INTEGRATED POULTRY INDUSTRY SDN BHD

MAINTENANCE DEPARTMENT
BILL OF QUANTITIES

Project : To supply and install capacitor bank for MSB 1


Date :
Contractor :

Item No Description Unit Qty Rate (RM) Amount (RM)


1.0 To supply skilled labor, Competent person, material and Lot 1
equipment.

2.0 To supply and install for MSB 1

a. Micro power factor regulator (PFR60) Pc 1


b. Step 1 capacitor (25kvar) s 1
c. Step 2 capacitor (25kvar+25kvar) Pc 2
d. Step 3 capacitor (25kvar+25kvar) s 2
e. Step 4 capacitor (25kvar+25kvar) Pc 2
f. Step 5 capacitor (25kvar+25kvar) s 2
g. Step 6 capacitor (25kvar+25kvar) Pc 2
s
Pc
s
Pc
s
Pc
s

3.0 To supply and install contactor

a. Step 1 contactor 100amp Pc 1


b. Step 2 contactor 150amp s 1
c. Step 3 contactor 150amp Pc 1
d. Step 4 contactor 150amp s 1
e. Step 5 contactor 150amp Pc 1
f. Step 6 contactor 150amp s 1
Pc
s
Pc
s
Pc
s

4.0 To supply and install MCCB

a. Step 1 MCCB 100amp Pc 1


b. Step 2 MCCB 150amp s 1
c. Step 3 MCCB 150amp Pc 1
d. Step 4 MCCB 150amp s 1
e. Step 5 MCCB 150amp Pc 1
f. Step 6 MCCB 150amp s 1
Pc
s
Pc
s
Pc
s

5.0 Installation test report and warranty Lot 1

SUB
TOTAL

……………………………………………….
COMPANY CHOP & SIGNATURE

DATE :…………………………………….