This document outlines a homework assignment for a structural engineering course to take and submit photos of a road bridge in Budapest, with the exception of Danube bridges. Students must take general photos of the bridge and its surroundings, detail photos of different structural elements, and a selfie with the bridge. For each photo, students must indicate the date and specify the structural and non-structural elements. The assignment must be submitted as a PDF presentation by October 20th and contributes 10% to the student's final grade.
This document outlines a homework assignment for a structural engineering course to take and submit photos of a road bridge in Budapest, with the exception of Danube bridges. Students must take general photos of the bridge and its surroundings, detail photos of different structural elements, and a selfie with the bridge. For each photo, students must indicate the date and specify the structural and non-structural elements. The assignment must be submitted as a PDF presentation by October 20th and contributes 10% to the student's final grade.
This document outlines a homework assignment for a structural engineering course to take and submit photos of a road bridge in Budapest, with the exception of Danube bridges. Students must take general photos of the bridge and its surroundings, detail photos of different structural elements, and a selfie with the bridge. For each photo, students must indicate the date and specify the structural and non-structural elements. The assignment must be submitted as a PDF presentation by October 20th and contributes 10% to the student's final grade.
BME Department of Structural Engineering Name: ______________________
BMEEOHSAS43 BRIDGES AND INFRASTRUCTURES Homework 2021/22 fall
STRUCTURAL ELEMENTS OF BRIDGES
Take photos from a multi-span roadway bridge (Danube bridges are exceptions) located in Budapest: general photos containing the bridge and its surroundings, photos representing the details of different structural parts, selfie photo with the bridge. The date of the photos shall be presented regarding each photo. In the photos, indicate and specify the structural and non-structural elements of the bridge. Formal requirements Power Point (or similar) presenter program should be used. Submission in pdf format. Naming of file: HW#1_”Surname”_”First name”_”Neptun code”.pdf (example: HW#1_Jáger_Bence_BP1234). Revised version naming example: HW#1_Jáger_Bence_BP1234_Rev1 Contribution to final grade 10% Consulting teacher Dr. JÁGER Bence Deadline submission via Moodle (pdf document): 23:00 pm, 20 of October, 2022 (Thursday), repetition: 23:00 pm, 27 of October, 2022 (Thursday, repetition fee due). Budapest, September 15, 2022