WORK METHOD STATEMENT

Detail of Work Pulling Cable Power


Date 22 / 11 / 2023 Location Electrical Room 3

No Sequence of Work
1. Pulling Cable Control
- Preparation and checking of tool before use
- Checking the insulation resistance of the cable electrical before pulling use megger
- Make sure the cable is in good condition before pulling and connection cable
- Checking tools ( all tools must be good condition )
- Checking drawing ( make sure engineering ref )
- Cable pulling from CCB #1 Ground Floor To Electrical Room ( m/f )
- Remove unused cable scrap

Equipment, tools and machinery to be used :


- Multy meter
- Manual hand tools
- Dc lamps

The chemical to be used :

Responsible Person/Supervisor for the activity


Prepared by
DIDIN JAENUDIN
(Foreman)
Reviewed by
R. ADI. P
(Supervisor/Engineer)
Approved by (Area
Authority)
Approved by PTW
Team