Cost Breakdown for NABL Test Lab Setup

The document provides an abstract of costs for establishing a specialized equipment test laboratory with associated office buildings and a hostel. It lists the civil works costs, a contingency charge, supervision charges, and the total amount in rupees.

Uploaded by

asimisonet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views2 pages

Cost Breakdown for NABL Test Lab Setup

The document provides an abstract of costs for establishing a specialized equipment test laboratory with associated office buildings and a hostel. It lists the civil works costs, a contingency charge, supervision charges, and the total amount in rupees.

Uploaded by

asimisonet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

ABSTRACT OF COST

Testing Equipment
Sr. No. Particulars Civil Works A
B
1 2 3 4

Establishment of NABL Accredited


Specialized Equipment Test
Laboratory (SETL) with associated
A 95522669.00 16674057.26
office, Project Management and
Monitoring Office Buildings with hostel
at 132KV Kathgodam, Haldwani

B Contingency Charge @3% of (A)


C Sub Total (A+B)

D Supervision Charges, Establishment & Audit Charges @


15% of (C)
E Sub Total(C+D)
F Say

D.A A.E.
Total Amount (Rs)
5

112196726.26

3365901.79
115562628.05

17334394.21

132897022.25

132897022.00

E.E.