You are on page 1of 1

GENERAL KEY PLAN: N

18.51 18.90 19.30 19.70 20.10 20.50 20.90 21.30 21.70 22.10 22.48 22.86 23.25 23.64 24.02 24.41 24.80 25.19 REFER
25.58 TO
25.96 SHEET
26.38 2 OF
26.81 8 27.24 27.68 28.11 28.55 28.98 29.42 29.85 30.27 30.69 31.08 31.46 31.87 32.27 32.68 33.09 33.50

18.66 19.05 19.45 19.84 20.24 20.64 21.04 21.44 21.84 22.23 22.61 22.99 23.38 23.76 24.15 24.54 24.93 25.32 25.71 26.10 26.52 26.95 27.39 27.82 28.26 28.69 29.13 29.57 30.00 30.42 30.85 31.28 31.71 32.10 32.50 32.90 33.31 33.72 QIBLA
N

18.81 19.20 19.60 19.99 20.38 20.78 21.18 21.58 21.98 22.36 22.74 23.12 23.50 23.89 24.28 24.67 25.06 25.45 25.84 26.22 26.66 27.10 27.54 27.97 28.41 28.84 29.28 29.71 30.14 30.57 31.00 31.43 31.86 32.29 32.72 33.12 33.53 33.93

18.95 19.35 19.74 20.13 20.53 20.92 21.32 21.72 22.12 22.50 22.88 23.26 23.63 24.02 24.41 24.80 25.19 25.57 25.96 26.37 26.81 27.25 27.68 28.12 28.55 28.99 29.42 29.86 30.29 30.72 31.15 31.58 32.01 32.44 32.87 33.31 33.73 34.14

19.10 19.49 19.88 20.28 20.67 21.06 21.46 21.86 22.25 22.63 23.01 23.39 23.77 24.15 24.54 24.92 25.31 25.69 26.08 26.51 26.96 27.39 27.83 28.27 28.70 29.14 29.57 30.01 30.44 30.87 31.30 31.73 32.17 32.60 33.04 33.47 33.90 34.32

19.24 19.64 20.03 20.42 20.82 21.21 21.61 22.00 22.38 22.76 23.14 23.52 23.90 24.28 24.66 25.04 25.43 25.81 26.22 26.66 27.10 27.54 27.98 28.41 28.85 29.28 29.72 30.16 30.59 31.02 31.46 31.89 32.33 32.76 33.20 33.63 34.07 34.49

19.39 19.78 20.17 20.57 20.96 21.35 21.75 22.13 22.51 22.89 23.27 23.65 24.03 24.41 24.79 25.17 25.55 25.93 26.36 26.80 27.25 27.69 28.12 28.56 29.00 29.43 29.87 30.30 30.74 31.18 31.62 32.06 32.49 32.93 33.36 33.80 34.23 34.66 NOTES:
1- ALL DIMESNIONS AND LEVELS ARE IN METER UNLESS OTHERWISE INDICATED.
2- COORDINATES ARE BASED ON UTM ZONE 36NORTH AND REFERENCE TO WGS1984

19.53 19.93 20.32 20.71 21.10 21.49 21.89 22.27 22.65 23.03 23.41 23.79 24.17 24.55 24.93 25.31 25.69 26.08 26.52 26.95 27.39 27.83 28.27 28.71 29.14 29.58 30.02 30.46 30.90 31.35 31.78 32.22 32.65 33.09 33.53 33.96 34.40 34.83
LEGEND: MARINA PLOT LIMIT

MARINA PLOT EXCAVATION AREA LIMIT

MARINA PLOT ALLOWABLE EXCAVATION AREA LIMIT


19.68 20.07 20.46 20.85 21.25 21.64 22.02 22.40 22.78 23.16 23.54 23.92 24.30 24.68 25.06 25.44 25.82 26.24 26.68 27.11 27.55 27.98 28.42 28.86 29.30 29.73 30.17 30.61 31.06 31.50 31.95 32.38 32.82 33.25 33.69 34.12 34.56 34.99
ENVIRONMENTAL ACCORD LIMIT

SHEET LIMIT

580.00 EXISTING CONTOUR MAJOR


19.82 20.21 20.60 20.99 21.38 21.77 22.15 22.53 22.91 23.29 23.68 24.06 24.44 24.82 25.20 25.58 25.96 26.40 26.84 27.27 27.71 28.14 28.58 29.01 29.45 29.89 30.33 30.76 31.21 31.66 32.11 32.55 32.98 33.42 33.85 34.29 34.72 35.16 581.00 EXISTING CONTOUR MINOR

PGL POINTS

CUT HATCH

19.97 20.35 20.74 21.13 21.52 21.91 22.29 22.66 23.05 23.43 23.81 24.19 24.57 24.95 25.33 25.71 26.12 26.56 26.99 27.43 27.86 28.30 28.73 29.17 29.60 30.04 30.48 30.92 31.37 31.82 32.27 32.71 33.15 33.58 34.02 34.45 34.89 35.33 FILL HATCH

TIE TO EXISTING

BOTTOM OF EXCAVATION

20.17 20.54 20.89 21.27 21.66 22.04 22.42 22.80 23.18 23.56 23.94 24.32 24.70 25.08 25.46 25.85 26.28 26.71 27.15 27.58 28.02 28.45 28.89 29.32 29.76 30.20 30.64 31.08 31.53 31.98 32.43 32.87 33.31 33.74 34.18 34.62 35.07 35.51
REFERENCE NUMBER DESCRIPTION
REFER TO SHEET 5 OF 8

REFER TO SHEET 7 OF 8
02-671000-0000100322-SPC-CIV-SHD-153007-DWG_01 GENERAL LAYOUT
20.39 20.76 21.10 21.45 21.81 22.18 22.56 22.93 23.31 23.69 24.07 24.45 24.83 25.21 25.60 26.00 26.43 26.87 27.31 27.74 28.18 28.61 29.05 29.48 29.92 30.35 30.80 31.24 31.69 32.14 32.59 33.04 33.48 33.92 34.36 34.80 35.24 35.69 0m 20m 40m 60m 80m

VISUAL SCALE 1:1000 @ A1


STAGE: 04A-MOBILIZATION & CONSTRUCTION
20.63 20.98 21.31 21.66 22.02 22.37 22.72 23.07 23.44 23.82 24.20 24.58 24.96 25.35 25.73 26.15 26.58 27.02 27.46 27.90 28.33 28.77 29.20 29.64 30.07 30.51 30.96 31.40 31.85 32.31 32.76 33.22 33.66 34.10 34.54 34.98 35.42 35.88

20.86 21.20 21.53 21.87 22.22 22.57 22.91 23.24 23.59 23.95 24.33 24.71 25.09 25.48 25.88 26.29 26.73 27.17 27.60 28.04 28.48 28.92 29.36 29.79 30.23 30.67 31.12 31.57 32.03 32.48 32.94 33.39 33.85 34.28 34.72 35.16 35.60 36.06
01 FOR APPROVAL-FIRST ISSUE O.R 19.10.2023
REV DESCRIPTION APP DATE
PURPOSE OF ISSUE:
21.09 21.42 21.74 22.06 22.43 22.78 23.10 23.41 23.76 24.14 24.47 24.83 25.24 25.63 26.03 26.43 26.87 27.31 27.75 28.19 28.63 29.07 29.51 29.95 30.38 30.84 31.30 31.75 32.21 32.66 33.12 33.57 34.03 34.47 34.91 35.35 35.80 36.25
SHOP DRAWING FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:
21.32 21.63 21.93 22.23 22.61 22.98 23.27 23.58 23.92 24.31 24.60 24.93 25.43 25.86 26.19 26.59 27.01 27.46 27.90 28.34 28.78 29.21 29.65 30.10 30.55 31.05 31.50 31.94 32.39 32.84 33.29 33.75 34.20 34.65 35.09 35.53 35.99 36.44

23.10 23.40 23.70 23.99 24.36 24.75 25.03 25.34 25.69 26.07 26.34 26.68 27.21 27.04 26.55 26.80 27.15 27.60 28.04 28.48 28.92 29.37 29.81 30.26 30.73 31.22 31.73 32.17 32.60 33.03 33.47 33.93 34.38 34.84 35.28 35.74 36.20 36.66

25.60 25.90 26.20 26.49 26.86 27.25 27.53 27.84 28.19 28.57 28.84 29.18 29.71 29.38 27.43 26.92 27.31 27.76 28.20 28.64 29.08 29.53 29.97 30.42 30.91 31.40 31.89 32.39 32.83 33.26 33.69 34.13 34.56 35.02 35.47 35.96 36.42 36.88

29.98 27.48 27.01 27.56 28.04 28.41 28.81 29.24 29.69 30.13 30.60 31.08 31.57 32.07 32.59 33.06 33.49 33.92 34.36 34.79 35.22 35.70 36.18 36.64 37.10 DESIGN/CONTRACTOR NAME & LOGO (s):

30.24 27.74 27.42 27.82 28.19 28.59 28.99 29.40 29.84 30.29 30.77 31.26 31.75 32.24 32.74 33.28 33.72 34.15 34.58 35.04 35.43 35.95 36.41 36.87 37.32 SAUDI PAN KINGDOM - SAPAC
FOR TRADING.,INDUSTRIAL &
CONSTRUCTION CO. LTD.
Riyadh 11481, P.O.Box 85153
www.sapac.com.sa
Kingdom of Saudi Arabia

30.61 28.11 27.57 27.97 28.37 28.76 29.16 29.56 30.00 30.46 30.95 31.44 31.92 32.41 32.91 33.42 33.95 34.39 34.89 35.31 35.76 36.27 36.69 37.11 37.54
SAPAC
DESIGN CONSULTANT/CONTRACTOR: NEOM'S REVIEW:
30.65 28.15 27.69 28.12 28.54 28.94 29.34 29.74 30.16 30.64 31.15 31.71 32.17 32.62 33.08 33.56 34.38 35.33 36.06 36.46 36.85 37.49 37.86 38.24 37.98 DRAWN: M.H 19.10.2023
CHECKED: ENG A.G 19.10.2023 CHECKED:
APPROVED: ENG. WALEED 19.10.2023 APPROVED:
30.86 28.36 27.93 28.35 28.74 29.13 29.52 29.91 30.39 30.95 31.50 31.96 32.40 32.85 33.29 33.76 35.40 37.41 38.38 38.95 39.36 39.99 40.36 40.74 40.37

SCALE: 1:1000 SHEET SIZE: A1


DISCIPLINE NAME:
31.03 28.52 28.13 28.58 29.01 29.40 29.79 30.24 30.74 31.30 31.75 32.19 32.63 33.08 33.52 33.98 35.81 38.31 42.57
Civil
DRAWING TITLE:
31.59 29.09 28.47 28.78 29.23 29.70 30.18 30.64 31.09 31.54 31.98 32.42 32.86 33.31 33.75 34.19 36.08 38.58
MARINA PLOT
EARTHWORK PROPOSED GROUND LEVELS
SHEET 7 OF 9
32.42 30.79 30.76 31.03 31.46 31.97 32.44 31.97 31.27 31.71 32.15 32.59 33.04 33.48 33.92 34.36 36.25 38.75
PROJECT NAME:
0000100322/053
ADVANCED ENABLING WORK
33.25 33.26 33.53 33.96 34.47 34.94 33.33 31.38 31.81 32.26 32.70 33.14 33.58 34.02 34.54 36.37 38.88 PHASE-01, NORTHERN GATEWAY DISTRICT
02-GULF OF AQABA
33.91 31.68 31.96 32.36 32.80 33.24 33.68 34.17 34.56 36.41 38.91
NEOM

34.03 31.83 32.19 32.55 32.90 33.34 33.80 34.25 34.65 36.51 39.01
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

34.27 32.83 33.23 33.63 ©34.02


2023 Microsoft
34.36 Corporation
34.84 35.33 © 2023 36.94
35.77 Maxar ©CNES
39.29 (2023) Distribution Airbus DS 02 671000 0000100322
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

SPC CIV SHD 153025 01

You might also like