You are on page 1of 1

NOW

AVAILA
BLE!

2019 Energy Code 2019 ENERGY


CODE

Permit Technician Checklists


Ace Title 24, Part

Resources
6
Permit Tech
Ene nician
Use this rgy Code Che Climate
cklist Zone 3
• Involveschecklist when
an entirely the project HVAC Sy
or split-
• Replacessystem)
new or comp is for an exis
ting ste Residen
tial m Altera
just
componen part of an HVAC
lete repla
cement HVACbuilding and eithe
system (indo r: tions*
* This check t) system (duct or/outdoo
list s, furnace, r units and
application is not intended air handler, ≥ 75% of
for a buildi to support heat exch ducting; for

These handy checklists help guide intake and evaluation of low-rise


ng permit. projects in
ESSENT which the anger, cond either pack
IALS enforcemen
t agency
ensing unit
or any refrig
aged
1. Does requires buildi erant-con
the project ng design
plans and taining
• The trigger Cali specification
project trigg fornia’s Buil s to be subm
itted with
• Exce
ptions that
ers Title 24, ding Ene the
do NOT trigg Part 6 (the Energy
rgy Effic
– Adding Code iency Stan
≤ 40 er Energy
Code inclu ) if it replaces or adds dards (Titl
uses minim ft of ducting anyw e 24, Part

residential permit applications for compliance with the 2019 Energy


um R-6 insula here in home de: to the exist 6)?
– Fixing or tion in uncon (except for ing HVAC
(For exam
changing
anything ditioned space garage). This syste m.
ple, fixing not s. ng is not ducti YES
2. Does or replacing included in the table associated NO
it meet the fans, moto below with an Addit
Energy Cod rs, belts and , including anyth ion and
e’s Require electrical ing
componen that is a “refrigeran
ments und ts will NOT
If project er the Pres trigger the t-containing device.”
and nothinchanges this – Equipment Therm

Code.
Mand criptive Energy Code
• New HVAC
g else… Efficiency A (Setb ostat Coolingatory Requiremen Approac )
≥ 75% New and ack &
or EMCS B
ts
Heating Air Filter h?
) HERS:
Ducts yes Loads C MERV-132” HERS:
• Add ≤
40 D Duct HERS: Prescriptive Requi
to existingft ducting yes
yes Leakage E Airflow Fan rements
Duct YES
• Add/replac HVAC no yes Rate F Effica HERS:
cy F Insulation G Refrigeran NO
ducted system e AC to no yes yes yes
if Addition if AC yes Charge H t
• Replace yes no if AC
furnace only yes no yes
• Replace yes no no no
room no no
heating/AC no yes
existing fuel unit using no yes

• Each checklist targets a common type of Residential Alteration


yes no no no
• Replace type no
< no yes no
ducting only75% no no
no no
• Replace no no no
≥ no
ducting only75% no no no
no no 9
Climate Zone
I
• Replace no no no
heatin no yes no
cooling equip g and
no Residential
ment no no
only yes
(no altere yes yes yes yes

Reroofing*
yes

project and uses a shared, quick-reference design to deliver three


d yes no
• Replace ducting) if AC

2019 ENERGY CODE


gas if AC no if AC yes
electric heat with no yes no
24, Part 6
•TitleRepla pump yes if ducted
Permit Technician list
ce gas yes no
electric resistwith
Ace no no
ance no
Energy Code Check
no yes

Resources
3. Are the if ducted and nothingwith more. no
necessa no l—
ry Prescrip Not allow
ed g §150.
existin roofing materia no
to be submitte
d the
r surface of the designperplans
If the proje specifications no
projecct…t: tivethe
formexterio and
2(b)G no

key areas of information:


list when Involvthe of, or recoats ent agency s inclrequires
uded with building
Use this check a new exist
es a ductearea on top
ing buildi d system
surface , or which the enforcem the perm
es, adds in adds/ it
• Replac Involves to supportng projects replac es AC, in Inclu de this form application
t is not intended a non-ducted an : ?
*This checklis CF1R-ALT-
replace AC
a building permit. in an exist system and does 02-E: Certifi 24, Part 6)?
application for Note: If the ing buildi NOT add/
ncy Standards cate of(Title
Compliance
YES NO
project involv ng Efficie
yCF1R there are
ESSENTIALS ** This is an electrronic es an AdditBuilding Energ -ALT-05-E: climate zones, for Alterations (with HERS
rnia’s ion onto a othercate
in Certifi YES NO
A – projec t trigge Califo form that home6along
24, Part
Energy Code) (Non-
(the with HERS9.
Zone of Compliance )**
1. Does the I See page
project trigger s Title
must be registered withinstallation
an HVAC in Climate ) for Residential
reroof 3 for notes. s involving Cool Roof Alteration, Alterations
• While a simple
a HERS Provid

– Project features that trigger the Energy Code


alternative in your
requirement er prior to
type of project
CF1R-ADD
no Energy Code §150.2(b)1I) n is necess ary for this
permi t applic ation. It can
paperwork
will be
(See Energy Code documentatio be used with tion. required.
no Energy Code compliance could require Cool Roof installa any clima
te zone.
Thismeans effect that

climate zone. a reach code in prior to permit
issuance.
may still have Reach Codes
program
your jurisdiction tly updated and should be verified the Statewide
• Be aware that are frequen 2019 Title jurisdiction, consult
These reach codes r a reach code applies in your Part 6 - Residential Climate Zone
24,
whethe 3 HVAC System
To determine /localenergycodes.com/.

– Corresponding Mandatory and Prescriptive requirements


• Alterations Permit
Technician Energy
online at https:/ Code Checklis
t
Page 1 of 4
2021-05-14

– Required energy compliance forms


2019 ENERGY CODE
Ace Title 24, Part 6
Permit Technician
Resources Energy Code Check
Climate Zone
11
list Residential
Use this check
list when the Simple Rem
• Opaque Envelo project involve
s one
conditioned spacepe: Alters the home’s raised or more of the following:
odels*

• Additional features include:


• Lighting: from unconditioned floor, attic ceiling
Replaces, alters space) , rafters or walls
• Ventilation: or adds any “perma – exterior or demisi
Refer to other Replaces or nently- ng (separates
Permit Technic adds kitchen hood; replace installed luminaires” within enclosed
* This checklis ian Checklists s, alters or adds the home or attache
application for not intended to support projectsif the project also include
t is bathroom d to its exterio
a building permit. in which the enforcem s Fenestration, exhaust system r
ent agency requires HVAC and
building design Water Heater Alterat
ESSENTIA LS plans and specifica ions
tions to be submitte

– Customization by Climate Zone


d with the
Opaque Envel
ope §150.0(a)(b)(c
1. Does the )(d)
project trigge
• The project r California’s
trigger Building Energy Efficie Edison Company (SCE),
and

opened up (made s Title 24, Part 6 (the Energy ncy(SDG&E®


Stand), ardsSouthern California
any of their
accessible) or Code) if the
San Diego Gas & Electric
Company
home’s raised
(Title
SDG&E,24,nor SCE — nor disclosed
Part
2. Does it meet rebuilt in the(PG&E), locatio
Electric Company
PG&E, SoCalGas, product,
floor, attic
n. Neither policy 6)?
or process
Pacific Gas and Utilities Commission.same n, method, for illustrative
Manded byCalifornia
and administer atory Energ
Public
without modificatio
and distributed n. used in ceiling
of any data, informatio
are intended endorsement,
, rafter
this document or imply its
or any
1)utility
All customers
joints, of the ymayCode
be used, copied, completeness or usefulness
lity for therequir
copyrights. Images does not constitute wall is YES NO
(SoCalGas®) rights penetra
is funded by California under the auspices that this document accuracy,
emen trademarks or rer or otherwise

– Frequently asked questions


tions
reserved, except and or responsibi ts?
to patents,
Gas Company andmustSCE. Allbe caulked any legal liabilityother trademark, manufactu
This program but not limited trade name,
Southern California
SDG&E, SoCalGasexpress or implied; or assumesany, gasket wned rights openin
including, gs
in thebybuildin
or services
© 2021 PG&E, any warranty, 2) Anyusealtered
will not infringe
ed,
privately-o
commercial products, r stripped or otherw g envelope that are potenti
weatheprocesses
employees makes or represents that its e herein to any walls,
specificraised
floors, al 1 of 1
in this document; or previou
appearanc
sly installed) to attic ceilings, and rafters ise sealed . source s of air leakagPage
Any reference e
purposes only. or favoring. the following must be Residential Zone 9 11
Reroofing Climate 2021-05- YES NO
recommendation
Opaque Envelo requirements Energy Code
in Checklist insulated (even if
pe Component 6 - Permit Technician order to comply:
insulation was
2019 Title 24, Part U-facto not
• Roof r
(area weighte
Attic Ceiling d average) R-value Section of Energy
Rafter Code;

– A list of direct links to applicable Energy Code sections,


≤ 0.043 (between wood Joint Appendix
• Wall (wood orA framing) JA4
framed): ≤ 0.054 ≥ R-22
2 x 4, above gradeB
≥ R-19 150.0(a); JA4.2.1
2 x 6, above grade
≤ 0.102 (between wood 150.0(a); JA4.2.2
• Wall (masonr orA framing)
y mass): ≤ 0.071 ≥ R-13
Above Grade,
insulation on ≥ R-20 150.0(c); JA4.3.1
Above Grade, interior
insulation on ≤ 0.077
Below Grade, exterior
insulation on ≤ 0.125 ≥ R-13

compliance forms and further topic resources


Below Grade, interior orA
• Raised Floor insulation on ≤ 0.077 ≥ R-8
exterior 150.1(c)1Bii;
(wood framed) C ≤ 0.200 ≥ R-13 JA4.3.6 and JA4.3.14
≤ 0.037 ≥ R-5
Lighting §150.0
(k)
orA
Climate
≥ R-19 Zone 6
150.0(d); JA4.4.1-
1. Does the
projec Residential 2
• The project t trigger California’s

E
trigger Energy
installed lighting s Energy Code when lumina Code (Title 24, Part 6)?
m Altera tions*
9 ENERGY COD ating Syste
” (luminaire types ire(s)
that are hardwi are altered, added or replace
Water-he
– The project
201 Title 24, Part 6 does NOT trigger red to the home d involvin
Permit Technician(such
outlet as a floor lamp). the Energy Code if it involve or any other structu g “permanently

• For each Climate Zone (1-16), you’ll find a checklist for the
Ace Energy Code Chec
klist s portable lighting re).
more.
nothindginto
YES NO

Resources
type – andplugge withathe
or different be submitted traditional
of the sameplans and specifications to
proje ct: – with another system
s building design
list when the ng system ment agency require
water-heati
Use this checkadds to, the existing projects in which the enforce
ces, or to support
• Repla st is not intende
d
6)?
24, Part

following Residential Alteration project types:


* This checkli a building permit. ards (Title YES NO
application
for
ency Stand is replaced
Energy Effici heating system
ESSENTIALS ’s Building s existing water
er California if the home’
project trigg Energy Code)
1. Does the 24, Part 6 (the oach? NO
t triggers Title
YES
to the home. riptive Appr regulations.
• The projecwater heater is added r the Presc nce Efficiency
or a new ’s Requ irements unde l and State Applia compliance will depen
d on
y Code atory FederaTitle 24,s for Prescriptive
meet the Energng system must meet Mand c requir2019 rios11below:
2. Does it
ement Part 6 - Residential
on scena

– Fenestration
Climate Zone
water-heati s.) Then, specifi the most comm Simple Remodels
First, the new section for more detail heater – see some of
Permit Technician Energy
Code Checklist
FAQ riptive
(See end of g and propo
sed water
Can projec
t use Presc Page 1 of 5
the type of existin ed with… Approach? 2021-07-15
And is replac
System Type ng system
is… YesA
ng water-heati tank) YesB
If the existi Gas (storage
YesC
e tank) Gas (tankless)
• Gas (storag e tank) No A

– Reroofing
Pump (storag
Electric Heat e tank) YesB
ance (storag
Electric Resist ss) YesC
tank or tankle
Gas (storage e tank)
Pump (storag YesD
ance (storage tank) Electric Heat
• Electric Resist e tank) YesA,B
ance (storag
Electric Resist Yes
Gas (tankless)
e tank) YesC
c (tankless) Gas (storag

– Water-heating Systems
• Gas or Electri e tank) NoA
Pump (storag
Electric Heat ss) YesD
ance (tankle
Electric Resist ss)
ance (tankle
ss) Electric Resist
• Gas (tankle E
ance (tankle
ss) bing Code
• Electric Resist of CA Plum
per §609.11 from tankless
Pipe Insulation sible Pipes
Only:
e tank, or hot
water pipes
Mandatory Existing Acces from the storag that is:
Locations – water pipes

– HVAC Systems
Required hot ¾”
of cold and ter less than
(1.5 meters) nominal diame lation system between storag
e tanks
ible 2019 ENERGY CODE
• First 5 feet hot water piping with a
tic hot water
(DHW ) recircu to storage tank; or
F

g source
• All access with the domes kitchen fixtures; heatin
– Associated
heating source
– From the water heating) Ace to Title 24, Part 6
Permit Technician g manual on/off Climate Zone 15
(indirect
– Buried below
grade Resources Energy Code Checkl use deman d recirculation
pumps shall All other control types
are
systems utilizinprescriptively.
not supported
Window & Sky Residential
n Pumps: recirculation ist
Recirculatio Usechange outs involving6 Reference Appendix
4.4).
YES NO light Alterations*

– Simple Remodels
this checkli n?
• Water heater st when the
24, Part it applicatio
• Alters
control pumps and/or adds fenestra project:ded with the perm
. (see Title
ERS)
*This checklist is forms tion
e to support inclu
(window s, skylights Altera tions (Non-H
applicatioPrescriptiv
not intended
Includeinthis
form: and/or glazing iance for
necessary n for a building permit. projects ate of Complin
enforcement agency doors) to the existing home
which the Certific
3. Are the CF1R- ALT-05-E: requires building design plans — and nothing more.
If the projec
t… heating
ESSEN existing water-
s to theTIALS
and specifications
to be submitted
Replac es/add with the
system only 1. Does
the project trigger
3 for notes.
page The California’s Buildin
A – F See project triggers g Energy Efficien Page 1 of 4
and/or glazing in Title 24, Part 6 (the Energy Code) cy Standards

Download them today at


Code Checklist
Technician Energy(Title 24, Part 6)? 2021-05
-10
opaque if changesSystem
area does not increase doors) to the existing house. 6itWater-hea Alterations Permit
ting or adds new fenestration
. l Climate ZoneThis includes replacin (windows, skylights
Part 6 - Residentia g a single window YES NO
Exceptions: 2019 Title 24, , even if fenestra
tion
• Replacing ONLY
window glazing,
trigger code. sash or both (framing
• Replacing fenestra remains ). If you don’t change
tion the frame it doesn’t
unconditioned garage associated with unconditioned

EnergyCodeAce.com/resources
a wall that separate and the outside would not triggerspaces. (For example, replacing
s two areas in an the code; neither a window between
2. Does it meet uncondi tioned garage.) would replacing a window an
the Energy Code’s that is in
Prescriptive requirem Requirements under
ents for fenestra
tion alterations in the Prescriptive
Climate Zone 15 Approach?
depend on type of
Replacing Fenestra project:
tion (No Increase U-FactorB YES
• Windows & Door in Area)D NO
SHGCB,C
Glazing — 75 ft2
• Windows & Door or less

For more on how to use these checklists as well as how they are
Glazing — More 0.40 or lower
• Skylights – any than 75 ft2
amount 0.30 or lower 0.35 or lower
0.55 or lower 0.23 or lower
0.30 or lower
Total
Increasing Fenestra U-FactorB FenestrationE Area West-facingF
tion AreaE SHGCB,C Area

structured, view our two short YouTube videos!


• Windows & Door (% of CFAA)
Glazing — 75 ft2 (% of CFAA)
• Windows & Door or less 0.30 or lower
Glazing — More 0.23 or lower
• Skylights – 16 2 than 75 ft2 0.30 or lower n/a
ft or less 0.23 or lower n/a
• Skylights – More 0.55 or lower 20% or lessG
than 16 ft2 0.30 or lower 5% or lessG
0.30 or lower n/a
3. Are the necess 0.23 or lower n/a
ary forms include 20% or lessG
5% or lessG
If the project… d with the permit
application?
Adds or replaces Include this form:
fenestration only
(in existing house) CF1R-ALT-05-E:
Certificate of Complian YES NO
Also uses averaged Residential Alteratio ce for Prescriptive
U-factor and SHGC ns (Non-HERS)
Also considers exterior valuesH CF1R-ENV-02-E:
SHGC requirementsI shading devices to meet Area Weighted Average
CF1R-ENV-03-E: Calculation Workshe
Solar Heat Gain et
Coefficient (SHGC)
A–I Worksheet
See page 3 for notes.

2019 Title 24, Part


6 - Permit Technician
Energy Code Checklist Residential
Window & Skylight
Alterations Climate Zone
15
Page 1 of 4
2021-07-13

This program is funded by California utility customers and administered by Pacific Gas and Electric Company (PG&E), San Diego Gas & Electric Company (SDG&E®) and Southern California Edison Company
(SCE) under the auspices of the California Public Utilities Commission.
© 2021 PG&E, SDG&E and SCE. All rights reserved, except that this document may be used, copied, and distributed without modification. Neither PG&E, SDG&E, nor SCE – nor any of their employees
makes any warranty, express or implied; or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any data, information, method, product, policy or process disclosed
in this document; or represents that its use will not infringe any privately-owned rights including, but not limited to patents, trademarks or copyrights. Images used in this document are intended for
illustrative purposes only. Any reference or appearance herein to any specific commercial products, processes or services by trade name, trademark, manufacturer or otherwise does not constitute or imply
its endorsement, recommendation or favoring.

You might also like