THERMAX - COOLING HEATING SBU Classification: Internal

PCE INPUT
PURCHASER 0 PPD. BY:
Site location 0 REV. 1
Date 12/21/2023
DESCRIPTION: PCE INPUT DETAILS
PCE TYPE ESP
BOILER UNIT UNIT 0
Boiler type AFBC BOILER
Boiler capacity TPH 25
Indonesian
Fuel Analysis Rice Husk F grade coal
coal
Carbon % By Wt. 36.670 33.310 42.960
Hydrogen % By Wt. 4.570 2.380 3.150
Nitrogen % By Wt. 0.150 0.670 0.610
Sulphur % By Wt. 0.180 0.190 0.090
H2O % By Wt. 10.540 9.470 35.080
Ash % By Wt. 15.010 46.000 3.020
Oxygen % By Wt. 32.880 7.980 15.090
GCV Kcal/Kg 3150 3200 4200
Fluegas Analysis (wet)
CO2 % By Vol. 13.081 13.255 12.931
H2O % By Vol. 16.709 12.751 17.288
SO2 % By Vol. 66.644 70.833 66.815
O2 % By Vol. 3.541 3.132 2.956
N2 % By Vol. 0.025 0.030 0.011
Fluegas Quantity Kg/Hr 45060 38234 39204
Fluegas density at NTP Kg/Nm3 1.29 1.31 1.29
Fluegas volume at NTP Nm3/Hr 34873 29136 30421
Fluegas temperature Deg. C 170 175 175
Fluegas volume at above temp. M3/Hr 55211 47232 48739
Inlet dust concentration w/o lime
gm/Nm3
dosing 18.22 55.21 3.07
Inlet dust concentration with lime
gm/Nm3
dosing 20.73 57.82 4.12
Desired Outlet dust conc. All field
mg/Nm3 30 30 30
working w/o lime dosing
Desired Outlet dust conc. All field
mg/Nm3 50 50 50
working with lime dosing
Desired Outlet dust conc. One field
mg/Nm3 0 0 0
out of service
Expected unburnt carbon in fly ash
% 10.38 4.14 43.42
of fluegas

Page 1 of 2
Client - M/s. AURO SUNDRAM INTERNATIONAL
Project - 27 TPH, 65 kscg, 485 +/- 5 deg C AFBC UB Bidrum
THERMAX - COOLING HEATING SBU Classification: Internal

Site location 0
Electrical Voltage 415 V
Frequency 50 V
Control voltage 230 V
Control Freqency 50 Hz
Seismic Zone 0
Wind velocity 0 M/sec
Ambient tempertaure 40 Deg C
Site Elevation 0 m from MSL
Relative Humidity 60 %
Mechanical Design Temp 200 Deg C
Electrical Design Temp. 50 Deg C

Special Note:
1. ESP Supporting Structure will be in M.S (From +300 mm Pedestal) and in ESP Vendor Scope.
2. Electrical Cabling of 60 Mtr will be in ESP vendor Scope.
3. Platform for Hopper manhole doors will be in M.S. and part of ESP Vendor
4. The distance between hopper bottom and FFL will be 2.5 mtr(For Dense Phase AHS)
5. RAV for Hoppers will be in ESP Vendor's Scope.
6. The lifting frame/Erection Tool for Installation of collecting electrodes will be in ESP Vendor Scope.
7. Supervision of Erection work for 21 Days without any cap of number of visits shall be in ESP Vendor’s scope.
8. Packing and Forwarding shall be Sea worthy/ Export quality if site is out of India.
9. Please send ESP Erection Weight and Insulation Area along with Technical Offer.

Page 2 of 2
Client - M/s. AURO SUNDRAM INTERNATIONAL
Project - 27 TPH, 65 kscg, 485 +/- 5 deg C AFBC UB Bidrum