Subject: Urgent Repair Required for Dangerous 11KVA Electric Pole at KM # 873/4-5,
Near Railway Level Crossing
Dear Sub-Divisional Officer,
I trust this letter finds you well. I am writing to bring to your attention a critical
matter concerning public safety.
It has come to my notice that there is a dangerous 11KVA electric pole situated at KM
# 873/4-5, near the railway level crossing towards Lodhran District. The said electric pole is
in a hazardous condition as it is bending dangerously, posing a significant risk of causing
casualties or accidents.
Details of the Dangerous Pole:
 Location: KM # 873/4-5, Near Railway Level Crossing (towards Lodhran District)
 Issue: Bending in a dangerous position
 Risk: Potential hazard leading to casualties or accidents
The proximity of the electric pole to the railway track and the level crossing raises
concerns about the safety of both pedestrians and commuters. The bending position of the
pole makes it susceptible to collapse, creating an imminent threat that requires urgent
attention.
I urgently request your intervention to deploy a team to assess the situation and take
immediate measures to repair or replace the electric pole. The potential for casualties and
accidents makes it imperative to address this matter without delay to ensure the safety of the
community.
I appreciate your prompt attention to this serious concern, and I trust that you will
take the necessary steps to safeguard public safety in the affected area.
Thank you for your commitment to ensuring the well-being of the community, and I look
forward to a swift resolution of this urgent matter.

Sincerely,

N0. 1-E/Clean/DYR/LON-12

Engr Abdul Jabbar Chishti


(Electrical Engineer P.R)
Pakistan Railways

Copy to
1) DAEE Multan with the request to approach the MEPCO higher authorities to
resolve the matter as soon as possible.
PAKISTAN RAILWAYS MULTAN DIVISION
ELECTRICAL DEPARTMENT LODHRAN ZONE

Assistant Inspector of Works,


Lodhran.

Subject: Update on Goldamatic Repair and Water Pump Installations at Dunyapur


Railway Station
Dear Assistant Inspector of Works (Lodhran),
I trust this letter finds you well. I am writing to provide you with an update on the repair
work and current status of the water pump installations, specifically the Goldamatic system,
at Dunyapur Railway Station.
As of the latest update:
1. Goldamatic Pump in Waiting Room:
o Status: The Goldamatic pump installed in the waiting room has been in
working condition and operational until 20/12/23.
2. Donkey Pump at Station:
o Status: The donkey pump installed at the station is also in good working
condition and continues to function effectively, providing a reliable water
supply, until 20/12/23.
3. Donkey Pump in Well behind Station Building:
o Status: Unfortunately, the donkey pump installed in the well behind the
station building, near the mosque, is currently de-assembled (Motor is in
working condition and in the custody SM DYR. This is due to the non-
availability of sweet water from the TMA pipelines.
I appreciate your attention to these matters, and I am available for any further
clarification or information you may require. Your continued support and cooperation are
invaluable as we work to maintain the water supply infrastructure at Dunyapur Railway
Station.
Thank you for your understanding, and I look forward to updating you on the successful
completion of the repair work.
Sincerely,
N0. 1-E/Clean/DYR/LON-12

Abdul Jabbar Chishti


(Sub-Engineer Electrical)
Pakistan Railways

Copy to
2) DAEE Multan with the request to approach the DEN-II Multan to resolve the
matter as soon as possible.
PAKISTAN RAILWAYS MULTAN DIVISION