CONFIDENTIAL

PLAZA SINGAPURA
PRELIMINARY FEASIBILITY STUDY FOR PLAZA SINGAPURA

ARCHITECTURAL

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 1/16


CONFIDENTIAL

Main Strategies
Core Ideas

The AEI strategies is based on


identifying existing design,
operational potential for
enhancements and improve
customer experience.
PLAZA
SINGAPURA
CAPITALAND

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 2/16


CONFIDENTIAL

Code Compliances A. Removal of travellator at Atrium


Scope of Works (Summary)
1. Removal of travellator (L1-B1 & B1-B2) and slab over AEI & Code compliances
AEI
void area for new NLA
Optional (subject to waiver approval) 2. Installation 2 sets of new escalator from B2 to L1
3. Reconfiguration of affected F&B and retail at B2 & B1

B. Decantation for new GFA at B1


1. Removal of partial loading area
platform for new GFA Istana
2. New steps & ramp D. Slab over & Change of use
New carpark gantry
1. Slab over at void area for new
C. Removal of travellator at Carpark & Trellis
retail/ F&B at L2
1. Removal of 10 travellators at (Option 1)
2. New entrance/ corridor New smoke
carpark & Slab over the void area 3. Change of use to new F&B curtain at L7
New fire hydrant pump
at L2, L3, L5 & L6 for new NLA
room & water tank at roof

D
A
B A

CARPARK SHOPPING MALL SHOPPING MALL


New smoke stop lobby New Fire curtain
Extension of Bin centre New Fire and escape corridor at B2 void
New toilet New smoke curtain
& new cleaner room
cluster curtain at L7 at B2 void
1. Existing lift converted to fire lift/
1. New protect corridor evacuation lift with new PWD
2. New car park gantry New escape staircase holding point
at L2 (Option 2) from B2 to L1 2. Extended protected corridor

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 3/16


CONFIDENTIAL

Authority Waivers/ Requirements

• A&A Proposal subject to prevailing 2018 Fire Code requirements


• Waiver application is required for the following subject to SCDF approval:
▪ Fire Engine Accessway/ Fire Access Panel
▪ Fire Lift coverage and accessibility greater than the 60m limit
1 SCDF ▪ Fire Hydrant > 50m coverage
▪ Discharge point of exit staircase E & F
▪ Compartmentation by height (Carpark habitable floor > 24m)
▪ Fire Compartmentation at Basement 2 : (1) Escalator at GL D/E-14/15 (near Cold Storage)
(2) Escalator at GL D/E-20/21 (near MRT entrance)

• A&A Proposal subject to prevailing BCA approved document


• Waiver application and requirement for the following subject to BCA approval and comments:
2 BCA
▪ Low head room (less than 2.0m at localized area within new protected corridor – Staircase E) – subject to SCDF comment

• A&A Proposal subject to prevailing COPEH 2021 requirements.


• Waiver application and requirement for the following subject to approval and comments:
▪ Sanitary provisions for every floor level of shopping mall
3. NEA ▪ Refuse output and refuse compactor capacity
▪ Food Waste/ Digestor system requirement
▪ Bin Centre (clear size, height at the entrance)
▪ Provision of double slab to enclose sanitary services / pipes directly above restaurant units, if any.

4. PUB • Provision of double slab to enclose to enclose pipes from restaurant units located above other shops or restaurants

• Waiver application for deficient lorry parking provisions


5. LTA
• Waiver application to retain surplus car parking lots beyond the LTA Upper Bound requirement

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 4/16


CONFIDENTIAL

A. Removal of travellator at Atrium


Existing lift converted to fire lift/
1. Removal of travellator (L1-B1 & B1-B2) and slab over
evacuation lift with new PWD
void area for new NLA
holding point
2. Installation 2 sets of new escalator from B2 to L1
3. Reconfiguration of affected F&B and retail at B2 & B1

New transfer pump room for


fire hydrant at B2

1. New exit staircase


2. New PWD holding point
3. Toilet cluster (North Option)
A

ISTANA ABOVE

1. New fire curtain at B2 void area


Toilet cluster
2. Reconfigure of unit layout & corridor
(South Option)
Code Compliances
Change of use
AEI to new F&B BASEMENT 2
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 5/16


CONFIDENTIAL

1. New exit staircase A. Removal of travellator at Atrium


2. New PWD holding point 1. Removal of travellator (L1-B1 & B1-B2) and slab over
3. Toilet cluster (North Option) void area for new NLA Existing lift converted to fire lift/
4. Re-furnishing existing 2. Installation 2 sets of new escalator from B2 to L1 evacuation lift with new PWD
Cleaners room 3. Reconfiguration of affected F&B and retail at B2 & B1 holding point

1. New slab over for extension


of Bin centre
2. New cleaner storeroom

A
B

ISTANA ABOVE

Toilet cluster 1. New fire curtain at B2


(South Option) void area
2. Reconfigure of unit
layout & corridor
Code Compliances
B. Decantation for new GFA at B1
AEI 1. Removal of partial loading area BASEMENT 1
platform for new GFA
Optional (subject to waiver approval) 2. New steps and ramp
FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 6/16


CONFIDENTIAL

A. Removal of travellator at Atrium


1. Removal of travellator (L1-B1 & B1-B2) and slab over
void area for new NLA Existing lift converted to fire lift/
2. Installation 2 sets of new escalator from B2 to L1 evacuation lift with new PWD
3. Reconfiguration of affected F&B and retail at B2 & B1 holding point

1. New protected corridor from


L2 to L1
2. New carpark gantry & Trellis
at L1 (Option 1)

1. New exit staircase


2. New PWD holding point
3. Toilet cluster (North Option)

A
D

1. New Fire Hydrant


2. New transfer pump
room at B2
Toilet cluster 3. New fire pump room
(South Option) & tank at roof

Code Compliances
AEI Change of use to
new F&B
D. Slab over & Change of use 1ST STOREY
Optional (subject to waiver approval)
1. New entrance & common passageway FLOOR PLAN
2. Change of use to new F&B

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 7/16


CONFIDENTIAL

Existing lift converted to fire lift/


evacuation lift with new PWD
1. New protected corridor from L2 to L1 New PWD holding point holding point
2. New carpark gantry & Trellis at L1
(Option 1)
3. Reconfigure carpark & motorcycle lots
Reconfigure of unit
layout & corridor

D. Slab over & Change of use


1. Slab over at void area for new
retail/ F&B at L2
2. Change of use to new F&B

C. Removal of travellator at Carpark


1. Removal of 10 travellators at
carpark & Slab over the void area
Code Compliances at L2, L3, L5 & L6 for new NLA
2. New glass balustrade
AEI 3. New smoke curtain 2nd STOREY
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 8/16


CONFIDENTIAL

Existing lift converted to fire lift/


evacuation lift with new PWD
New PWD holding point holding point

C. Removal of travellator at Carpark


1. Removal of 10 travellators at
carpark & Slab over the void area
Code Compliances at L2, L3, L5 & L6 for new NLA
2. New glass balustrade
AEI 3. New smoke curtain 3rd STOREY
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 9/16


CONFIDENTIAL

Existing lift converted to fire lift/


evacuation lift with new PWD
New PWD holding point holding point

C. Removal of travellator at Carpark


1. Removal of 10 travellators at carpark
2. New glass balustrade
Code Compliances
AEI 4th STOREY
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 10/16


CONFIDENTIAL

Existing lift converted to fire lift/


evacuation lift with new PWD
New PWD holding point holding point

C. Removal of travellator at Carpark


Code Compliances 1. Removal of 10 travellators at carpark
2. New glass balustrade
AEI 5th STOREY
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 11/16


CONFIDENTIAL

Existing lift converted to fire lift/


evacuation lift with new PWD
New PWD holding point holding point

C. Removal of travellator at Carpark


Code Compliances 1. Removal of 10 travellators at carpark
2. New glass balustrade
AEI 6th STOREY
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 12/16


CONFIDENTIAL

Existing lift converted to fire lift/


evacuation lift with new PWD
New PWD holding point holding point

New smoke curtain at L7

New smoke curtain

Min. 2.1m

Reconfigure shop front


for new NLA
(Optional – to be
Code Compliances advice by CMO)
AEI 7th STOREY
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 13/16


CONFIDENTIAL

1. New fire pump room


2. New water tank
3. New louvres and trellis

Code Compliances
AEI ROOF
Optional (subject to waiver approval) FLOOR PLAN

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 14/16


CONFIDENTIAL

Appendix A – Overall Layout Plans (B2 to Roof level)

Appendix B –GFA & NLA computations

Appendix C – Occupancy Load calculation

Appendix D – Feasibility studies for carpark gantry and carpark provision

Appendix E – Feasibility studies for removal of travellator at carpark

Appendix F – Feasibility study for toilet clusters (North & South option)

Appendix G - Feasibility studies fire compartmentation at B2

Appendix H – Feasibility studies/ Optional layout for Staircase E

Appendix I – Feasibility studies/ Optional layout for new fire hydrant tank & pump room – with trellis and louvres

Appendix J – Feasibility studies / Layout for new exit staircase

Appendix K - Feasibility studies / Optional layout for food waste system room

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 15/16


APPENDIX A- Overall Layout Plan

PLAZA
SINGAPURA
Plaza Singapura
Basement 2

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
Basement 1

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
1st Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
2nd Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
3rd Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
4th Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
5th Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
6th Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
7th Storey

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
Roof

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


APPENDIX B - GFA & NLA computations

PLAZA
SINGAPURA
Plaza Singapura
BASEMENT 2
AREA DESCRIPTION
EXISTING
NEW
+ NEW
(GFA)
(NLA)
Slab over for new Staircase, smoke stop
AREA C +66 lobby & store
-12 New corridor over existing shop
53.8 New NLA for Retail/ F&B
16.2 New NLA for Retail/ F&B
9.7 New NLA for Retail/ F&B
5.7 New NLA for Retail/ F&B
10.6 New NLA for Retail/ F&B
2.8 New NLA for Retail/ F&B
AREA A
7.9 New NLA for Retail/ F&B
-7.5 Proposed new corridor
-21.8 Proposed new corridor
New escalator/ Smoke curtain over
-20 existing kiosk
New escalator/ Smoke curtain over
-26 existing kiosk
AREA B -82.81 New Smoke curtain over existing shop
Proposed new toilet cluster over
AREA D -229 existing shop (SOUTH)
Proposed new toilet cluster over
AREA C -150 existing shop (NORTH)
+ 66 -213.41 TOTAL (NORTH)
-292.41 TOTAL (SOUTH)

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


AREA DESCRIPTION

Plaza Singapura
EXISTING
NEW
+ NEW
(GFA) (NLA)

BASEMENT 1 8.8
9
(8.8)
( 9)
Slab over for new Retail/ F&B
Slab over for new Retail/ F&B
24 Slab over for new Retail/ F&B (existing
escalator with GFA)
41 New NLA for Retail/ F&B
16.7 New NLA for Retail/ F&B
AREA A 10 New NLA for Retail/ F&B
9 New NLA for Retail/ F&B
9 New NLA for Retail/ F&B
8.6 New NLA for Retail/ F&B
New escalator/ Smoke curtain over
-13
existing shop
New escalator/ Smoke curtain over
-13
existing shop
AREA H 14 New GFA for Clearner room
34 Slab over for Bin centre
Proposed new staircase over existing
-89
shop
AREA C
Proposed new toilet cluster over
-160
existing shop (NORTH)
Proposed new toilet cluster over
-126
existing shop (SOUTH)
AREA D 43 (43) Slab over for new Retail
Slab over for new toilet cluster
56 (56)
(SOUTH) or NLA for retail
Slab over for new Retail (Void near
40 (40)
MRT)
AREA B
Slab over for new Retail (Void near
40 (40)
MRT)
Removal of Loading deck (-35sqm
AREA H -35
GFA)
+ 209.8 40.1 TOTAL (NORTH)
* All Plans and numbers subject to design development, final computation & authorities’ approval
+ 209.8 74.1 TOTAL (SOUTH)
* High Level Preliminary Feasibility Study
Plaza Singapura
1ST STOREY AREA
EXISTING
DESCRIPTION
NEW
+ NEW
(GFA)
(NLA)

20 (20) Slab over for new Retail/ F&B

24 New NLA for new Retail/ F&B

12 New NLA for new Retail/ F&B


AREA A
24 New NLA for new Retail/ F&B

16 New NLA for new Retail/ F&B

16 New NLA for new Retail/ F&B

AREA C -50 New Staircase over existing shop


New common passageway over
-38 existing shop
AREA E
-49 New Storeroom over existing shop

12 New NLA for new retail


Proposed new toilet cluster over
AREA D
-212 existing shop (SOUTH)
Proposed new toilet cluster over
AREA C
-183 existing shop (NORTH)
AREA E 71.5 New NLA for new F&B

+20 -124.5 TOTAL (NORTH)


* All Plans and numbers subject to design development, final computation & authorities’ approval +20 -153.5 TOTAL (SOUTH)

* High Level Preliminary Feasibility Study


Plaza Singapura
2ND STOREY

AREA DESCRIPTION
EXISTING
NEW
+ NEW
(GFA)
(NLA)
AREA E +53 (53) slab over for new F&B
27 New NLA for new Retail
AREA F
-18 New corridor over existing Shop
AREA G +26 (169) Slab over for new Retail
+61 New GFA for escape corridor
AREA I
+4.5 New GFA for exit door
+144.5 231 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
3RD STOREY

AREA DESCRIPTION
EXISTING
NEW + NEW
(GFA) (NLA)
AREA G 30 (30) Slab over for new Retail
+ 30 30 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
4TH STOREY

AREA DESCRIPTION
EXISTING
NEW + NEW
(GFA) (NLA)
AREA G -51.9 Removal of travellator (decantation GFA)
- 51.9 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
5TH STOREY

AREA DESCRIPTION
EXISTING
NEW + NEW
(GFA) (NLA)
AREA G 87 (87) Slab over for new Retail
+ 87 87 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
6TH STOREY

AREA DESCRIPTION
EXISTING
NEW + NEW
(GFA) (NLA)
AREA G 87 (87) Slab over for new Retail
+ 87 87 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
7TH STOREY

AREA DESCRIPTION
EXISTING
NEW + NEW
(GFA) (NLA)
17 New NLA for new Retail
AREA J 4.3 New NLA for new Retail
28 New NLA for new Retail
49.3 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
ROOF

AREA DESCRIPTION
EXISTING
NEW + NEW
(GFA) (NLA)
22 New GFA for new fire pump room
AREA K +22 TOTAL

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

SUMMARY

SUMMARY (for proposal with toilet cluster at North) SUMMARY (for proposal with toilet cluster option at South)
STOREY NEW EXISTING STOREY NEW EXISTING
(GFA) + NEW (GFA) + NEW
(NLA) (NLA)
BASEMENT 2 66 -320.11 BASEMENT 2 66 -399.11

BASEMENT 1 209.8 40.1 BASEMENT 1 209.8 74.1

1ST STOREY 20 -187 1ST STOREY 20 -158


2ND STOREY 144.5 231 2ND STOREY 144.5 231
3RD STOREY 30 30 3RD STOREY 30 30
4TH STOREY -51.9 - 4TH STOREY -51.9 -
5TH STOREY 87 87 5TH STOREY 87 87
6TH STOREY 87 87 6TH STOREY 87 87
7TH STOREY - 49.3 7TH STOREY - 49.3
ROOF 22 - ROOF 22 -
TOTAL 614.4 186.49 TOTAL 614.4 112.49

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

ARRPOVED PLANNING DATA

ARRPOVED GFA = 70,346.51 SQM


PERMISSIBLE GFA = 71,327.33 SQM

BALANCE GFA = 980.82 SQM

* High Level Preliminary Feasibility Study


APPENDIX C – Occupancy Load calculation

PLAZA
SINGAPURA
Plaza Singapura
SUMMARY OF OCCUPANY LOAD

BASEMENT 2 – Occupancy Load BASEMENT 1 – Occupancy Load

BASEMENT 2 PAX BASEMENT 1 PAX

A APPROVED OCCUPANCY LOAD – OL 1512 APPROVED OCCUPANCY LOAD – OL


(SCDF submission dated 26 May 2022) B 1315
(SCDF submission dated 22 Jan 2020)

APPROVED MEAN OF ESCAPE APPROVED MEAN OF ESCAPE


B 1760 C 1590
(exit staircases + travellator under Performance based) (exit staircases only)

C PROPOSED OCCUPANY LOAD FOR NEW A&A 1670 D PROPOSED OCCUPANY LOAD FOR NEW A&A 1412

PROPOSED MEAN OF ESCAPE PROVIDED PROPOSED MEAN OF ESCAPE


D (1. 1 new staircase added – 240 pax) 1710 E 1830
(2. excluding Performance based – travellator) (1. 1 new staircase added – 240 pax)

BALANCE OL CAPACITY [D-C] BALANCE OL CAPACITY [D-C)]


E 40 F 418

Note: Note:
• OL subject to design development and final computation. • OL subject to design development and final computation.

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura

1st STOREY – Occupancy Load 2ND STOREY – Occupancy Load

1ST STOREY PAX 2ND STOREY PAX

A APPROVED OCCUPANCY LOAD – OL 1202 APPROVED OCCUPANCY LOAD – OL


(SCDF submission dated 13 March 2017)
A 1063
(SCDF submission dated 11 May 2020)

B APPROVED MEAN OF ESCAPE 2870 APPROVED MEAN OF ESCAPE


B 1560
(exit staircases + Area of Refuge AOR)
PROPOSED OCCUPANY LOAD FOR NEW PROPOSED OCCUPANY LOAD FOR NEW A&A
C 2728 C 1135
A&A
PROPOSED MEAN OF ESCAPE
D 2730 PROPOSED MEAN OF ESCAPE
(1 new exit added – 240 pax) D 1560
BALANCE OL CAPACITY [D-C)]
E 2 BALANCE OL CAPACITY [D-C)]
E 425
Note:
• OL subject to design development, final computation and site Note:
verification. • Waiver application required for the Area of Refuge (AOR) to be
• Calculation based on restaurant/ shops facing externally with included in the proposed mean of escape.
assumption 100% discharge externally. • OL subject to design development and final computation.
• Proposed OL included escape from staircases to L1 Mall.

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura

3RD STOREY – Occupancy Load 4TH STOREY – Occupancy Load

3RD STOREY PAX 4TH STOREY PAX

A APPROVED OCCUPANCY LOAD – OL 1337 A APPROVED OCCUPANCY LOAD – OL 1437


(SCDF submission dated 16 Feb 2021) (SCDF submission dated 04 March 2020)

APPROVED MEAN OF ESCAPE APPROVED MEAN OF ESCAPE


B 1560 B 1560
(exit staircases + Area of Refuge AOR) (exit staircases + Area of Refuge AOR)

PROPOSED OCCUPANY LOAD FOR NEW A&A PROPOSED OCCUPANY LOAD FOR NEW A&A
C 1343 C 1437

PROPOSED MEAN OF ESCAPE PROPOSED MEAN OF ESCAPE


D 1560 D 1560

BALANCE OL CAPACITY [D-C)] BALANCE OL CAPACITY [D-C)]


E 217 E 123

Note: Note:
• Waiver application required for the Area of Refuge (AOR) to be • Waiver application required for the Area of Refuge (AOR) to be
included in the proposed mean of escape. included in the proposed mean of escape.
• OL subject to design development and final computation. • OL subject to design development and final computation.

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura

5TH STOREY – Occupancy Load 6TH STOREY – Occupancy Load

5TH STOREY PAX 6TH STOREY PAX

A APPROVED OCCUPANCY LOAD – OL 1017 A APPROVED OCCUPANCY LOAD – OL 1188


(SCDF submission dated 05 Feb 2013) (SCDF submission dated 31 May 2022)

APPROVED MEAN OF ESCAPE APPROVED MEAN OF ESCAPE


B 1400 B 1320
(exit staircases + Area of Refuge AOR) (exit staircases + Area of Refuge AOR)

PROPOSED OCCUPANY LOAD FOR NEW A&A PROPOSED OCCUPANY LOAD FOR NEW A&A
C 1035 C 1223

PROPOSED MEAN OF ESCAPE PROPOSED MEAN OF ESCAPE


D 1400 D 1320

BALANCE OL CAPACITY [D-C)] BALANCE OL CAPACITY [D-C)]


E 365 E 97

Note: Note:
• Waiver application required for the Area of Refuge (AOR) to be • Waiver application required for the Area of Refuge (AOR) to be
included in the proposed mean of escape. included in the proposed mean of escape.
• OL subject to design development and final computation. • OL subject to design development and final computation.

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura

7TH STOREY – Occupancy Load

7TH STOREY PAX

A APPROVED OCCUPANCY LOAD – OL 1206


(SCDF submission dated 05 Feb 2013)

APPROVED MEAN OF ESCAPE


B 1400
(exit staircases + Area of Refuge AOR)

PROPOSED OCCUPANY LOAD FOR NEW A&A


C 1211

PROPOSED MEAN OF ESCAPE


D 1400

BALANCE OL CAPACITY [D-C)]


E 189

Note:
• Waiver application required for the Area of Refuge (AOR) to be
included in the proposed mean of escape.
• OL subject to design development and final computation.

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
Occupancy load studies at L1

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


APPENDIX D – Carpark gantry and carpark provision

PLAZA
SINGAPURA
Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

EXISTING DISCHARGE STAIRCASES AT L1


1ST STOREY

Staircase to provide new


protected corridor from L2
carpark to L1

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW PROTECTED CORRIDOR @ L2 TO L1

2ND STOREY 1ST STOREY


Staircase to provide new
protected corridor from L2
carpark to L1
Staircase to provide new
protected corridor from
L2 carpark to L1

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW PROTECTED CORRIDOR @ L2 TO L1


▪ (a) Staircase K & L (10) with new protected corridor

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

1. CARPARK GANTRY AT L1 (OPTION 1)


▪ (a) Staircase K & L (10) with new protected corridor

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

1. CARPARK GANTRY AT L1 (OPTION 1)

Staircase to provide new


protected corridor from L2
carpark to L1

Option 1
Carpark gantry to be
relocated at L1

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

1. CARPARK GANTRY AT L1 (OPTION 1)

Existing upstand to be modify Carpark gantry to be


with new pathway for relocated at L1
discharge

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

1. CARPARK GANTRY AT L1 (OPTION 1) – WITH CANOPY STUDY

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

1. CARPARK GANTRY AT L1 (OPTION 1) – WITH CANOPY STUDY

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW PROTECTED CORRIDOR @ L2 TO L1 (OPTION 2)


2ND STOREY

Staircase to provide new protected


corridor from L2 carpark to L1

Carpark gantry to be relocated


5 nos. of carpark lots to
at L2 carpark/ driveway
be removed

Relocate of HR/ DR and


exit door

3 nos. of motorcycle
lots to be relocate

* High Level Preliminary Feasibility Study


Plaza Singapura
APPORVED LTA-VP RECORD

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
PRELIMINARY – CARPARK PROVISION (based proposal AEI with additional GFA)

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

PRELIMINARY STUDY – LOADING/ UNLOADING BAY


(OPTION B – 8 LOTS)

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

PRELIMINARY STUDY – LOADING/ UNLOADING BAY


(OPTION B – 8 LOTS)

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

PRELIMINARY STUDY – LOADING/ UNLOADING BAY


(OPTION B – 8 LOTS)

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

PRELIMINARY STUDY – LOADING/ UNLOADING BAY


(OPTION B – 8 LOTS)

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

PRELIMINARY STUDY – LOADING/ UNLOADING BAY


(OPTION A – 4 LOTS)

* High Level Preliminary Feasibility Study


APPENDIX E - Removal of travellator at carpark floor

PLAZA
SINGAPURA
Plaza Singapura
Travelator

Up to 3rd storey Up to Deck 6


EC-03/ EC-04 (R) EC-13/ EC-14 (R) EC-09/ EC-10 (R) at
below 4th storey

EC-01/ EC-02 EC-15/ EC-16 EC-11/ EC-12

Carpark Deck 2 Up to 6th storey


Carpark Deck 6

2nd storey - Remove travelator 3 & 4 5th storey - Remove travelator 13 & 14

Up to 3rd storey Up to Deck 6A


EC-13/ EC-14 (R) at
EC-07/ EC-08 EC-03/ EC-04 (R) below 5th storey EC-17/ EC-18 (R)

EC-05/ EC-06 (R) EC-15/ EC-16 EC-19/ EC-20


Up to 4th storey
Carpark Deck 6A
Deck FFL Carpark Deck 4
109.752
3rd storey – Remove travelator 5&6 6th storey - Remove travelator 17 & 18

Up to Deck 4A EC-13/ EC-14 (R) at


below 5th storey
EC-07/ EC-08 EC-09/ EC-10 (R)
EC-05/ EC-06 (R) at EC-19/ EC-20
below 3rd storey EC-11/ EC-12

7th storey -
Carpark Deck 4A Legend:
4th storey - Remove travelator 9 & 10 (R): Travelator to
remove

Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
Plaza Singapura
Travelator at 2nd storey

Accessible route
2nd storey existing shop
Ext’g shop FFL 108.322 New extension of retail shop
270 (existing 108.592 FFL)
Existing letter boxes to be relocated

New retail shop (108.592 FFL)


New extension New fire escape EC-03/ EC-04 (R)
of retail shop corridor to Fire
Fighting Lobby
& Exit Stair 1. Existing travelator 3&4 to remove and
EC-01/ EC-02 new slab over at level 108.592 FFL
New accessible rc
ramp (1:12) with Outline of new 2nd
handrail storey retail unit
Deck 2
Ext’g FFL 109.572 2nd storey
New full height Remove travelator 3 & 4
2hr fire rated
Travelator longitudinal section masonry wall with
plaster and paint
2nd storey ceiling
New extension
of retail shop Fire Escape
Corridor

External wall of
2nd storey extended unit
(travelator removed)

Deck 2
VIEW 1 FFL 109.752
Travelator cross section

Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
Plaza Singapura
Travelator at 3rd storey
Outline of new 3rd
storey retail unit
3rd storey existing shop
New retail shop (112.284 FFL) Ext’g shop FFL 112.284 Existing travelator 3&4 to
remove and new slab over
30 sqm

Accessible route
New retail shop
New glass EC-07/ EC-08 EC-03/ EC-04 (R) (112.284 FFL) New glass
balustrade
balustrade
Open to below
EC-05/ EC-06 (R)

Travelator 5&6 to
remove. Upper Deck 3
Ext’g FFL 112.284 3rd storey
Remove travelator 5&6
Travelator longitudinal section
External wall of
3rd storey extended unit

EC-05/ EC-06 (R)

EC-03/ EC-04 (R)


New glass
balustrade
3rd storey

Travelator cross section VIEW 2

Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
Plaza Singapura
Travelator at 4th storey

New glass
4th storey balustrade
FFL 116.246

EC-07/ EC-08
2 EC-09/ EC-10 (R)

EC-05/ EC-06 (R) at below 3rd storey


EC-11/ EC-12

Deck 4A

4th storey
Travelator longitudinal section Remove travelator 9&10

New glass
balustrade

Deck 4A EC-09/ EC-10 (R)

Deck 4 Level 4

Level 4
Travelator cross section VIEW 1 VIEW 2

Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
Plaza Singapura
EC-15/ EC-16
Travelator at 5th storey
5th storey existing shop
Ext’g shop FFL 120.234
New extension of retail shop New glass
(New RC slab to match existing balustrade
120.243 FFL. 87 sqm) Up to Deck 6 EC-09/ EC-10 (R) at
below 4th storey

EC-13/ EC-14 (R) 1 Open to below


2

EC-15/ EC-16
Existing glass EC-11/ EC-12
New full balustrade
height wall

Carpark Deck 6

5th storey - Remove travelator 13 & 14


Travelator longitudinal section

New Retail Shop at


5th storey FFL
120.243
EC-13/ EC-14 (R)

EC-09/ EC-10 (R) at


below 4th storey

Level 5 Deck 4C
Travelator cross section VIEW 1 VIEW 2

Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
Plaza Singapura
Travelator at 6th storey
6th storey existing shop
FFL 124.170
New extension of retail shop
(new RC slab to match existing 124.170 New glass
FFL. 87 sqm) balustrade

New extension of
retail shop
Existing
glass façade
EC-13/ EC-14 (R) at
below 5th storey
2 3 EC-17/ EC-18 (R)

(existing 124.170 to keep.


FFL. 98 sqm)
EC-19/ EC-20
1.5L EC-15/ EC-16
Open to 6th
masonry wall Up to 6th storey storey FFL
below
Deck 6

Travelator longitudinal section 6th storey - Remove travelator 17 & 18


Soffit of non-load bearing roof with
fire rated ceiling board storey

Deck 6A
Existing
glass
window New glass EC-17/ EC-18 (R)
Facade to balustrade
keep.
Remove
travelator 13 & 14 New slab to
match 6th
storey FFL
124.70
Travelator cross section View of Extension of 6th Deck 6 View of Extension of 6th Level 6 Remove travelator 17&18
storey from inside the unit storey from inside the unit
View 1 View 2
Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
Plaza Singapura
Travelator at 7th storey
Non-load bearing metal roof with
hot-dip galv steel support below
and fire rated board ceiling for 6th
storey retail unit extension
New extension of
retail shop Existing
(existing 124.170 glass façade
FFL. 98 sqm) to keep.

1.5L Open to 6th storey below


EC-15/EC-16
EC-19/ EC-20
masonry wall
Up to 7th storey

7th storey – Slab over 6th storey


Travelator longitudinal section extension unit

Travelator cross section

Detailed studies on the floor plans are to be carried out together with other floor levels and are subject to site verifications and consultants’ input. * Feasibility Study
APPENDIX F-Toilet provision

PLAZA
SINGAPURA
Plaza Singapura
PRELIMINARY SANITARY PROVISIONS (based on existing)

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
PRELIMINARY SANITARY PROVISIONS (based on COPEH 2021 REQUIREMENT)

Total shortfall

(Toilet cluster)

(Toilet cluster)

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
PRELIMINARY SANITARY PROVISIONS (based on Proposed A&A works with or without waiver granted)

To exclude the shortfall at L7 to To include the shortfall at L7 to


be add on to B2 to L1 toilet B2 to L1 toilet cluster – if
cluster – if waiver granted waiver rejected

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
PROPOSED TOILET CLUSTER (SOUTH OPTION) – proposal with waiver rejected
• To include the shortfall at L7 to B2 to L1 toilet cluster if waiver rejected

BASEMENT 2 BASEMENT 1 1ST STOREY

9 9 9

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


Plaza Singapura
PROPOSED TOILET CLUSTER (SOUTH OPTION) – proposal with waiver granted
• To exclude the shortfall at L7
• Area hatched in blue are potentially can be converted to NLA

BASEMENT 2 BASEMENT 1 1ST STOREY

9 9 9

* All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


APPENDIX G - Fire compartmentation at B2

PLAZA
SINGAPURA
Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
▪ (1) Escalator at GL D/E-14/15 (near Cold Storage) BASEMENT 2

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
▪ (2) Escalator at GL D/E-20/21 (near MRT entrance)

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

STUDIES FOR FIRE COMPARTMENTATION @ B2


▪ (1) Escalator at GL D/E-14/15 (near Cold Storage)

OPTION 1 OPTION 2

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 1 BASEMENT 2

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 1 BASEMENT 1

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 1 1ST STOREY

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 2 BASEMENT 2

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 2 BASEMENT 1

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 2 1ST STOREY

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

FIRE COMPARTMENTATION @ B2
OPTION 2 BASEMENT 2

* High Level Preliminary Feasibility Study


APPENDIX H - Staircase E discharge

PLAZA
SINGAPURA
Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

* High Level Preliminary Feasibility Study


APPENDIX I-New fire hydrant tank & pump room

PLAZA
SINGAPURA
Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

Existing Public Fire Hydrant > 50m coverage

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW FIRE PUMP ROOM AND HYDRANT TANK AT ROOF (OPTIONAL)

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW FIRE PUMP ROOM AND HYDRANT TANK AT ROOF (OPTIONAL)

EXISTING

* High Level Preliminary Feasibility Study


APPENDIX J – New exit staircase

PLAZA
SINGAPURA
Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW STAIRCASE LAYOUT (EJECTOR PIT)

BASEMENT 2 BASEMENT 1

GRIDLINE
H

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

NEW STAIRCASE LAYOUT (EJECTOR PIT)

1ST STOREY SECTION

GRIDLINE
H

* High Level Preliminary Feasibility Study


APPENDIX K- Bin centre & foodwaste

PLAZA
SINGAPURA
Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

BIN CENTRE/ ON-SITE FOOD WASTE TREATMENT SYSTEM @ BASEMENT 1

Existing layout
▪ Room size = 6970mm x 5450mm
▪ Opening size = 4719mm (H) x 2962mm (W)
▪ Compactor outside the bin centre = 15 m3
▪ Compactor within the bin centre = 12 m3

▪ Type of compactor = to be advice (stationary


compactor or (RORO) roll on roll off
compactor)

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

BIN CENTRE/ ON-SITE FOOD WASTE TREATMENT SYSTEM @ BASEMENT 1

Proposed layout
▪ Room size = 8500mm x 7725mm
▪ Opening size = 4719mm (H) x 7000mm (W)
*Opening height to verify further on site

▪ If it’s a (RORO) roll on roll off compactor –


NEA required min. 4m (width) x 5m clear
(height) opening

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

Computation of Refuse Output (based on COPEH 2021) - existing

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


Plaza Singapura * All Plans and numbers subject to design development, final computation & authorities’ approval

BIN CENTRE/ ON-SITE FOOD WASTE TREATMENT SYSTEM @ BASEMENT 1 (OPTIONAL)

Proposed layout
▪ Room size = 8500mm x 7725mm
▪ Opening size = 4719mm (H) x 7000mm (W)
*Opening height to verify further on site

▪ If it’s a (RORO) roll on roll off compactor –


NEA required min. 4m (width) x 5m clear
(height) opening

▪ New Food waste system room and new


cleaner storeroom

*Extracted from PDDM presentation slide received 01 Nov’22

* High Level Preliminary Feasibility Study


CONFIDENTIAL

THANK YOU

DESIGN FEASIBILITY STUDY | 05 JAN 2023| 104/16