56 HARGA
Kayu SATUAN
Papan Kelas BAHAN
III m³ 2.800.000,00 100,00%
57 Kayu Balok Kelas III m³ 2.800.000,00 100,00%
58 Minyak Begesting ltr 55.000,00 100,00%
59 Kaca Polos 6 mm m² 140.000,00 55,69% Asahimas https://tkdn.kemenperin.go.id/sertifikat.php?id=tM3H
60 Kaca Polos 8 mm m² 202.500,00 55,69% Asahimas https://tkdn.kemenperin.go.id/sertifikat.php?id=tM3H
61 Engsel Pintu Sliding Unit 415.000,00 25,18%
62 Engsel Casement bh 83.500,00 25,18%
63 Engsel pintu 5" bh 65.000,00 25,06%
64 Grendel Pintu bh 65.000,00 25,06%
65 Grendel Tanam 30 cm bh 146.000,00 25,06%
66 Grendel Jendela Model Rambuncis bh 45.000,00 25,06%
67 Kunci Pintu Set 355.000,00 37,23% solid https://tkdn.kemenperin.go.id/sertifikat.php?id=zuZq
68 Pull Handle Stainless bh 195.000,00
69 Handle Tanam 4" bh 144.500,00 38,25% solid
70 Air ltr 450,00 100,00% lokal
71 Pipa PVC Type D f 4" m¹ 99.500,00 89,84% Rucika https://tkdn.kemenperin.go.id/sertifikat.php?id=nP8f
72 Pipa PVC D f 5" m¹ 215.500,00 89,84% Rucika
73 Buis Beton U-20 m¹ 65.000,00 38,00% lawang indah
74 Roof Drain bh 185.000,00 47,98%
75 TL 2X18 WATT RMI (TL LED) bh 565.000,00 43,18% saka https://tkdn.kemenperin.go.id/sertifikat.php?id=gR8h
76 LAMPU DOWN LIGHT INBOUW 5" LED BULP 5 bh WATT 245.000,00 26,44% philips
77 Kabel NYM 2x2,5 mm2 M' 17.250,00 94,33% eterna https://tkdn.kemenperin.go.id/sertifikat.php?id=xTNU
78 Kabel NYM 3x2,5 mm2 M' 20.500,00 94,33% eterna https://tkdn.kemenperin.go.id/sertifikat.php?id=xTNU
79 Kabel NYY 4x10 mm2 M' 95.000,00 94,33% eterna https://tkdn.kemenperin.go.id/sertifikat.php?id=xTNU
80 Box MCB Isi 3 Bh 70.000,00 sneider
81 MCB 10kA 1P 10A Bh 140.000,00 sneider
82 Pipa PVC 5/8" bh 5.500,00 38,00% clipsal
83 Inbouw doos bh 1.300,00 38,00% clipsal
84 Tee doos bh 2.000,00 38,00%
85 Smoke Detector (Type Photo Electric) bh 462.700,00 60,23% HOOSEKI
86 Heat Detektor (Type Rate Of Rise, c/w LED) bh 445.200,00 34,95% HOOSEKI
87 Alarm Bell bh 387.000,00 38,07% HOOSEKI
88 Indikator Light bh 264.000,00 38,07% HOOSEKI
89 Instalasi Detector bh 385.000,00 38,07% HOOSEKI
90 Terminal Box Fire Alarm, 12 Pair 0.8 mm bh 325.000,00 44,22% HOOSEKI
91 Main Central Fire Alarm, 4 Zone bh 3.850.000,00 10,28% HOOSEKI
92 Manual CallPoint (Break Glass) bh 364.000,00 34,95% HOOSEKI
93 Fire Extingusher Carbon Dioxide Berat isi 3,5 kg bh 520.000,00 30,67% FE Blitzshield
94 Pasang Stop Kontak Dinding Inbouw bh 37.000,00 33,13% Panasonik
95 Pasang Stop Kontak AC (Dengan Tombol On/Off) Inbouwbh 125.000,00 33,13% Panasonik
96 Pasang Saklar Tunggal bh 32.500,00 33,13% Panasonik
97 Pasang Saklar Ganda bh 41.000,00 33,13% Panasonik
II HARGA SATUAN UPAH KERJA
1 Pekerja Org/Hr 122.000,00 100%
2 Tukang batu Org/Hr 135.000,00 100%
3 Tukang kayu Org/Hr 135.000,00 100%
4 Tukang besi Org/Hr 135.000,00 100%
5 Tukang cat Org/Hr 135.000,00 100%
6 Tukang politur Org/Hr 135.000,00 100%
7 Tukang listrik Org/Hr 135.000,00 100%
8 Tukang Las Org/Hr 135.000,00 100%
9 Tukang gali Org/Hr 135.000,00 100%
10 Tukang pipa Org/Hr 135.000,00 100%
11 Kepala tukang batu Org/Hr 140.000,00 100%
12 Kepala tukang kayu Org/Hr 140.000,00 100%
13 Kepala tukang besi Org/Hr 140.000,00 100%
14 Kepala tukang cat Org/Hr 140.000,00 100%
15 Kepala tukang politur Org/Hr 140.000,00 100%
16 Kepala tukang listrik Org/Hr 140.000,00 100%
17 Kepala tukang Las Org/Hr 140.000,00 100%
18 Kepala Tukang gali Org/Hr 140.000,00 100%
19 Kepala Tukang pipa Org/Hr 140.000,00 100%
20 Mandor Org/Hr 150.000,00 100%
Konsultan Perencana