Professional Documents
Culture Documents
D-03 Cargo Hold Inspection Report-English
D-03 Cargo Hold Inspection Report-English
Reason for inspection: Routine Maintenance or Inspection by 3rd Party Survey (Class, P&I, Suspected Damage
ship’s staff PSC, etc.)
Any outstanding recommendations / deficiencies or Class Conditions:
1. RESULT : Give assessment of condition of the specific section/area in the following 3 categories.
2. REMARK : Specify any additional explanatory comments related to the mentioned item (if Grade is Poor)
Notes:
RESULT: This column shall indicate an assessment of condition REMARK: Reference for any WORK DONE: This column is to be used for
as follows: comments. recording work carried out using the following
GOOD = Condition only with minor problems codes:
FAIR = Condition with local problems or general condition worst DATE: Use format 01 INSPECTED BY CLASS SURVEYOR
than good but better than poor. MONTH/YEAR, eg. 01/06 for 02 PARTLY RENEWED (GIVE DETAILS)
POOR = Condition with major problems in specific areas or work done. 03 RENEWED
general condition below acceptable levels. 04 CLEANED/GREASED
05 DESCALED
GENERAL REMARKS