This document is a checklist for inspecting a fencing and gates project at an MSV A-41406 area. It lists 9 tasks to check such as the fence post layout and installation, chain link and barbed wire installation, gate operation, and painting. The checklist is to be completed, approved by the contractor, and accepted by the PDO to confirm all inspection and test plans are fulfilled.
This document is a checklist for inspecting a fencing and gates project at an MSV A-41406 area. It lists 9 tasks to check such as the fence post layout and installation, chain link and barbed wire installation, gate operation, and painting. The checklist is to be completed, approved by the contractor, and accepted by the PDO to confirm all inspection and test plans are fulfilled.
This document is a checklist for inspecting a fencing and gates project at an MSV A-41406 area. It lists 9 tasks to check such as the fence post layout and installation, chain link and barbed wire installation, gate operation, and painting. The checklist is to be completed, approved by the contractor, and accepted by the PDO to confirm all inspection and test plans are fulfilled.
PROJECT DESCRIPTION LEKH_LEK_USEM LEK- F Ph-1- PROJECT ID No NOL0000L0868 B_11307587 SUB-SYSTEM Crude Gathering - MSV A-41406 - Civil SUB-SYSTEM No 17C-CL-01 DESCRIPTION TAG DESCRIPTION: MSV A-41406 - Fence and Grading TAG No: MSV A-41406 - Fence and Grading AREA Drawing No. LOCATION
No. Description of Task Signature OK N/A PL
1 Fencing Layout and Location is as per AFC drawings and specifications. 2 Type of fence post used & installation is as per AFC drawings and specifications. 3 Spacing of Fence Posts is correct as per AFC drawings and specifications. 4 Check all Fence Posts are vertical. 5 Check that the chain link fence is secure and correctly installed as per AFC drawings and specifications. 6 Check that the barbed wire installation is correct as per AFC drawings and specifications. 7 Confirm that all gates operate smoothly and the bolts operate correctly. 8 Confirm that the painting color is correct and are applied properly. 9 Confirm that all ITP and Quality Records are completed and accepted REMARKS / OBSERVATIONS:
Comments:
CONTRACTOR - COMPLETED By CONTRACTOR - APPROVED By PDO - ACCEPTED By