Professional Documents
Culture Documents
Visionary
Integrator Culture
REGIONAL
MASTERBUILDER
FINANCE
OPERATIONS SALES
1. Ensure project is 1. Timely service of LPOs 1. Economic Design of AAA 1. Cost Project budgets accurately. 1. Main conductor of the
delivered in conformance to respective sites. 2. Design AAA with regulatory 2. Exercise financial control during relay between TBC &
to project documents. 2. Delivery of precast requirements. Project execution. Flywheel.
2. Evaluate the project panels 3. Provide design insight 3. Conduct evaluations and 2. Ensure adoption and
Schedule and aligns with that meet strength spec. through project life. negotiations in the interests of enhancement of
Milestones. 3. Bed-to-Installation of 4. Design for sustainability. the client. procurement policies.
3. Project planning and precast elements. 4. Advise on project economics. 3. Identify and exploit value
scope control to align 4. Innovation of site to an 5. Conduct project cost autopsies. innovation opportunities.
with budgets. assembly ground. 6. Ensure adherence to material 4. Enhance construction site
4. Project documentation Schedules especially at controls
5. Create and lead the site procurement and execution.
Team.
1. Deliver scope to specified quality and 1. Maintain accurate records of the 1. Proper coordination and monitoring of 1. Ensure DOSH compliance of every
without defects. inventory on site and in the entry and exit points at site. workplace on sites.
2. Endeavor to highlight and exploit procurement system. 2. Interlinking local police in site activities 2. Offer regular training of health &
value engineering opportunities. 2. Ensure proper usage of materials and and incidents. safety matters to first responders on
3. Ensure commercial performance of booking of wastages. 3. Weekly security reports. site.
the contracts are maximized. 3. Ensure proper inspection of materials 4. Ensuring all support facilities such as 3. Ensure incidents are properly booked
4. Undertake an ambassadorial role before receiving in inventory and CCTV are working and in coverage of all with DOSH and follow up for
representing the clients' interests on rejecting defects. areas. reimbursement.
site. 4. Abide to procurement policies 5. Escalate incidents and thefts 4. Maintain a well-equipped first aid
5. Proper documentation off delivery accordingly. room on sites.
notes and invoices. 5. Have a regulatory safety officer
frequenting the sites.