EHSMSM/WORKS/446/4009 Rev No.

01 Effective Date: 16/10/2006


SAFE WORK PROCEDURE - FOR TENTATIVE JOB
(Performance Criteria – Perfection in job with no injury to persons or damage to property)
AIC Leader : PRATAP KR. SINHA
1. DEPARTMENT : ENGG. & PROJECT DOC. NO. : E&P/SAF-TSJ-LD#1&2 Long tom Area-Elect/EHSMS/SWP/4702
2. SECTION / LOCATION : LD-1, LD-2, Long tom Area NAME OF WORKING AGENCY : G.B. ENGINEERS
3. JOB TITLE : Misc. Electrical work D. O. NO. : 3700882605/109 dt. 09.06.2023
4. JOB DURATION : START DATE 09.06.2023 END DATE 30.06.2024 W. O. NO. : 4200001761/109 dt. 23.06.2021
Sl. Activities Hazards Safety Precautions Persons Condition of Tools/ Reference to document /
No. (Sequence of work) Responsible Tackles required criteria and remarks
Name & G P. No. OK / NOT OK
5) End-termination of Elect. shock * Tools must be inspected before use. OK SS/ELECT-01
cable * All wiring should be routed in proper way.
* Any joints of cable should be housed in junction box with proper
terminals. TSL
* Proper PPE (gloves, safety glasses etc. ) must be use. Mr. Anil Kumar
(Mob-9204750502)
6) Temp. Elect. Wiring Electrical shock ● Tools must be inspected before use. SS/ELECT - 01
Physical injury ● All electrical tools shall be insulated. Mr. S.F Hussain OK
● The equipment used for the temp. wiring must be in good and (Mob-9234511429)
working conditions.
● Proper PPE (gloves, safety glasses etc.) must be use.
7) Cable Diversion * Electric Shock * Absence of power to be ensured from source end with suitable power
detector device. OK SS/ELECT - 01
* Power cutting and positive isolation of feeder should be done if reqrd. SS/ENG - 01
* Falling from height * Do not step or put tension on nearby cables.
* if working at open height place must use safety belt(1.8m length with
double lanyard) G. B. Engineers
* Physical injury * Fall arrester must be used while climbing at height. P. Mandal
* Working area must be barricated. (Mob- 8603401650)
* Horizontal & vertical lifelines must be provided.
* Scaffolding must be provide at height work. S.K Paul
(Mob- 7209336162)

Dept. (E&P) TSL (Safety) G. B. ENGINEERS

Note : 1.This Safe Work procedure shall be prepared by owner department countersigned by Working agency / contractor’s representative and safety department.
2. Sequence of work shall involve step-by-step jobs. 3. All possible hazards including proximity hazards shall be identified
4. With the change of working conditions, the procedure shall be amended and persons shall be trained accordingly.
5. Review on status of implementation shall be done through task observation (Ref. Form # EHSMSM/WORKS/446/4008) and / or site severity audit
6. Before start of the job, induction shall be given to persons engaged at site by departmental and subsequent daily induction shall be given by Working agency / Contractor's representative