No Sequence of Work 1. Termination Cable Control - Prepare Tools to be used ( screw driver, cable cutter ) - Existing cable remove - New cable to be checked as per the before cable termination work. - Cable bends in the terminal boxes shall be big as possible. - If cable glands are used cables will be checked before the work starts. - Cable core markers to be firmly attached. - Before termination, insulation resistance check will be done. Interphase continuity check will also be done. - Pressure and compression terminals to be used, which shall be of correct size for the cable. - Terminals shall be connected. - Cable arrangement after the termination shall be neat and tidy - After completion of termination, insulation resistance check will be done. Interphase continuity check will also be done.
Equipment, tools and machinery to be used :
- Screw Driver - Cable cutter - Manual Hand Tool - Test pen
The chemical to be used :
Responsible Person/Supervisor for the activity
Prepared by DIDIN JAENUDIN (Foreman) Reviewed by R. ADI. P (Supervisor/Engineer) Approved by (Area Authority) Approved by PTW Team