Professional Documents
Culture Documents
Powerpoint Templat (Autosaved)
Powerpoint Templat (Autosaved)
NORTH
WEST EAST
WASTE RECEPTAACLES
DRAINAGE SYSTEM DEMOGRAPHY
climate STUDENT 60%
3% 7%
WIND SPEED 9km/h STAFF 3% 10%
WIND DIRECTION southwest NON-STAFF 7%
RAINFALL 3.9mm COMMUTERS 10% 15% 60%
RELATIVE HUMIDITY 59% VISITORS 15%
MAXIMUM TEMPERATURE 31°C
MINIMUM TEMPERATURE 26°C
TOPOSEQUENCE
Good drainage
systems littering of leaves Nearness to road Noise pollution
Greenery
Absence of Wi-Fi Spacious land for Air pollution
Room for development
movement
Easy entry to site Insects
Cool environment
Presence of due To trees
receptacles present.
T.A
ORTUS ARADISI
TAWIAH AMPONSAH ADJEI SUBJECT:STUDIO
KWABENA SHEET: 8
SWOT analysis
T.A
ORTUS ARADISI
TAWIAH AMPONSAH ADJEI SUBJECT:STUDIO
KWABENA SHEET: 9
Potentials and constraints
POTENTIALS PROPOSALS CONTRAINTS PROPOSALS
HORTUS PARADISI
TAWIAH EDMUND SELASI DZUAZAH SHEET: 10
AMPONSAH ADJEI KWABENA
Potentials and constraints
POTENTIALS proposals Constraints proposals
Introduction of
more ornamentals
Waste containers to absorb toxics Littering by
leave on site Pruning of weak
from the air.
branches
pebble
Pebbles in a raised pond PLANTING MATERIAL
can serve as an ornamental
The integration of
and textural element,
planting materials, a
adding visual interest and a
windbreak, air purifiers,
natural aesthetic to the
and a noise buffer into
pond's design.
my garden is intended
SEATING AREA to promote biodiversity,
A seating area provides a address wind concerns,
designated space for enhance air quality, and
individuals to comfortably create a tranquil
sit, socialize, or engage in outdoor space.
various activities.
CONCEPT ADOPTION: THE NOISE BUFFERS AND CONCEPT ADOPTION:THE POND (WATER
WINDBREAKS FEATURE).
CONCEPT MODIFICATION: INDIAN MUST TREE CONCEPT MODIFICATION: the pond will be
will be used in place of ROYA PALM. Square shape instead of rectangle.
STEP FOUR
STEP ONE
STEP TWO STEP TREE
Place the bricks evenly
Mark the area of the on top of the lining
Clear all vegetation, Install the lining
proposed pond. material, ensuring
rocks, etc. from the and other
Ascertain the natural proper alignment and
area. components.
slope where the main stability as you build.
Remove the top Trim away any Apply ample binding
wall is to be built.
soil. surplus lining material (mortar)
Mark off the main
material using between the bricks and
wall at the lower end Excavate the area
and dig the hole for appropriate tools, lining to enhance
of the pond, where
ensuring a neat structural strength and
the slope is the the pond.
and precise fit. ensure secure
greatest. adhesion..
FINAL STEP
NOT DRAWN
TO SCALE
SCALE: 1:100
SCALE: 1:100
NORTH ELEVATION
SCALE: 1:100
WEST ELEVATION
EAST ELEVATION
SCALE: 1:100
SOUTH ELEVATION
LONGITUDINAL SECTION
SCALE: 1:100
CROSS SECTION