“PROFESSIONAL PRACTICE”
By: Alfredo A. Fernandez, LL.B

- The profession of Architecture calls for men and women of highest integrity-
PROFESSIONAL PRACTICE IN A NUT SHELL

ARCHITECTS LAW (R.A. 9266 )

Art. 2, Sec. 12, 18 and 17, In relation to Sec. 25. Note also Sec. 20, 21, 22, 23, 29,30, 31,32, 37 and Good Moral Character under Sec 13.

Oath of Art. 1, Sec. 3 (3) and (4) of R.A.


Professionals Doc 301
9266 (General
(Favorite Exam Areas:) Conditions)
Obeying the (Favorite Exam
Laws Areas: Schedule of
Time Limits)
SPP 2010
Code of Ethical
Conduct

Architects
Guidelines on
Favorite Exam Areas: Methods of Fee Structure Contract
Compensation Preparation
1.) Traits of an Architect
(2016) (UAP Doc
2.) Paid advertisement
(3.4, 3.5, 3.6) 401-402)
3.) Sec. 4.1, 4.2, 4.4, 4.6,
4.8, 4.9,
4.) Sec. 5.4, Dispute Resolution
5.) Sec. 6.1, 6.2
6.) Sec. 7.1, 7.2, 7.3, 7.4,
7.5, 7.7, 7.9, 7.15, 7.21,
7.22
7. ) 2018 Architects Credo
Schedule of Recommended Fee for Regular Design Services
(Reference : 2018 Architect Guidelines on Methods of Compensation)

Project Construction
Keyword - Simple (GROUP 1) Keyword - Moderate (GROUP 2) Keyword - Exceptional Complexity (GROUP 3)
Cost

Baseline of Fees DAEDS DADS DAEDS DADS DAEDS DADS

3% 3.6% 4.2%
5% 6% 7%
50M & Less (Pattern (Less .60): (Pattern (Less .60): Pattern (Less .60):
(Pattern: 5,4,3 2 1.5) (Pattern: 6,5,4,3,2,1) (Pattern: 7,6,5,4,3,2)
3,2.4,1.8,1.2,.6) 3.6,3,2.4,1.8,1.2,.6) (4.2,3.6,3,2.4,1.8,1.2)

Over 50M – 100M (2.5M) + 4% IN EXCESS (1.5M) + 2.4% IN EXCESS (3.0M) + 5% IN (1.8M) + 3.0% IN EXCESS (3.5M) + 6% IN (2.1M) + 3.6% IN
OF 50M OF 50M EXCESS OF 50M OF 50M EXCESS OF 50M EXCESS OF 50M
Over 100M – 200M (4.5.M) + 3% IN EXCESS
(2.7M) + 1.8% IN EXCESS (5.5.M) + 4% IN (3.3M) + 2.4% IN EXCESS (6.5.M) + 5% IN (3.9M) + 3.0% IN
OF 100M
OF 100M EXCESS OF 100M OF 100M EXCESS OF 100M EXCESS OF 100M

Over 200M – 500M (7.5M) + 2% IN EXCESS


(4.5M) + 1.2% IN EXCESS (9.5M) + 3% IN (5.7M) + 1.8% IN EXCESS (11.5M) + 4% IN (6.9M) + 2.4% IN
OF 200M
OF 200M EXCESS OF 200M OF 200M EXCESS OF 200M EXCESS OF 200M

Over 500M – 1B (13.5M) + 1% IN EXCESS


(8.1M) + .6% IN EXCESS (18.5M) + 2% IN (11.1M) + 1.2% IN EXCESS (23.5M) + 3% IN (14.1M) + 1.8% IN
OF 500M
OF 500M EXCESS OF 500M OF 500M EXCESS OF 500M EXCESS OF 500M

Over 1B (18.5M) + .5 (1/2%) IN


(18.5M) + .6% IN EXCESS (28.5M) + 1% IN (17.1M) + .6% IN EXCESS (38.5M) + 2% IN (23.1M) + 1.2% IN
EXCESS OF 1B
OF 1B EXCESS OF 1B OF 1B EXCESS OF 1B EXCESS OF 1B
Progress Payment Schedule
(Reference : 2018 Architect Guidelines on Methods of
Compensation)