Project Steel Erection(Decking/Floorin

HSE INSPECTION CHECKLIST Revision No:0

Inspection Date/Checked By:


Status
Expected Date
No Description Of Item For Action OK NOT OK
Of Completion
Are weather conditions evaluated before and during
1
steel erection?

2
Are the workers performing steel erection
trained/experienced?
Are handrails or post installed for securing
3 steel wire ropes to be used for tieing of safety
harness and a safe platform provided?
Is lifting supervisor supervising all lifting works on
4 site and assisted by riggers and signalman and is
the lifting supervisor identified with a vest?
Are lifting gears inspected and a certificate
5
of fitness available?
6 Is the erection carried out as per proper
erection sequence planned and tag line used?
Means of access such as ladders and
7
scaffold provided?
Is a lifting checklist checklist used and the
8
rules complied?
Are loose bolts and nuts stored in
9
containers or bolt baskets?
Are sharp edges of steel protected with
10
softeners?
Any overhead piping and electrical lines
11
nearby?
12 Is a two way radio used during steel erection
as communication?
Is the steel erection area cordoned off with
13
barriers?
14 Is safety net used/erected beneath?
Are there sufficient Mandatory warning
15
signs provided beneath?
Are other unauthorized personnel allowed
16
to walk under load?
Are openings for pipes/equipments firmly
17
barricaded/covered?
18 Is a steel erection plan available and followed?
19 Are the steel materials placed on loose soil
without blocking them?
20 Is the steel erection carried out late in evening
when the visibility is poor?
21 Are off-cuts or unwanted materials disposed at
the end of the day?
ection(Decking/Flooring & Grating)
n No:0
Counterchecking
Date Corrected
Status Status

NA OK NOT OK Remarks