Company LOGO PROJECT QUALITY PLAN

CLIENT: DCHI DOC No.: SW- DC- PQP- WMS


DCHI Data Centre Service REV No.: 00
DATE:
SW-WMS-MEP -ELE-00 WMS for cable laying ,drainage
piping,conduiting REV. NO: 00
WORK METHOD STATEMENT
FOR
1- Cable Laying

2- Drainage Piping

3- Conduiting

Cable laying and Conduiting


Page 1 of 2

1-First we will take the measurement for the specified routes. Then we will cut the cable as per taken
measurements.
2- After that we will start the cable laying from DB to de- humidifiers locations on tray available above ceiling.
3-After that we will drop the cable near to the de- humidifier locations, putting holes one the ceiling.
4-We will cut the conduit as per the measurement from the ceiling, we will place the cable inside the conduit and
will fix the conduit on the wall by using of saddles.
5-We will fix the GI back box on wall after that we will remove the shield of the cable, will fix it in switch and
socket. Then we will fix the front plate.
6-Then we will complete the cable dressing end to end.
7- After completion of dressing we will go for DB side connection.
8- We will remove the shield of the cable and make the gland after the will connect the cable in MCB.
Drainage Piping

1- First all of we will take the measurements from de- humidifier locations to the near to the drainage line area.
2- After that we will cut the pipe as per measurements taken out.
3- Then we will put a hole on wall using drill machine.
4- After that we will insert the pipe inside the nitrile rubber and will lay pipe as per required routes available at site.
5- Then we will insert the flexible pipe connected with the de-humidifier into the GI pipe.
6- After that we will fix the supports below the pipe as designed required at site.

SIGNATURE

NAME Satyajit Nayak


PARTICULARS PREPARED BY: REVIEWED BY APPROVED BY: ISSUE DATE
Client logo
Company logo PROJECT QUALITY PLAN

CLIENT: DCHI DOC No.: SW- DC- PQP- WMS


DCHI Data Centre Service REV No.: 00
DATE:
SW-WMS-MEP -ELE-00 WMS for cable laying, drainage piping,
conduiting REV. NO: 00

REF. NO TABLE OF CONTENT PAGE NO

1.0 SCOPE

2.0 REFERENCES

3.0 ABBREVATIONS

4.0 EQUIPMENT

5.0 RESPONSIBILITIES

6.0 PROCEDURE

7.0 DOCUMENTS

SR. REFERENCE DOC. NO. REV. REVISION DETAILS DATE


NO. NO.

Page 2 of 2