How engineering companies can avoid
struggling with large amounts of project data
Modern construction projects produce an enormous Continuing professional development (CPD)
amount of data, which can become a great risk for ensures you remain competent in your profession.
Chartered, Associate and Technician members of
engineering companies and other AEC firms. This the Institution must complete a specified amount
CPD module, sponsored by Newforma, examines each year. All CPD undertaken must be reported to
various digital workflows which are suitable to tackle the Institution annually. Reading and reflecting on
this article by correctly answering the questions at
those challenges. the end is advocated to be:

1 hour of verifiable CPD

Introduction day-to-day basis, according to


The construction industry is a recent study by Construction
still one of the least digitised Manager magazine.
major industries in the world, It’s no surprise then that
with many processes still being hours are being wasted when
handled manually or at best semi- engineers, architects, project
automated. managers or surveyors are
When talking about the looking for information within
digitalisation of workflows, it email inboxes or complex folder
is not uncommon for many structures. It can also become
Architecture, Engineering and increasingly difficult to stay on
Construction (AEC) professionals top of things when important
to cast it aside as something that project data resides within a
either does not affect them or variety of disconnected third-
something that they will address party sharing sources that are
in the future. inaccessible or unknown to the
The dangers of rest of the company.
underestimating the importance Besides a lack of efficiency,
of developing solid, digital there is the potential for
processes to handle large increased risk where no
amounts of data or workflows project-centric approach
are often not recognised as such. exists. This approach can be
However, the more data that has realised by centralising all data
to be handled in an unorganised, in one system, or by introducing
digital infrastructure, the more a mechanism to unify and
inefficient project teams will interrogate unorganised and
be. A staggering 35% of AEC unstructured data where it
ADOBE STOCK

professionals claim to be resides, often reflecting the


struggling with huge amounts reality of how fast-paced,
of data they are handling on a creative projects unfold.

26 July 2018 | TheStructuralEngi


TheStructuralEngineer | April 2019
neer
Industry
CPD Module
CPD
thestructuralengineer.org
thestructuralengineer.org Supplied and sponsored by Newforma

Engineering firms, architectural


practices and construction companies
are getting their project information
management right. And it is easier than
one might think
1) The right use of email
The history of email has always been about
communication, analogous to that of a simple
paper letter. With more than 4.5 billion email
accounts active worldwide it has evolved
into the most widely used communications
medium on the internet.
Instant and direct communication between
team members is of paramount importance
on projects. Therefore, including emails in
your overall project data set, ideally within a
system that makes them accessible to the
whole project team, is vital. Information held
within emails is often critical in resolving
questions and understanding why decisions
were made both during and after the project
has completed.
With higher bandwidth and better overall
connectivity, more and more people have also
defaulted to using email to transfer files. It is
not uncommon for AEC professionals to send
several emails a day containing 20 MB PDF,
UNSPLASH

DWG or other files to contractors or even


other team members, mostly because it’s
easy and simple.
The inherent problems with this workflow
are limited file sizes than can be transferred
via email and the fact that transactions via whom they have been downloaded if there There are three major problems with
email are inaccessible to those not included is little or no audit trail. Or if the only record this process. Firstly, it can take significant
on the distribution list. While email can be the is an email notification. With team members effort to agree and maintain a solid and
go-to solution to share a file, it offers reduced leaving a project or going on holiday, this can logical structure, which then needs to be
visibility to the sender’s business, who remain easily turn into a difficult situation to manage. adhered to for all time to not cause issues.
responsible for decisions made long after the Uploading information to a hosted service A potential risk when considering the
project has concluded. Additionally, emails can also introduce concerns from clients over high likelihood of human error in such a
also lack the ability to notify the sender, if a data security and sovereignty. complex industry. Secondly, there’s a high
file has been successfully downloaded by Within a high-risk environment such as the probability of delays when searching for
recipient. AEC industry, it is important to use Project files.
As much as letters do not make good Information Management (PIM) systems, Thirdly, if not properly documented such
parcels, emails are not the optimal solution for which allow you to stay and work within your a structure is only valuable to the people
exchanging files on a project. own data infrastructure. Not only to maintain who originally created it. Others might file
proper project context, but also for being able differently if they use their own logic to
2) File transfers to track information flow with a proper audit categorise information, causing co-workers
Now that email has been challenged as the trail. In cases of potential litigation, this can be to spend an unacceptable amount of time
preferred way for sharing files on a project, essential to avoid major monetary damage. locating data.
what are the tools most suited for this task? The digital world equips professionals
When there are no in-house systems in 3) Searching for project information with better and more efficient tools for such
place, many AEC professionals make use of Historically, to work in a structured world tasks, making processes from analogue
mainstream tools that target a wide-range of required neatly organised folders, drawers times obsolete.
consumers. The primary reasons for using and filing cabinets. Order was an absolute Indexing is one of the most powerful
such tools are typically convenience and necessity to find anything, typically by using a ways of being able to locate information
familiarity. numbering system as the backbone of every quickly and with a maximum of
While these tools have great appeal, they search operation. convenience. Modern internet search
are operating outside of the overall digital Many people still work this way today, even engines use exactly that principle to find
project infrastructure. Just like email, these in the era of digitalisation. There are folder millions of website pages and documents all
tools make it difficult for the wider team to structures within folder structures within around the world within the blink of an eye.
have visibility on a transaction, for example folder structures, mostly organised by name, To fully utilise this principle, it is important
if a person is sharing the most recent type, date, etc. All designed to serve one to use a PIM solution that can index file
document. It is hard to find out which files purpose: finding information as quickly and content and not just its filename and
were sent to whom and when or if and by easily as possible. attributes.

April 2019 | TheStructuralEngi


TheStructuralEngineer | July 2018
neer 27
Industry CPD
Supplied and sponsored by Newforma thestructuralengineer.org

ADOBE STOCK
4) PIM vs EDMS management involved can often exceed digital work environments.
Electronic Document Management Systems the cost of the EDMS system itself. A Implementing a system that adapts to
(EDMS) aim to centralise all project data subsequent decision to move away from an users’ needs, and not vice versa, supports
in one single database, providing every EDMS system can also be time consuming adoption at a pace that suits everyone. And
member of the team with a project container and costly. engineers can put more focus on the actual
to work within. However, there are significant An alternative and more contemporary design tasks, rather than the tools required
disadvantages to an EDMS as these way of managing project data is to use to perform those tasks.
systems do not easily support the wide a non-disruptive Project Information
variety of file types required for the modern Management system. Conclusions
building design process. If the EDMS system This approach does not require data The data struggle is real. Higher complexity,
cannot contain the information, it cannot be migration and focuses on referencing and easier to produce data, and the evolution of
aware of it. As such it does not represent a indexing data wherever it resides. This BIM have seen the amount of information
complete picture of the project. ‘light touch’ has inherently low change produced by a single construction project
For engineers an EDMS might be a good management. grow by a factor of 65 since 2004.
solution for versioning certain types of With this continually growing volume of
documents, but by far not all of them. In fact, 5) Success is having everyone on board data comes an increased risk for those
for all other files, the possibility to make Whatever system is chosen to manage companies that have not introduced
them searchable and being able find them project information, its success is defined a strategy for project information
quickly and easily is far more important. by user adoption. If the system is difficult management.
The introduction of an EDMS system can to adapt to because it requires significant With the right digital system in place, you
also disrupt the way project teams have change to working processes over a short can focus on your core business confident
worked so far, forcing everyone to adapt period of time, then it is likely to meet with in the knowledge that nothing is falling
to a new digital work environment and resistance. through the cracks.
requiring migration of project data which Particularly in the AEC industry, where In other words: the data struggle is real.
can take months. The implementation of people have worked with the same But with the right workflows not really that
such an invasive system must be carefully processes for years, it can be hard and threatening.
considered, and the cost of the change overwhelming to adapt to new tools and

xx
28 July 2018 | TheStructuralEngi
TheStructuralEngineer | April 2019
neer
Industry
CPD Module
CPD
thestructuralengineer.org Supplied and Temporary
sponsored
Tottenham
Works
byCourt
Newforma
Toolkit
Road

Questions
Answer all questions correctly and submit by 31 May 2019 to receive your CPD certificate

QUESTION 1:
QUESTION 5:
Why should files not be sent via mainstream third-party
What is a crucial factor for the successful adoption of new
tools?
technology?
❏ They are always very expensive ❏ Making sure your lawyer likes it
❏ There’s a danger of getting a computer virus ❏ Ensuring all team members are on board with the adoption
❏ Because using them means a violation of GDPR ❏ That it also works on a Macintosh system
❏ Sending and receiving data outside of the main digital ❏ That it’s certified by the Institution of Structural Engineers
infrastructure can cause disruption, misinformation and
delays within the project and team
QUESTION 6:
Which of the following is not a major disadvantage of an
QUESTION 2:
EDMS solution?
Which of the following is not a disadvantage of a manually
created folder and filing structure? ❏ Disruption of established workflows project team
members are used to
❏ Human error while manually filing documents
❏ An EDMS can only be used when working on-premises
❏ Different filing logic of different team members
❏ Its use comes with extensive data migration and a costly
❏ Manually created folder structures cannot be accessed implementation phase
without WiFi
❏ Files that are not implemented into an EDMS are not part
❏ Delays while searching for files in a certain folder structure of the project

QUESTION 3:
QUESTION 7:
Which of the following statements about email is true?
What are the potential consequences of not using a
❏ Information held within emails is often critical in resolving centralized approach when handling project data:
questions and understanding why decisions were made
❏ Inefficiency due to an inability to easily find and locate
❏ Everyone will be able to access information in email inboxes information
at all stages of the project
❏ Increased risk of costly delays and disputes
❏ There is full transparency into whether a recipient has ❏ Lower visibility and transparency for team members into
downloaded a file within an email attachment or not
current operations
❏ Emails are a perfect way to send large files ❏ All of the above
QUESTION 4:
The average amount of information a single construction
project produces in 2019 has risen by which factor since the
year 2004?
❏ Factor of 2
❏ Factor of 41
❏ Factor of 23
❏ Factor of 65

To claim your CPD certificate, take


Supplied and sponsored by the module online at http://bit.ly/
IndustryCPD-Project-Data