You are on page 1of 50

WEEKLY ACTIVITY

DEPARTMENT : ENGINEERING
PERIODE : 1 - 7 FEBRUARI 2023

JENIS PEKERJAAN
No.
Activity Project Customer
1 Re Drawing PT DJABESMEN
Selectifier FC5
2 Daily report PT DJABESMEN
3 Re Drawing PT DJABESMEN
4 Drawing PT DJABESMEN
Hydrocrusher FC7
5 Daily report PT DJABESMEN
6 Estimasi PT DJABESMEN
7 Estimasi Bobin PT PRYSMIAN
8 Drawing PT DJABESMEN
Waste Disolver Tank FC5
9 Daily report PT DJABESMEN
10 Drawing Kontruksi Workshop CUM PT CUM
Remark Status

memberi lembar checksheet kolom pada gambar 100%


update kegiatan produksi on progress
memberi lembar checksheet kolom pada gambar 80%
Update posisi lay out terbaru 100%
update kegiatan produksi on progress
update harga 100%
update harga 100%
untuk support pekerjaan produksi , cutting plan dll on progress
update kegiatan produksi on progress
untuk proses produksi, talang, lay out, dll. on progress
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING
PERIODE : 8 - 14 FEBRUARI 2023

JENIS PEKERJAAN
No.
Activity Project Customer
1 Daily report WD TANK PT DJABESMEN
2 Daily report Hydrocrusher FC7 PT DJABESMEN
3 Daily report SELECTIFIER PT DJABESMEN
4 BOM, Drawing JALUR SEWER PM13 HDPE PT PINDODELI
5 BOM Bobin 255F PT PRYSMIAN
6 Drawing SELECTIFIER PT DJABESMEN
7 BOM Screen SS316 PT PLN NP Indramayu
8 Drawing Kontruksi Workshop CUM CUM
Remark Status

update kegiatan produksi on progress


update kegiatan produksi on progress
update kegiatan produksi on progress
membuat gambar untuk support pipa 100%
prepare untuk support kerja di lapangan 100%
modif cones bottom dan bracket 100%
screen 5 x 5 mm 100%
pembuatan Lay out workshop 100%
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 15 - 28 FEBRUARI 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Daily report WD TANK PT DJABESMEN delivery 100%
2 Daily report Hydrocrusher FC7 PT DJABESMEN update kegiatan produksi on progress
3 Daily report SELECTIFIER PT DJABESMEN update kegiatan produksi on progress
4 Drawing, BOM FRESH WATER TANK PT DJABESMEN gambar kerja 100%
5 Drawing, BOM AGITATOR CMT FC8 PT DJABESMEN gambar kerja on progress
6 design Jig Dies PT CUM gambar 100%
7 Drawing Kontruksi Workshop CUM CUM pembuatan Cannopy 100%
8 Drawing Ducting Line 1 & 2 PT NIPSEA pembuatan jalur ducting 50%
9 Drawing Condensate tank PT PAPERTECH redraw menunggu PO 100%
10 Drawing Workshop CUM PT CUM update gambar cannopy 100%
Survey pembuatan platform PT DJABESMEN platform acces point crane, tangga darurat diesel , & 100%
11 pipe bridge setling
12 Survey Perbaikan atap PT Indah Kiat Pulp & Paper Serang scopenya bongkar pasang atap, talang , & dinding 100%
13 Survey Frontal paner fender dermaga PT Indah Kiat Pulp & Paper Merak fabrikasi dan erection 100%
14 estimasi rak PT BRIDON update design dan harga 100%
15 estimasi Gear motor RS.1 PT DJABESMEN estimasi harga 50%
16 estimasi Platform acces point PT DJABESMEN estimasi harga 100%
17 estimasi tangga darurat diesel PT DJABESMEN estimasi harga 100%
18 estimasi penggantian atap PT Indah Kiat Pulp & Paper Serang estimasi harga 50%
No. JENIS PEKERJAAN Remark Status
Activity Project Customer
1 Daily report Hydrocrusher FC7 PT DJABESMEN delivery 100%

2 Daily report SELECTIFIER PT DJABESMEN delivery 100%

3 Drawing, BOM FRESH WATER TANK PT DJABESMEN gambar kerja 100%

4 Drawing mixing tank PT NIPSEA gambar on progress

5 design Jig Dies PT CUM konsultasi on progress

6 Drawing POPEREEL BAY DOOR ASSEMBLY PM2 PT PAPERTECH & PT PAPCORE gambar kerja 100%
POPEREEL BAY DOOR
7 BOM Aeration Shield PT PJB gambar 100%

8 Survey movable tanki PT Nipsea bikin baru dan repair finishing 100%

9 Survey Frontal paner fender dermaga PT Indah Kiat Pulp & Paper Merak fabrikasi dan erection 100%

10 estimasi modifikasi cut sillo tank PT DJABESMEN estimasi harga 100%

11 estimasi penggantian atap PT Indah Kiat Pulp & Paper Serang estimasi harga 100%

12 estimasi safety fence PT PRYSMIAN estimasi harga 100%

13 estimasi steel drum 201.203, PT KMI estimasi harga 100%

14 Estimasi Bobin Type G14-301 PT KMI estimasi kerja 10 type 100%

15 estimasi Bobin Type 1820,2000,2200 PT Bridon estimasi harga 17 type 100%

16 Estimasi New Conveyor Belt PT Cargill estimasi harga wirebelt conveyor 95%

17 estimasi moveble tank PT NIPSEA estimasi dan gambar 90%

18 estimasi mixing tank PT NIPSEA estimasi dan gambar 90%


WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 15 - 28 MART 2023

No. JENIS PEKERJAAN Remark Status


Activity Project Customer
1 Daily report SELECTIFIER FC 7 PT DJABESMEN report daily on progress

2 Daily report PNEUMATIC PT DJABESMEN delivery 100%

3 BOM Dewatering FC 4 PT DJABESMEN gambar kerja 100%

4 Drawing, BOM COVER, ROLLING PLATE, WEAR PT PLN NP UP INDRAMAYU BOM 100%
RESISTANT STEEL,
5 Drawing, BOM COVER HARDOX Trust wear PT PLN NP UP INDRAMAYU BOM 100%
protection
6 Drawing Plate hardox HB400 OD: 2350 MM, PT PLN NP UP INDRAMAYU BOM 100%
ID: 2257 MM, T: 4 MM, 1 SET = 4
SEGMENT
7 Drawing, BOM WEAR PLATE, 430 - 500 HB, PROFIL : PT PLN NP UP INDRAMAYU gambar kerja 100%
ORING FULL, OD: 1280 MM,
8 Drawing, BOM MOUNTING BRACKET MASONEILAN PT PAPERTECH gambar kerja 100%
STAINLESS PM1 PROJECT DRIVER
9 Drawing & Estimasi
Mixing dan movable Tank PT NIPSEA Estimisi dan gambar GA 100%
10 Drawing & Estimasi Routing main line ducting dan Drawing, revisi dan penambahan platform di dust
chimney 1 dan 2 PT NIPSEA collector 100%
11 Dust Collector, Blower Cap. 166
Estimasi m3/min Motor 20 HP PT DJABESMEN Estimasi, 90%
12 HANGER VC BOX MACHINE 1 DAN 2
Estimasi PT DJABESMEN Estimasi 85%
13
Estimasi Screw PT DJABESMEN Menunggu drawing dari Owner 0%
14 Penggantian Filter Silencer PA- FAN PT PLN NP UP INDRAMAYU
Estimasi 2A-2B Menunggu penjelasan drawing dari Owner 100%

15 PT PLN NP UP INDRAMAYU
Estimasi Perbaikan Filter Silencer FAN 3A Menunggu penjelasan drawing dari Owner 100%

16 MOUNTING BRACKET MASONEILAN


Crosscheck sample STAINLESS PM1 PROJECT DRIVER PT PAPERTECH CROSSCHECK SAMPLE & DRAWING 100%
17
Estimasi& Drawing Modular Belt Conveyor Radius PT Murotech Estimasi dan Design Drawing On Progress
18
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 29 Mei - 04 April 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Report Selectifier FC 7 PT DJABESMEN daily report on progrress

2 Drawing Layout Workshop PT CUM Prepare acara buka bersama on progrress

3 BOM, Drawing Rear Steel type 2200 BRIDON REVISI GAMBAR 100%
Estimasi, BOM,
4 Drawing Separator vacuum tank PM 1 PT PAPERTECH Gambar kerja ke lapangan 100%

5 Drawing Cover hardox 500 HB PT PLN NP UP Indramayu Gambar kerja ke lapangan 100%

6 Drawing Workshop CUM update gambar gerbang pintu 70%


Drawing,
7 Estimasi Modular radius PT MUROTECH Gambar GA 100%
Drawing,
8 Estimasi Screen filter PT PAPERTECH gambar 50%

9 Survey, estimasi Dust collector PT DJABESMEN survey 100%

10 Estimasi Pipa Connection PT PAPERTECH estimasi 60%

11 Estimasi Ducting, Chimney PT NIPSEA Breakdown BOQ 100%

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 5 April - 11 April 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Base plate protective upper
1 Drawing, BOM sealing system PT PLN NP UP Indramayu Gambar kerja 100%

2 Drawing, BOM Cruddle TYPE 2200 PT BRIDON Gambar kerja 100%

3 Drawing, BOM Electro Coalgulant PT PAPERTECH Gambar kerja 100%


Tube feed SH sootblowing
4 Drawing, BOM system PT PLN NP UP Rembang Gambar kerja 100%

5 BOM Lance tube PT PLN NP UP Rembang Kebutuhan material 100%

6 Report Selectifier FC 7 PT DJABESMEN Daily report progress on process

7 Estimasi Steel drum PND 630 PT BRIDON Estimasi Harga 100%

8 Estimasi Steel drum PND 760 PT BRIDON Estimasi Harga 100%

9 Estimasi Storage tank 5M³ PT DJABESMEN Estimasi Harga, gambar 50%

10 Estimasi Clamp for material PT PRYSMIAN Estimasi Harga on process

11 Estimasi Perbaikan bak DT PT MSS Estimasi Harga, gambar 60%

12 Estimasi Platform Mezzanine PT NIPSEA Estimasi Harga on process

13 Estimasi Dust Collector PT DJABESMEN Estimasi Harga 100%

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 12 April - 27 April 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Report Selectifier FC 7 PT DJABESMEN Daily report progress 100%

2 Drawing Workshop PT CUM Update drawing 100%


Estimasi, Storage tank 5M³
3 Drawing PT DJABESMEN Estimasi Harga, gambar 50%

4 Estimasi Clamp for material PT PRYSMIAN Estimasi Harga 100%

5 Estimasi Perbaikan bak DT PT MSS Estimasi Harga, gambar 100%

6 Estimasi Platform Mezzanine PT NIPSEA Estimasi Harga 100%

7 Estimasi Repair Linning PT IKS Estimasi harga 50%

8 Estimasi Platform water tank PT ETEX Estimasi Harga 50%

9 Estimasi Spreader beam PT ETEX Estimasi Harga 50%

10 Estimasi Spacer PT ETEX Estimasi Harga 50%

11 Estimasi Spacer pallet PT ETEX Estimasi Harga 50%

12 As built Sewer HDPE PT PINDODELI Drawing 100%

13

14

15

16

17

18

19

20

21

22

23

24

25

26
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 28 April - 16 May 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 BOM Knife Holder PT PAPERTECH Drawing to laser 100%
Estimasi,
2 Drawing, BOM SR 1900 (flat) PT BRIDON Drawing, update harga 100%

Penggantian jalur sewer PVC


3 Drawing Ke metal PM 13 (HDPE) PT PINDODELI 2 as built 100%

Pemindahan unit lifting table


4 Estimasi MC PT IFF Estimasi Harga 100%

5 Estimasi Spreader beam IOT PT ETEK revisi 80%

6 Estimasi Spreader beam PT JEL 100%


Survey &
7 estimasi Penggantian pintu chamber PT Indah Kiat Serang 100%
Survey & Penggantian pipa CS ke
8 estimasi SS304 PT FUCHS Estimasi Harga 100%

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 17 May - 23 May 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update gambar On Progress

2 Drawing Assy Manual Pay Off PT Prysmian Assy GA Drawing 80%

3 BOM, Lance tube soot blower PT PLN NP UP Indramayu BOM 100%


Survey & Perbaikan pipa limbah
4 estimasi (HDPE) PT PINDODELI 2 & 3 Estimasi Harga 100%

5 Estimasi Assy Manual Pay Off PT Prysmian Estimasi Harga 100%

6 Estimasi Base Manual Pay Off PT Prysmian Estimasi Harga 100%

7 Estimasi Bobin 381B PT KMS Estimasi Harga 100%

8 Estimasi Pusher Steel Reel PT Prysmian Estimasi Harga 100%

9 Estimasi Roller Tape WBT 3C3 PT Prysmian Estimasi Harga 100%

10 Estimasi Rack Finish Good KKM PT Prysmian Estimasi Harga 100%

11 Estimasi Stand Roller WBT PT Prysmian Estimasi Harga 100%

12 Estimasi Ladder Walkway PT Prysmian Estimasi Harga 100%

13

14

15

16

17

18

19

20

21

22

23

24

25

26
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 24 May - 30 May 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update gambar , jalur angin kompreso On Progress

2 BOM, Craddle type 2200 PT Bridon BOM 100%

3 BOM, Steel Rear 2000 PT Bridon BOM 100%

4 Survey & Estimasi Penggantian Main Rail PT RoyalBoard Survey & Estimasi 100%

5 Estimasi Doubling Spacer PT ETEX Estimasi Penambahan Spacer 100%

6 Estimasi Aquapro PT Papertech Estimasi 100%

7 Estimasi Solar Stair handrail PT Prysmian Estimasi 100%

8 Estimasi Stand Roller for Tape WBT PT Prysmian Estimasi 100%

9 Estimasi Guide Roller WBT PT Prysmian Estimasi 100%

10 Estimasi Base Forming Guide WBT PT Prysmian Estimasi 100%

11 Estimasi Forming Guide WBT PT Prysmian Estimasi 100%

12 Drawing Base Forming Guide WBT PT Prysmian drawing GA for Customer 100%

13 Estimasi Guide Stopper Bobbin PT Prysmian Estimasi 100%

14 Estimasi Stopper cradlle bobbin PT Prysmian Estimasi 100%

15 Estimasi Blade Crusher PT IFF Estimasi 100%

16 Estimasi Shaft Room Fowder R2 PT IFF Estimasi 100%

17 Drawing Frame packaging Lancetube PLN Rembang Drawing alat bantu delivery 100%

18 Drawing Solar Stair handrail PT Prysmian drawing GA for Customer 100%

19 Drawing Stand Roller for Tape WBT PT Prysmian drawing GA for Customer 100%

20 Estimasi Steel Drum Type 302A PT KMI Revisi Estimasi 100%

21 Estimasi Steel Drum Type 331B PT KMI Revisi Estimasi 100%

22

23

24

25

26
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 31 May - 06 June 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Survey, Drawing & Survey dan Pengukuran Aktual
1 Estimasi Spreader Beam PT Etex Beban Existing 60%

2 Survey & Estimasi Aquapro & Plate Bend PT Papertech Diskusi untuk rencana gambar 100%

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 24 May - 7 June 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update gambar , jalur angin kompreso On Progress

2 BOM, Craddle type 2200 PT Bridon BOM 100%

3 BOM, Steel Rear 2000 PT Bridon BOM 100%

4 Survey & Estimasi Penggantian Main Rail PT RoyalBoard Survey & Estimasi 100%

5 Estimasi Doubling Spacer PT ETEX Estimasi Penambahan Spacer 100%

6 Estimasi Aquapro PT Papertech Estimasi 100%

7 Estimasi Solar Stair handrail PT Prysmian Estimasi 100%

8 Estimasi Stand Roller for Tape WBT PT Prysmian Estimasi 100%

9 Estimasi Guide Roller WBT PT Prysmian Estimasi 100%

10 Estimasi Base Forming Guide WBT PT Prysmian Estimasi 100%

11 Estimasi Forming Guide WBT PT Prysmian Estimasi 100%

12 Drawing Base Forming Guide WBT PT Prysmian drawing GA for Customer 100%

13 Estimasi Guide Stopper Bobbin PT Prysmian Estimasi 100%

14 Estimasi Stopper cradlle bobbin PT Prysmian Estimasi 100%

15 Estimasi Blade Crusher PT IFF Estimasi 100%

16 Estimasi Shaft Room Fowder R2 PT IFF Estimasi 100%

17 Drawing Frame packaging Lancetube PLN Rembang Drawing alat bantu delivery 100%

18 Drawing Solar Stair handrail PT Prysmian drawing GA for Customer 100%

19 Drawing Stand Roller for Tape WBT PT Prysmian drawing GA for Customer 100%

20 Estimasi Steel Drum Type 302A PT KMI Revisi Estimasi 100%

21 Estimasi Steel Drum Type 331B PT KMI Revisi Estimasi 100%


Drawing &
22 estimasi Spreader Beam PT Etex Preliminary Design Spreader Beam 100%

23 Survey & Estimasi Aquapro & Plate Bend PT Papertech Diskusi untuk rencana gambar 100%

24 Estimasi Pusher steel drum cap.1 ton PT Prysmian Estimasi 100%

25 Estimasi Stopper Steel Drum Cap. 15Ton PT Prysmian Estimasi 100%

26 Estimasi Roll Reel PM1 PT Papertech Estimasi 100%

27 Estimasi Alat Pengupas Kabel Handstool PT Prysmian Estimasi 95%

28 Drawing Pusher steel drum cap.1 ton PT Prysmian drawing GA for Customer 100%

29 Drawing Stopper Steel Drum Cap. 15Ton PT Prysmian drawing GA for Customer 100%

30 Drawing Alat Pengupas Kabel Handstool PT Prysmian drawing GA for Customer 30%

31 Drawing Roll Reel PM1 PT Papertech drawing GA 30%

32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 8 June - 14 June 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing on progress

2 Drawing & BOM Bobin 255 F Bobin 350 B PT Prysmian design baru 100%

3 Drawing Ring pulley drum roll PT Papertech drawing 100%

4 Drawing & BOM Moudler Perbaikan Rail Dust PT Royalboard Drawing & BOM 100%
Collector
5 Drawing Spreader Beam PT Etex Preliminary Design 100%

6 BOM Plat Bend PT Papertech BOM 100%

7 Estimasi stopper adjuster PT Djabesmen estimasi 100%

8 Estimasi Mezzanine Plant APP PT Nipsea paint Revisi Estimasi (perubahan gambar) 100%

9 Estimasi Alat pengupas Kabel PT Prysmian estimasi 80%

10 Estimasi Alat Penggulung kupasan Kabel PT Prysmian estimasi 80%

11 Estimasi Scrap Bin Drum PT Prysmian estimasi 50%

12 Estimasi Structure Kontruksi PT Taiyo Sinar estimasi (mempelajari drawing) 5%

13 Estimasi Asah Grinding plate blade PT Putra Pile estimasi 100%

14 Estimasi Drilling High Speed Gabion Mesh PT Panalloy estimasi 100%

15 Drawing Alat pengupas Kabel PT Prysmian Preliminary Design 10%

16 Drawing Alat Penggulung kupasan Kabel PT Prysmian Preliminary Design 10%

17 QC Cradle DL2 SR 2000 PT Bridon QC 100%

18 QC Lance Tube Soot Blower PT PLN NP UP Indramayu QC 100%


Make Instruksi
19 Kerja Workshop PT CUM IK 100%

20 Survey/witness Structure Kontruksi PT Taiyo Sinar Survey at site Taiyo

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35
36

37
38
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 15 June - 21 June 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing on progress

2 Drawing Moudler Perbaikan Rail Dust PT Royalboard gambar kerja 100%


Collector
3 Drawing Plat Bend PT Papertech gambar kerja 100%

4 Drawing clamp primary arm PT Papertech gambar kerja 100%

5 Survey & Estimasi Instal Line Hydraulik PM8 PT Pindo Deli 2 Estimasi 80%
PT Peroksida Indonesia
6 Survey & Gambar Penggantian Jalur Pipa Temporary Pratama Drawing 50%

7 Estimasi Wage Structure Item 105.006 PT Taiyo Sinar Estimasi 100%

8 Estimasi Walkway Item 100.061 PT Taiyo Sinar Estimasi 100%


Inspection Walkway Item Item
9 Estimasi 100.106 PT Taiyo Sinar Estimasi 100%
Assembly Insp. Walkway Item
10 Estimasi 100.117 PT Taiyo Sinar Estimasi 100%
Mat&wage Insp.Walkway Item
11 Estimasi 100.117 PT Taiyo Sinar Estimasi 100%

12 Estimasi Lorri Class PT Owell Indonesia Estimasi 100%

13 Drawing Lorri Class PT Owell Indonesia Redrawing 20%


Soundroof cabin assembly UPZ 1250
14 Estimasi Item 100.155 PT Taiyo Sinar Estimasi on progress

15 Estimasi Steel Drum type 1600 Flat produksi PT KMI Estimasi on progress

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 22 June - 28 June 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing on progress

2 Drawing, BOM SR DL2 2000x900x1250 PT Bridon gambar kerja 100%

3 Survey Colling through JC3 PT Prysmian Estimasi 100%


Penggantian jalur Pipa Temporary ke PT Peroksida Pratama Drawing, menunggu review dan
4 Drawing Pipa Carbon Indonesia approval dari owner 100%
Stems Pneumatic Transport Pipeline
5 Estimasi 700.025 PT Taiyo Estimasi 100%
Handling system on overhead rai
6 Estimasi 150.005 PT Taiyo Estimasi 100%
Bracing for Columns on Discharge
7 Estimasi side 150.005 C2339 PT Taiyo Estimasi 100%

7 Estimasi Support Inspeksi strukture PT Taiyo Estimasi 20%

12 Estimasi For mixer 100.321 PT Taiyo Estimasi 100%


Assembly suspection walkway item
12 Estimasi 100.117 PT Taiyo Estimasi 100%

8 Estimasi Pipe Spool PT Santos Jaya Abadi Estimasi 50%

11 Estimasi Dismantling pressure tank PT Santos Jaya Abadi Estimasi 80%

9 Estimasi Steel Rear type 1200 PT Bridon Penawaran harga 100%

10 Estimasi Steel Rear type 1050 PT Bridon Penawaran harga 100%

13 Estimasi Steel drum type 3350 PT Prysmian Penawaran harga 100%

14 Estimasi Steel drum type 3750 PT Prysmian Penawaran harga 100%

15 Estimasi Roll pipe 1" PT Jaya Perkasa Estimasi 20%

16

17

18

19

20

21

22

23

24

25

26

27

28

29
30

31
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 29 June - 05 July 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing on progress

2 Drawing, BOM SR DL2 2000x900x1250 PT Bridon gambar kerja 100%

3 Drawing, survey Blade Grinding PT IFF Survey dimensional check existing 100%

4 Estimasi Support Inspection Structure For PT Taiyo Estimasi 100%


mixer 100.321
Test Separator, flare ko drum, gas
5 Proposal scrubber, air receiver, drain vessel & PT Tripatra membuat proposal semua tripatra 100%
water Tank

6 Estimasi Roll pipe 1" PT Jaya Perkasa Estimasi 100%

7 Revisi Estimasi Penambahan mezzanine Plant APP PT Nipsea Paint & Chemicals Revisi Estimasi 100%

8 Drawing & Spreader Beam PT Etex Drawing & Estimasi 100%


Estimasi
9 Estimasi Support structure and walkways PT Taiyo Estimasi 75%
700.081
10 Estimasi Revisi estimasi Lori Class PT Owell Indonesia Estimasi 100%

11 Estimasi Bobbin type 2000 Corrugated PT LSAG Estimasi 100%

12 Estimasi Bobbin type 1000 Corrugated PT LSAG Estimasi on progress

13 Estimasi Screen Filter PT O Well Indonesia Estimasi On progress

14 Estimasi Bucket Elevator PT Airindo Tekh.Perkasa Estimasi on progress

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 06 July - 11 July 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing layout , gerbang , on progress
paint room
2 Drawing, BOM bobbin 3350 PT Prysmian gambar kerja 100%

3 Estimasi Bucket Elevator PT Airindo Teknologi Perkasa Estimasi Hold

4 Drawing Pope Reel PT Papertech Drawing 100%

5 Estimasi Support structure and walkways PT Taiyo Estimasi 100%


700.081

6 Estimasi Silencer Support structure - FINE PT Taiyo Estimasi 100%


GRINDING - ITEM 100.511

7 Estimasi Handling system on overhead rail. PT Taiyo Estimasi 100%


Item 150.010

8 Estimasi Platforms assembly for ACM PT Taiyo Estimasi 100%


inspection and maintenance 100.511

Assembly of supporting structure


9 Estimasi and platforms for ACM 200 - Item PT Taiyo Estimasi 100%
100.511

10 Estimasi Closed Drain Vessel ABG-V-107 PT Tripatra Estimasi 100%


( OPA-FED-SYN-00-D1-DS-001 )

11 Estimasi Instrument Air Receiver ABG-TS-102 PT Tripatra Estimasi On progress


( OPA-FED-SYN-00-M0-DS-013 )

12 Estimasi LP Test Separator ABG-V-111( OPA- PT Tripatra Estimasi On progress


FED-SYN-00-M0-DS-019 )

13 Estimasi Open Drain Vessel ABG-109 ( OPA- PT Tripatra Estimasi On progress


FED-SYN-00-D1-DS-002 )

14 Estimasi Surge Vessel ABG-109 ( OPA-FED- PT Tripatra Estimasi On progress


SYN-00-M0-DS-023 )

15 Estimasi Utility Air Receiver ABG-TS-101 PT Tripatra Estimasi On progress


( OPA-FED-SYN-00-M0-DS-012 )

16 Estimasi Flare ko Drum (ABG-KOD-101) PT Tripatra Estimasi 100%

17 Estimasi Handling system on overhead rail. PT Taiyo Estimasi on progress


Item 150.005
18 Estimasi Rack Pallet PT Djabesmen Estimasi 100%

19 Estimasi Steel Drum type 3350 Flatness PT Prysmian Estimasi 100%

20 Estimasi Steel Drum type 3750 Corrugated PT Prysmian Estimasi 100%

21 Estimasi Jar Tank Cap. 57 Liter -25 Kg PT Ajinomoto Estimasi 100%

22 Estimasi Unit 4 ARP Inlet Spool Pipe PT Airindo Teknologi Perkasa Estimasi 100%

23 Estimasi Filter Screen Connection PT Hardanes Abadi Ind. Estimasi 100%

24 Estimasi HP Gas Scrubber (ABG-V-104) PT Tripatra Estimasi on progress

25

26

27

28

29
30

31

32

33
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 12 July - 19 July 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing layout , gerbang , on process
paint room
2 BOM Lance tube soot blower PT PLN NP UP Indramayu BOM dan gambar kerja 100%

3 Estimasi Repair Shaft Mesin Cage PT Prysmian Estimasi 100%

4 Estimasi HP Production Separator PT Tripatra Estimasi 100%

5 Estimasi HP Test Separator PT Tripatra Estimasi 100%

6 Estimasi LP Production Separator PT Tripatra Estimasi 100%

7 Estimasi Instrument Air Receiver ABG-TS-102 PT Tripatra Estimasi 90%

8 Drawing & Pekerjaan Roll Bucket Elevator PT Djabesmnen Drawing , Estimasi 100%
Estimasi

9 Estimasi LP Gas Scrubber Package PT Tripatra Estimasi 100%

10 Estimasi Impeller Blower SIMCA PT Pindodeli Estimasi 100%

11 Estimasi Pergantian Rail Autoclave PT Voith Estimasi 100%

12 Estimasi Leam Amine Surge Vessel PT Tripatra Estimasi 100%

13 Estimasi Amine Contactor ABG PT Tripatra Estimasi 100%

14 Drawing & Primary Separation Plant Area 100 Oder pak UU Mempelajari drawing & process on process
Estimasi

15 Estimasi Lori Class PT Owell Indonesia Revisi Estimasi 100%

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32
33

34
WEEKLY ACTIVITY
DEPARTMENT : ENGINEERING & ESTIMASI
PERIODE : 20 July - 26 July 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Drawing Workshop PT CUM Update drawing, gate utama , paint on process
room,
2 BOM Lance tube soot blower 3 unit PT PLN NP UP Indramayu BOM dan gambar kerja 100%

BLANKET DIA: 327X46mm, SHAFT


3 Drawing SUCTION PRESS ROLL, & INNER PT PAPERTECH gambar kerja 100%
HOUSING

4 Drawing Sleeve for Pipe PT Taiyo Drawing detail per Item 100%

5 Estimasi Utility Water Tank PT Tripatra Estimasi 100%

6 Estimasi Servis Water Tank PT Tripatra Estimasi on process

7 Estimasi Platform support Icing Sugar PT Samora Group Estimasi on process

8 Survei/Witness Primary Separation Plant Area 100 PT JMI-Jogya Gamasa Iron Mempelajari drawing & process on process

9 Estimasi Revisi SLEEVE for PIPE PT Taiyo Estimasi 100%

10 Estimasi Revisi Ring Pulley Dryer PM2 PT PAPERTECH Estimasi 100%

11 Estimasi Steel Drum Type 341 B Capacytas PT KMI Estimasi on process


beban 17 Ton

12 Estimasi Steel Drum Type 371 B Capacytas PT KMI Estimasi on process


beban 20 Ton
13 Estimasi Brine Line Supply & Return to MPS PT Petroksida Indonesia Estimasi 70%
Pratama
14 Survey & Estimas Repair Rail Auto Clave PT Voith Diskusi dengan Tim dan Welding 70%
Engineer
15 Estimasi Pekerjaan Roll Bucket Elevator PT Djabesmen Estimasi 100%

16 Estimasi AGT Blade Vate FC6 PT Djabesmen Estimasi 100%

17 Survey & Estimas Bench Icing Sugar PT SUJ Estimasi 100%

18 Survey & Estimas Lemari Transit Room Icing Sugar PT SUJ Estimasi 50%

19 Survey & Estimas Platrform - 1 PT SUJ Estimasi 50%

20 Survey & Estimas Platrform - 2 PT SUJ Mempelajari drawing & estimasi 25%

21

22

23

24

25

26

27

28

29

30

31

32
33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 04 Oktober - 11 Oktober 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Spacer Pallet 2580 x 1340 x 60mm PT ETEX Pengecekan Flatness
ran Dimensi
2 Pengecekan&penguku Flange LH Impeller Fan IDF CV SUS Pengeceken Laser Dimensi Finish Cutting
ran Dimensi

3 Pengecekan&penguku Flange RH Cone Impeller Fan IDF CV SUS Pengeceken Laser Dimensi Finish Cutting
ran Dimensi

4 Pengecekan&penguku Flipper Impeller Fan IDF CV SUS Pengeceken Laser Dimensi Finish Cutting
ran Dimensi

5 Pengecekan&penguku Feeding Screw Conveyor PT Papertech Pengecekan Dimensi & Pitch Delivery
ran Dimensi

6 Pengecekan&penguku Steel Drum Type 3550 PT Prysmian Pengecekan Dimensi 2 units Delivery
ran Dimensi
7 Pengecekan&penguku Steel Drum Type 255F Flatness PT Prysmian Pengecekan Dimensi 3 units Delivery
ran Dimensi
8 Pengecekan&penguku Steel Drum Type G15 PT Bridon Bekaert Pengecekan Dimensi 1 Unit wait Painting
ran Dimensi

9 Pengecekan&penguku Spacer Pallet 2580 x 1340 x 60mm PT ETEX Pengecekan Flatness 11 Units for weld
ran Dimensi

10 Pengecekan&penguku Tiang Penangkal Petir Tinggi 17,7 Meter PT CUM Pembuatan Support Painting Repair
ran Dimensi

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 12 Oktober - 18 Oktober 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Spacer Pallet INOX 2580 x 1340 x 60mm PT ETEX Pengecekan Flatness 17 units 17 unit
ran Dimensi
2 Pengecekan&penguku Dudukan Bearing Vacuum CV SUS Pengeceken Laser Dimensi Finish Cutting
ran Dimensi

3 Pengecekan&penguku Meja Kerja Workshop CV SUS CV SUS Pengeceken Laser Dimensi Finish Cutting
ran Dimensi

4 Pengecekan&penguku Inspeksi Impeller Fan IDF CV SUS Pengeceken Laser Dimensi Finish Cutting
ran Dimensi

5 Pengecekan&penguku Encorder PT Papertech Pengecekan Dimensi & Pitch Delivery


ran Dimensi

6 Pengecekan&penguku Gerbang Utama dan Pintu PT CUM Pengecekan Dimensi 2 units Pasang
ran Dimensi
7 Pengecekan&penguku Pengecekan Kedatangan Material PT CUM Pengecekan Dimensi & Qty.
ran Dimensi
8 Pengecekan Welding Pengecekan Welding Pallet ICBP CV SUS Pengecekan Welding 2 unit Painting

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 19 Oktober - 25 Oktober 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Spacer Pallet INOX 2580 x 1340 x 60mm PT ETEX Pengecekan Welding Siku 40- 17 unit
ran Dimensi Selesai 6 units
2 Pengecekan&penguku Pembuatan Meja dan Kursi Karyawan PT CUM semua baru di Fitup belum 6 unit meja&kursi
ran Dimensi dilakukan welding

3 Pengecekan&penguku Rack Size 400 x 1000 x 1900 mm PT Djabesmen pengerjaan Fit Up 3 unit Total 10 units
ran Dimensi

4 Pengecekan&penguku
ran Dimensi

5 Pengecekan&penguku
ran Dimensi

6 Pengecekan&penguku
ran Dimensi
7 Pengecekan&penguku
ran Dimensi
8 Pengecekan Welding

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 25 Oktober - 01 Nopember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Spacer Pallet INOX 2580 x 1340 x 60mm PT ETEX Pengecekan Welding Siku 40- 17 unit
ran Dimensi Selesai 6 units
2 Pengecekan&penguku Pembuatan Meja dan Kursi Karyawan PT CUM semua baru di Fitup belum 6 unit meja&kursi
ran Dimensi dilakukan welding

3 Pengecekan&penguku Rack Size 400 x 1000 x 1900 mm PT Djabesmen pengerjaan Fit Up 3 unit Total 10 units
ran Dimensi

4 Pengecekan&penguku
ran Dimensi

5 Pengecekan&penguku
ran Dimensi

6 Pengecekan&penguku
ran Dimensi
7 Pengecekan&penguku
ran Dimensi
8 Pengecekan Welding

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 02 Nopember - 09 Nopember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Spacer Pallet INOX 2580 x 1340 x 60mm PT ETEX Pengecekan Welding Siku 40- 17 unit
ran Dimensi Selesai 6 units
2 Pengecekan&penguku Pembuatan Meja dan Kursi Karyawan PT CUM semua baru di Fitup belum 6 unit meja&kursi
ran Dimensi dilakukan welding

3 Pengecekan&penguku Rack Size 400 x 1000 x 1900 mm PT Djabesmen pengerjaan Fit Up 3 unit Total 10 units
ran Dimensi

4 Pengecekan&penguku
ran Dimensi

5 Pengecekan&penguku
ran Dimensi

6 Pengecekan&penguku
ran Dimensi
7 Pengecekan&penguku
ran Dimensi
8 Pengecekan Welding

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 09 Nopember - 15 Nopember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Pengecekan&penguku Pengecekan Welding Siku 40-
1 ran Dimensi Absorber Vibrating Screen PD PT PINDODELI Selesai 6 units 24 Pcs
Pengecekan&penguku Pengecekan proses
2 ran Dimensi Jasa Perbaikan Cylinder Vat 1250 Cyl Vat FC8 PT Djabesmen pembongkaran 1 Unit

3 Pengecekan&penguku Screw Conveyor THO PT Cahaya gunung Pengecekan dimensi for delivery 1 unit
ran Dimensi Foods

Pengecekan&penguku Pengecekan dimensi dan


4 ran Dimensi Rack Wip Printing 3 Tingkat CV SUS welding 3 item

5 Pengecekan&penguku Tube Sheet M Soot Blower System 52x60x7968 PLN Rembang Pengecekan dimensi dan 10 pcs
ran Dimensi welding

6 Pengecekan&penguku Pengecekan Incoming Material All Project Pengecekan dimensi & jumlah
ran Dimensi
7 Pengecekan&penguku
ran Dimensi
8 Pengecekan Welding

10

11

12

13

14

15

16

17

18

19

20
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 16 Nopember - 22 Nopember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Pengecekan&penguku Pengecekan dimensi dan
1 ran Dimensi Rack Wip Printing 3 Tingkat CV SUS welding 4 item
Pengecekan&penguku Pengecekan proses
2 ran Dimensi Jasa Perbaikan Cylinder Vat 1250 Cyl Vat FC8 PT Djabesmen pembongkaran 1 Unit

Pengecekan&penguku
3 Back Cuci Cylinder PT Djabesmen Pengecekan dimensi dan welding 1 unit
ran Dimensi

Pengecekan&penguku Pengecekan dimensi dan


4 ran Dimensi Bobbin 255F Flatness PT Prysmian welding 2 Unit

5 Drawing & Estimasi Melting Asphalt Machine PT Solusi Putra GA drawing & Estimasi 1 Item
Bangsa

6 Pengecekan&penguku Lance Tube & Feed Tube PLN Rembang Pengecekan dimensi dan 10 Item& 10 Item
ran Dimensi welding
7 Drawing & Estimasi Mesin Crusher Alumunium Scrapper PT Harapan Baru GA drawing & Estimasi 1 Item
Sejahtera
8 Estimasi Bobbin Type 228F Corugated PT Prysmian membantu Estimasi 6 Unit

9 Estimasi Bobbin Type 255F Corugated PT Prysmian membantu Estimasi 35 Unit

10 Estimasi Bobbin Type 258C Corugated PT Prysmian membantu Estimasi 30 Unit

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34
35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 23 Nopember - 29 Nopember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Absorber Vibrating Screen PD PT PINDODELI Pengecekan Welding Siku 40- 24 Pcs
ran Dimensi Selesai 6 units
2 Pengecekan&penguku Jasa Perbaikan Cylinder Vat 1250 Cyl Vat FC8 PT Djabesmen Pengecekan proses 1 Unit
ran Dimensi pembongkaran

3 Pengecekan&penguku Screw Conveyor THO PT Cahaya gunung Pengecekan dimensi for delivery 1 unit
ran Dimensi Foods

4 Pengecekan&penguku Rack Wip Printing 3 Tingkat CV SUS Pengecekan dimensi dan 3 item
ran Dimensi welding

5 Pengecekan&penguku Tube Sheet M Soot Blower System 52x60x7968 PLN Rembang Pengecekan dimensi dan 10 pcs
ran Dimensi welding

6 Pengecekan&penguku Pengecekan Incoming Material All Project Pengecekan dimensi & jumlah
ran Dimensi
7 Pengecekan&penguku
ran Dimensi
8 Pengecekan Welding

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
32

33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 30 Nopember - 06 Desember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Rack Wip Printing 3 Tingkat CV SUS Pengecekan dimensi dan 3 item
ran Dimensi welding
2 Pengecekan&penguku Tube Sheet M Soot Blower System 52x60x7968 PLN Rembang Pengecekan dimensi, welding 10 pcs
ran Dimensi dan kelurusan

3 Estimasi Bobbin Type 2200 PT Bridon Bekaert membantu Estimasi dari form 1 Unit
lama ke yang form baru

4 Estimasi Bobbin Type G14, G15, G16, G17, G18, G18S, G18SS, PT Bridon Bekaert membantu Estimasi dari form 1 Unit
G19, G20, G21 lama ke yang form baru

5 Estimasi Bobbin Type S1 S2, S3, S4, S5, S6, S7, S8, S9, S10 PT Bridon Bekaert membantu Estimasi dari form 1 Unit Belum
lama ke yang form baru selesai

6 Estimasi Bobbin Type 1900x900x1330 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit Belum
lama ke yang form baru selesai
7 Estimasi Bobbin Type 1950x850x1350 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit Belum
lama ke yang form baru selesai
8 Estimasi Bobbin Type 1350x500x710 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit Belum
lama ke yang form baru selesai

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32
33

34

35
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 06 Nopember - 13 Desember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
1 Pengecekan&penguku Bobbin Type 2100 PT PRYSMIAN Pengecekan dimensi dan 6 item
ran Dimensi welding

2 Estimasi Bobbin Type S1 , S2 , S3, S4 PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru

3 Estimasi Bobbin Type 1950 x 850 x 1350 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru

4 Estimasi Bobbin Type 1350 x 500 x 710 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru

5 Estimasi Bobbin Type 1850 x 800 x 1050 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru
6 Estimasi Bobbin Type 1800 x 800 x 1330 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru
7 Estimasi Bobbin Type 2200 x 960 x 1600 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru

8 Estimasi Bobbin Type 2000 x 900 x 1250 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit Belum
lama ke yang form baru selesai

9 Estimasi Bobbin Type 18520 x 900 x 1150 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit Belum
lama ke yang form baru selesai

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32
33

34
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 14 Desember - 20 Desember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Pengecekan&penguku Pengecekan dimensi dan
1 ran Dimensi Bobbin Type SR 219E PT PRYSMIAN welding 6 Units

membantu Estimasi dari form


2 Estimasi Bobbin Type 2000 x 960 x 1320 mm PT Bridon Bekaert lama ke yang form baru 1 Unit selesai

membantu Estimasi dari form


3 Estimasi Bobbin Corrugated SR 2000 x 900 x 1250 mm DL2 PT Bridon Bekaert lama ke yang form baru 1 Unit selesai

membantu Estimasi dari form


4 Estimasi Bobbin Corrugated SR 2200 x 960 x 1600 mm DL4 PT Bridon Bekaert lama ke yang form baru 1 Unit selesai

5 Estimasi Bobbin Corrugated SR 1820 x 900 x 1150 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru
membantu Estimasi dari form
6 Estimasi Bobbin Type 900 x 620 mm PT Bridon Bekaert 1 Unit selesai
lama ke yang form baru
membantu Estimasi dari form
7 Estimasi Bobbin Type 1350 x 500 x 710 mm PT Bridon Bekaert lama ke yang form baru 1 Unit selesai

8 Estimasi Bobbin Type G18 1500 x 650 x 930 mm PT Bridon Bekaert membantu Estimasi dari form 1 Unit selesai
lama ke yang form baru

9 Pengecekan&penguku
Pengecekan dimensi dan
ran Dimensi Assy blade agitator WD PT PRYSMIAN welding 1 Unit

10 Pengecekan&penguku
Pengecekan dimensi dan
Bucket Elevator CV SUS
ran Dimensi welding
Pengecekan&penguku Pengecekan dimensi dan
11 ran Dimensi Meja Laboratorium PT. PEJALINDO welding 1 Unit

12 Estimasi Revisi Cladding Dinding Tanki PT CKC membantu Estimasi 1 Unit selesai

13 Estimasi PILE SHOES PT PINDODELI membantu Estimasi 1500 PCS

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 22 Desember - 27 Desember 2023

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Pengecekan speck belum semua dtg
1 material Incoming Material PT Papertech Projeck Conveyor material
Pengecekan speck
2 material Incoming Material PT KMI Bobbin 391B

Pengecekan speck
3 material Incoming Material PT Taiyo Sinar Screw Conveyor

Jasa Rebushing Housing Bearing Motor Travelling


4 Pengecekan Dimensi Screen & Discontinue WWTP PT PLN Indramayu Cek Dimensi hasil Spray Metal

5 Recheck Report cek drawing Plummer Block Housing Bearing PT PLN PUSHARLIS Cek Dimensi hasil QC 11 Item
Drawing GA dan breakdown
6 Drawing Steel Drum Type 226N PT KMI detail ada 11 units

7 Membantu data Mix Muller PT CKC Drawing dan estimasi yang dulu

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 28 Desember 2023 - 03 January 2024

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Pengecekan speck belum semua dtg
1 material Incoming Material PT Papertech Projeck Conveyor material
Pengecekan speck
2 material Incoming Material PT KMI Bobbin 391B

Pengecekan speck
3 material Incoming Material PT Taiyo Sinar Screw Conveyor

Jasa Rebushing Housing Bearing Motor Travelling


4 Pengecekan Dimensi Screen & Discontinue WWTP PT PLN Indramayu Cek Dimensi hasil Spray Metal

5 Recheck Report cek drawing Plummer Block Housing Bearing PT PLN PUSHARLIS Cek Dimensi hasil QC 11 Item
Drawing GA dan breakdown
6 Drawing Steel Drum Type 226N PT KMI detail ada 11 units

7 Membantu data Mix Muller PT CKC Drawing dan estimasi yang dulu

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34
WEEKLY ACTIVITY
DEPARTMENT : QC / QA
PERIODE : 04 January - 10 January 2024

JENIS PEKERJAAN
No. Remark Status
Activity Project Customer
Pengecekan speck belum semua dtg
1 material Incoming Material PT Papertech Projeck Conveyor material
Pengecekan speck
2 material Incoming Material PT KMI Bobbin 391B

Pengecekan speck
3 material Incoming Material PT Taiyo Sinar Screw Conveyor

Jasa Rebushing Housing Bearing Motor Travelling


4 Pengecekan Dimensi Screen & Discontinue WWTP PT PLN Indramayu Cek Dimensi hasil Spray Metal

5 Recheck Report cek drawing Plummer Block Housing Bearing PT PLN PUSHARLIS Cek Dimensi hasil QC 11 Item
Drawing GA dan breakdown
6 Drawing Steel Drum Type 226N PT KMI detail ada 11 units

7 Membantu data Mix Muller PT CKC Drawing dan estimasi yang dulu