You are on page 1of 4

Makati Development Corporation Project: COG 4 Park Cascades

MDC Corporate Center Radian Street ARCA South Estate East Union Corner Link Street
Western Bicutan National Capital Region
Taguig, 1630
P: 0287590800

RFI #RFI-ALV01111-T1-AR-0218: PHASE 1/ GROUND FLOOR – ADMIN OFFICE -


REQUESTING FOR CODE/SPECIFICATIONS OF WALL/CEILING FINISHES
Status Open

To Peter Santos (VA) (Response Required) From Leslie Maglahus (Makati Development Corporation)
Clare Ann Diaz (Visionary Architecture, Inc.
(Visionarch))

Date Initiated Nov 8, 2023 Due Date Nov 28, 2023

Location Project Stage Course of Construction

Cost Impact Schedule Impact

Spec Section Cost Code

Drawing Number Reference

Linked Drawings

Received From ARNEL ASIS (Makati Development Corporation)

Copies To Crystal Acuna (Makati Development Corporation), Arvin Adayo (Makati Development Corporation), Alvin Agarin (Makati
Development Corporation), MICHAEL ANGELO ALICANDO (Makati Development Corporation), Glaiza Anticano (Makati
Development Corporation), Gleeco Atienza (Makati Development Corporation), Kayenina Barroga (Makati Development
Corporation), Aira Benitez (Makati Development Corporation), Teddy Borromeo (Makati Development Corporation), MARVIN
BUCU (Makati Development Corporation), Kristofer Cuaresma (Makati Development Corporation), Christal Damasco (Makati
Development Corporation), MARY-JO DATINGUINOO (Makati Development Corporation), ALDRIN DELA CRUZ (Makati
Development Corporation), Mark Bryan P. Delfino (Makati Development Corporation), ZYRA MICA DONES (Makati Development
Corporation), MICHAEL ESPIRITU (Makati Development Corporation), Ronnel Facunla (Makati Development Corporation),
Ralph John Francisco (Makati Development Corporation), Rachel Gile (Makati Development Corporation), CHRISTINE
GONZALES (Makati Development Corporation), Marinel Ilaya (Makati Development Corporation), Ike Enriquez Indong (Makati
Development Corporation), JOHN PRIMO JALIMAO (Makati Development Corporation), Roel Lacorte (Makati Development
Corporation), MINE HEART LIAD (Makati Development Corporation), Jan Antonette Liquigan (Makati Development Corporation)
, ALVIN MADRIAGA (Makati Development Corporation), Leslie Maglahus (Makati Development Corporation), Alberto Mendaño
(Makati Development Corporation), Janice Naz Nuñal-Jebulan (Makati Development Corporation), MC AVEGAIL ORDOÑEZ
(Makati Development Corporation), Arturo B. Pichay (Makati Development Corporation), Guane Aubrey Salazar (Makati
Development Corporation), Hilarion Sayson (Makati Development Corporation), NICOLE JANE SIL-AY (Makati Development
Corporation), Jastine Kent Tadiosa (Makati Development Corporation), AARON PAUL USON (Makati Development Corporation),
JESSA MARIE UY (Makati Development Corporation)

Activity

Question Question from Leslie Maglahus Makati Development Corporation on Wednesday, Nov 8, 2023 at 07:29 +08
Hi Ma'am Clare/Sir Peter,

Good day!
Please see attached RFI Document for your comment and signature

• RFI-ALV01111-T1-AR-0218 - PHASE 1/ GROUND FLOOR – ADMIN OFFICE -


REQUESTING FOR CODE/SPECIFICATIONS OF WALL/CEILING FINISHES

Thank you

Kind regards,
Leslie Maglahus | MDC

Attachments
RFI-ALV01111-T1-AR-0218.pdf

Makati Development Corporation Page 1 of 2 Printed On: Nov 28, 2023 16:40 +08
RFI #RFI-ALV01111-T1-AR-0218 - PHASE 1/ GROUND FLOOR – ADMIN
OFFICE - REQUESTING FOR CODE/SPECIFICATIONS OF Project: COG 4 Park Cascades
WALL/CEILING FINISHES

Awaiting an Official Response

Makati Development Corporation Page 2 of 2 Printed On: Nov 28, 2023 16:40 +08
ALVEO PARK CASCADES
REQUEST FOR INFORMATION
NOVEMBER 8, 2023
See VA response

Peter Santos
COG - REVIEW
CONTROL NUMBER
RFI-ALV01111-T1-AR-0218
DESCRIPTION
ITEM #1: KINDLY VERIFY THE COLOR,
DETAILS, SPECIFICATION AND TYPE
OF ACOUSTIC CEILING
BOARD AND FRAMING SYSTEMS

ITEM #2: REQUEST FOR


INFORMATION FOR CHB, RC DRY
WALL PAINT (COLOR CODE)

Floor Finish - Porcelain tiles - Verify


Client and APMC standards (if any)

Wall finish - Tulle white in semi gloss


paint finish with 1"x4" baseboard
LOCATION/FLOOR
same finish
PHASE 1/ GROUND FLOOR – ADMIN
OFFICE
Ceiling finish - for CM's verification
and budgetary cost qualification as KEYPLAN
per original considerations. For IDG
600x600 Acoustic direction on alignment with ADSG.
ceiling tiles in metal *(Admin Office) 600mm x 600mm
framing system. Acoustic Ceiling tiles as per ADSG
*(Security, FCC, Engineering Office)
Flat white painted finish - slab soffit
ADMIN/FCC/SECURITY OFFICE LAYOUT only to be confirmed with IDG
ARCHITECTURAL CB#2.A