CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 13 DATE: 28/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°3
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°3
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°3
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°3
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: BYRON RODRIGUEZ NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 08 DATE: 28/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°4
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°4
UT butt joint B-U2-GF X INF 4 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°4
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°4
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 03 DATE: 28/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°12
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°12
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°12
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°12
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 02 DATE: 28/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°10
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°10
UT butt joint B-U2-GF X INF 4 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°10
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°10
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 01 DATE: 28/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°14
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°14
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°14
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°14
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 10 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°07
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°07
UT butt joint B-U2-GF X INF 4 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°07
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°07
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Check with guide connector

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 09 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°1
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°1
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°05
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°05
UT butt joint B-U2-GF X INF 4 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°05
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°05
UT butt joint B-U2-GF X INF 5 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Check with guide connector

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 19 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°3
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°3
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°08
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°08
UT butt joint B-U2-GF X INF 1 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°08
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°08
UT butt joint B-U2-GF X INF 7 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 20 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°3
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°3
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°09
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°09
UT butt joint B-U2-GF X INF 4 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°09
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°09
UT butt joint B-U2-GF X INF 7 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 17 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°16
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°16
UT butt joint B-U2-GF X INF 1 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°16
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°16
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 15 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°19
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°19
UT butt joint B-U2-GF X INF 1 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°19
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°19
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 11 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°15
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°15
UT butt joint B-U2-GF X INF 2 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°15
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°15
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 06 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°11
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°11
UT butt joint B-U2-GF X INF 2 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°11
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°11
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 07 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°11
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°11
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°11
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°11
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 18 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°13
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°13
UT butt joint B-U2-GF X INF 1 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°13
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°13
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 12 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°17
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°17
UT butt joint B-U2-GF X INF 2 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°17
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°17
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 16 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°01
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°01
UT butt joint B-U2-GF X INF 2 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°01
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°01
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 14 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°02
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°02
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°02
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°02
UT butt joint B-U2-GF X INF 6 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 04 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°14
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°14
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°14
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°14
UT butt joint B-U2-GF X INF 7 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE:


CHECK LIST PILE MANUFACTURING

Project: CGSA BERTH 1A DEEPENING AND UPGRADE, GUAYAQUIL-ECUADOR


Service: COMBI-WALL SYSTEM INSTALLATION
Client: CONTECON GUAYAQUIL

FOLLOWER 05 DATE: 29/11/2019


FOLLOWER 18.00 M
YES NOT I/P REMARKS
Connector cut for income of guide of pile driving hammer X
Reinforcement plate for pile driving X
Visual Testing for plates X
Penetrant Testing for plates X PTR-Informe N°2
1 1/2" eyebolt for pile hoist X
Visual Testing for eyebolts X
Penetrant Testing for eyebolts X PTR-Informe N°2
Welding connectors X
Clean of endsides of connectors with buril X
Making bevel to weld butt welding X
Butt joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°06
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°06
UT butt joint B-U2-GF X INF 3 UT

PILE 34.50 M
YES NOT I/P REMARKS
Fix bevel to butt joint X
Butt Joint B-U2-GF X
VT butt joint B-U2-GF X VTR-20-Reporte N°06
Butt joint back welding B-U2-GF X
VT Bbutt joint back welding B-U2-GF X VTR-20-Reporte N°06
UT butt joint B-U2-GF X INF 7 UT
Connector alignment X
Connector end cleaning X
Connector welding between follower and kingpile X
15 cm without weld between follower and kingpile X
Eyebolts for internal maneuvering of the pile X
Piles slag cleaning X
Pile marking X
Connector enabled for guide pile X Does not apply

* VTR: VISUAL TESTING REPORT * PTR: PENETRANT TESTING REPORT * I/P: IN PROCESS

QUALITY CONTROL ENGINEER: SITE SUPERVISOR ENGINEER FROM CONTECON:


NAME: NAME: NAME:
SIGN: SIGN: SIGN:

DATE: DATE: DATE: