1,000 nm 6,000 nm 58%
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airplane Station
& Ground Power
OPERATING
Airplane
COST
BREAKDOWN design
Crew Size impacts
Aerodynamics
Systems
operating
Weight
Fuel cost
Materials
Propulsion
Weight-
based Fees
Maintenance
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
Utilization profile #1
Utilization profile #2
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Design of airline operation impacts costs
Comparison of Airplane-Related Operating Cost
Airlines based in Europe
9
7
AROC (€cents per km)
7
AROC (€cents per km)
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
A: 10%
Engine 61% B: 20%
• Repair and overhaul of the engine C: 40%
• Quick Engine Change components D: 60%
• Life limited parts
Airframe
• MPD mandated inspections
39%
• LRU replacement and repair
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
On-airplane: Base
Off-airplane • Scheduled major inspections and
• Expenditures on parts removed and resulting non-routines
repaired off-airplane
• Requires hanger input
• Select components have discrete
intervals and event costs
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airplane age impacts maintenance costs
Non-routine findings increase with age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Summary airframe aging curve
Airframe Maintenance Cost
Higher Utilization
Allocated cost per trip
Lower Utilization
Years in service
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
Major (C) check intervals escalated Heavy (D) check interval escalated to
from 24 months to 36 months 9 years
C C C C C C C C C C C C
737-9
D D D
C C C C C
C C C
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Airplane age
Systems-driven check
Year 10 tasks: integrated with
year 9 check
Full internal structural inspection
Maintenance benefits of
composites:
Lightweight
No corrosion
Less fatigue
Fewer fasteners
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Getting more from fewer parts
737NG
Replaced
Relocated
Revised
737 MAX
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing leverages continuous, stepwise innovation
1980 1985 1990 1995 2000 2005 2010 2015 2020
Narrowbody Laminar
Performance Flow
Engine 61%
• Repair and overhaul of the engine
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
Workshop 2023
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Engine maintenance
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
“Off-wing” represents the vast majority of engine maintenance cost
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
EGT Redline
Deteriorated engine
Margin
Removal for
EGT Redline EGT Redline Shop Visit
Deteriorated engine
EGT Redline
CFM56-27E rating
Derate
EGT Redline
Less avg.
derate
More avg.
derate
Engine derate
EGT
• Difference between rated thrust & thrust used
Time on wing
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
Environment
EGT Redline
Harsh environment
EGT
Time on wing
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
Environment
EGT Redline
Harsh environment
with water wash
Time on wing
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Boeing Airline Planning
Climb
Flight Initial LLP
Length Replacement*
350 NM
Cruise
~ 2,700 trips/year 7 years
~ 1 Hour Avg Mission
EGT
Takeoff
800 NM
~1,800 trips/year 10 years
~ 2 Hour Avg Mission
1,250 NM
~1,300 trips/year 14 years
~ 3 Hour Avg Mission
Start/Taxi
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Rate Per Flight Hour programs can simplify maintenance Boeing Airline Planning
Engine OEM Rate Per Flight Hour (RPFH) offerings also include additional services
Lifecycle time
Additional services
and material
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Capital expenditures to support new or incremental fleet introduction
Fleet attributes
• Fleet size
• Airplane reliability
• Minimum Equipment List (MEL) relief
• Risk tolerance
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
What impacts spares and tooling costs? Tolerance for operational impact
Fleet attributes
ESS 3 Parts
• Fleet size
• Airplane reliability
Cost
• Minimum Equipment List (MEL) relief ESS 2 Parts
• Risk tolerance
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
What impacts spares and tooling costs? Network considerations
Multi-hub
Fleet attributes
• Fleet size
• Airplane reliability
• Minimum Equipment List (MEL) relief
• Risk tolerance
Maintenance strategy
• In-house vs. outsourced maintenance
• Engine/Component programs
• Spares turn time Mega-hub
• Tolerance for operational impact
• Minimum RSPL
Network considerations
• Utilization
• Proximity to spares pool(s)
• Operational environment
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Commonality can reduce provisioning costs
Airplane with no
commonality S
A
V
Airplane with partial I
Initial provisioning, $
commonality N
G
S
Fleet size
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Summary: predicting costs
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
S t r e t c h
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Today’s key topics
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airline departments may analyze costs differently
Allocation spreads maintenance costs across the years covered by a specific event
D Check cost allocation example
Allocated
Annual cost
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airline departments may analyze costs differently
Allocation spreads maintenance costs across the years covered by a specific event
D Check cost allocation example
Allocated
Costs are allocated for events that occur
Annual cost
Study period
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airline departments may analyze costs differently
Allocated costs gradually increase as airplane ages
Airframe maintenance costs
Line
A Check
C Check
D Check
Brakes
Wheels, Tires
Landing Gear
APU Allocated
Other Components
Annual cost
Potential users
• Accounting
• Lessor
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Airline departments may analyze costs differently
Lifecycle cost provides a single summary value
Airframe maintenance costs
Line
A Check
C Check
D Check
Brakes
Wheels, Tires Average Lifecycle cost
Landing Gear
• $ per Year
APU
• $ per Flight Hour
Other Components
Annual cost
• $ per Trip
Study period
Lifecycle
Potential users
• Network Planner
• Airplane
Aircraft age Evaluator
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Maintenance Economics: Allocate the 12-year D-Checks
Allocated
Annual cost
$1.22M 1.32M
$102K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Maintenance Economics: Allocate the 12-year D-Checks
Allocated
Annual cost
$1.22M 1.32M
$102K $111K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Maintenance Economics: Allocate the 12-year D-Checks
$102K $111K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Maintenance Economics: Allocate the 12-year D-Checks
$102K $111K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Maintenance Economics: Allocate the 12-year D-Checks
$102K $111K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Aircraft age
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
LIFE CYCLE AVERAGE
COST PER TRIP
LIFE CYCLE AVERAGE
COST PER SEAT
PER AIRCRAFT
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
How Boeing analyzes operating cost
MARKET
D ATA
SOURCES
Copyright © 2023 Boeing. All rights reserved. | BOEING PROPRIETARY | APW-Dubai | March 2023
Summary: cost analysis