Professional Documents
Culture Documents
Page 1 of 10
ACE-PUR-F-05
SUPPLIER INPUT FORM Issue No.: 1 Rev.-00
Issue Date: 19-06-2019
Does your company have a brief profile of the Company's
Organization Yes ¨ No¨ NA¨
Section 3.0
Product Quality Questionnaire
Do you inspect/verify purchased materials and products prior to
acceptance?
Yes √ No¨ NA¨
Do you inspect/verify customer-supplied materials and products
prior to acceptance?
Yes √ No¨ NA¨
Is the inspection/verification status of materials, components and
work-in-progress identified throughout the manufacturing
Yes √ No¨ NA¨
process?
Do you provide job & quality related training to your staff?
Yes √ No¨ NA¨
If Yes to the above ,do you maintain training records (Welders,
NDT operators etc.)
Yes √ No¨ NA¨
Is all inspection and testing equipment subject to formal
calibration procedures?
Yes √ No¨ NA¨
Do you have a formal procedure for the control of NC products?
Yes √ No¨ NA¨
Are all inspection/verification records retained and made
available to customers on request?
Yes √ No¨ NA¨
Do you Have formal process for the release of completed
products prior to dispatch?
Yes √ No¨ NA¨
Are you agreeable to an onsite survey to verify the information
given in this questionnaire?
Yes √ No¨ NA¨
Do you provide Material Certificates as per ISO 10204 3.1 B or
equivalent?
Yes √ No¨ NA¨
Company Stamp:
Instructions:
Please ensure that in addition to providing the bank details above, we require that you provides us this
information on your letter head with your company stamp and signature of an authorized officer of your
company.
Page 2 of 10
ACE-PUR-F-05
SUPPLIER INPUT FORM Issue No.: 1 Rev.-00
Issue Date: 19-06-2019
Approval / Rejection
Approval coding Certification No:
A. Approved Code: Score :
B. Approved subject to doc. review Date :
D. Rejected Designation
Approval ( To be signed)
Designation Signature Approved Date
Supply Chain Manager Yes ¨ No ¨
General Manager Yes ¨ No ¨
Entered to the system By
Page 3 of 10
rsteel.com
Page 4 of 10
Ace Crane Systems LLC
Hamriyah Free Zone
Tel: 06 5269080
SUPPLIER INPUT FORM info@ace-me.com
Please Complete Section 1.0 to 3.0
Section 1.0: Supplier Information
Supplier Name
Mailing Address
Physical Address
Telephone Fax
Email Website
Product or Service
Type of Ownership
Owner/Partners Name
Date/Year Established
MANDATORY :Please attach Trade License/Registration Certificate of your Company.
Principal Contact
Designation
Tel/Mobile Fax/Email:
Total No of Staff
Payment Type Cheque ¨ Wire Transfer¨Cash¨ Currency:
Payment Terms
Bank Details
1.Bank Account no 2.Bank Name:
Section 3.0
Product Quality Questionnaire
Do you inspect/verify purchased materials and products prior to
acceptance?
Yes ¨ No¨ NA¨
Do you inspect/verify customer-supplied materials and products
prior to acceptance?
Yes ¨ No¨ NA¨
Is the inspection/verification status of materials, components and
work-in-progress identified throughout the manufacturing process?
Yes ¨ No¨ NA¨
Do you provide job & quality related training to your staff?
Yes ¨ No¨ NA¨
If Yes to the above ,do you maintain training records (Welders, NDT
operators etc.)
Yes ¨ No¨ NA¨
Is all inspection and testing equipment subject to formal calibration
procedures?
Yes ¨ No¨ NA¨
Do you have a formal procedure for the control of NC products?
Yes ¨ No¨ NA¨
Are all inspection/verification records retained and made available to
customers on request?
Yes ¨ No¨ NA¨
Do you Have formal process for the release of completed products
prior to dispatch?
Yes ¨ No¨ NA¨
Are you agreeable to an onsite survey to verify the information given
in this questionnaire?
Yes ¨ No¨ NA¨
Do you provide Material Certificates as per ISO 10204 3.1 B or
equivalent?
Yes ¨ No¨ NA¨
Designation:
Company Stamp:
Instructions:
Please ensure that in addition to providing the bank details above, we require that you provides us this
information on your letter head with your company stamp and signature of an authorized officer of your
company.
Approval / Rejection
Approval coding Certification No:
A. Approved Code: Score :
B. Approved subject to doc. review Date :
C. Rejected Designation
Approval ( To be signed)
Designation Signature Approved Date
Supply Chain Manager Yes ¨ No ¨
General Manager Yes ¨ No ¨
Entered to the system By
Section 3.0
Product Quality Questionnaire
Do you inspect/verify purchased materials and products prior to
acceptance?
Yes ¨ No¨ NA¨
Do you inspect/verify customer-supplied materials and products
prior to acceptance?
Yes ¨ No¨ NA¨
Is the inspection/verification status of materials, components and
work-in-progress identified throughout the manufacturing process?
Yes ¨ No¨ NA¨
Do you provide job & quality related training to your staff?
Yes ¨ No¨ NA¨
If Yes to the above ,do you maintain training records (Welders, NDT
operators etc.)
Yes ¨ No¨ NA¨
Is all inspection and testing equipment subject to formal calibration
procedures?
Yes ¨ No¨ NA¨
Do you have a formal procedure for the control of NC products?
Yes ¨ No¨ NA¨
Are all inspection/verification records retained and made available to
customers on request?
Yes ¨ No¨ NA¨
Do you Have formal process for the release of completed products
prior to dispatch?
Yes ¨ No¨ NA¨
Are you agreeable to an onsite survey to verify the information given
in this questionnaire?
Yes ¨ No¨ NA¨
Do you provide Material Certificates as per ISO 10204 3.1 B or
equivalent?
Yes ¨ No¨ NA¨
Designation:
Company Stamp:
Instructions:
Please ensure that in addition to providing the bank details above, we require that you provides us this
information on your letter head with your company stamp and signature of an authorized officer of your
company.
Approval / Rejection
Approval coding Certification No:
A. Approved Code: Score :
B. Approved subject to doc. review Date :
C. Rejected Designation
Approval ( To be signed)
Designation Signature Approved Date
Supply Chain Manager Yes ¨ No ¨
General Manager Yes ¨ No ¨
Entered to the system By