175-325000 - 2 Coulmn Tray & Packing
175-325000 - 2 Coulmn Tray & Packing
0012 R X Pressure retaining parts MTC's Verification of sub-components shall be performed on material
and test certificates with original equipment approved
manufacturer (OEM).
0020 R Procedure Qualification Records & Welding Procedures Per ASME Section IX, and SAES-W-010. Tray Rings &
Specifications (PQR & WPS) Attachments to Vessel per 32-SAMSS-004. Company approval
required.
0030 R Welders Qualification Records Per ASME Section IX, and SAES-W-010.
0020
0010
***
W
In process inspection & test requirement
Assembly
Specification Details / Notes:
Trial assembly and Inspection of one tray of each type
manufactured.
0030 W Thickness Tray Components per Table-2 and Tray Rings per Table-1 of
32-SAMSS-020.
0040 W Seal Welding Verify Seal Welding of Tray Rings to Vessel Prior to PWHT &
Hydrostatic Test.
0030
0010
***
W R
Final inspection & test requirements
Workmanship, Material, Surface Defects, Components, and
Specification Details / Notes:
Per 32-SAMSS-020.
Dimensions.
IR325000 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 02/26/2017 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 06/23/2016 IR325000 2 of 2
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0030 W Spare Parts Verify spare parts quantity per 32-SAMSS-020.
0040 W X Marking Marking of Tray Sections and Deck Sections, Package Marking
per 32-SAMSS-020.
0070 R X Product Test Certificate and records As per applicable SAMSS and IR
Notes:
(1) Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.
(2) Compliance with NACE MR-01-075 for Vessels in Sour Service. Tray Rings per 32-SAMSS-004. Inspector to verify the condition and protective
packing of the tray materials prior to fabrication and assembly.
End of IR325000