0322

You might also like

You are on page 1of 13
BR 2 #8 : 32 “a 8 = CHINA STATE CONSTRUCTION ENGINEERING CORP. Our Ref: CSCE/SIS/6.08/95/601 Principal Resident Engineer Principal Site Office Stonecutters Island STW Kowloon West Dear Sir Contract DC/93/15 - Stonecutters Island ST) Sedimentation Tanks - Civil Works. ised Meth: ment for T: Wall Date: 17 August 1995 GHA STATE CongTAUCTION ENGINEERING CORPORATION fpomans|Reco pat] 7g AGENT SUs-AGENT ENGINEER. ENGINEER. [SURVEY 7 'c_FOREMEN! ADA, Pa B00 ‘onstructi Further to our letter ref CSCE/SIS/6.08/95/504 dated 22 July 1995 and the revised detail of tank wall fillets, we enclose herewith a‘revised method statement for tank wall construction for your consideration Thank you for your attention. Yours sincerely For and on behalf of CSCEC et Nee eee CNIai Site Agent Encl ce: HO MrJ McKechnie (SRE) Mr L Fernando (RE) amd 29/F Chin Oversees Bung, 128, Henesey Road, Hong Kong Tel RS: 820 7888 Fox MBH : 865 6909 Tex RUF: €C000 CORD TX Cable PUERTO "787 Hong Korg 7400 LS Oo Luv Ln 7400 ‘oor i sole Pa Tala F 7409) 4.30 KE w7 An: Cat bt ‘ | 7573, a W7An 1 30125 7575 [2B FOS cobs loot an Fe © 7575 cal HONS | Jo! 2° ‘CHINA STATE CONSTRUCTION Sete JoNo, DCFBIS | Page No.2 | Rev ENGINEERING CORPORATION (CSCEC)| Revision [sutfix PE Date Deep Wane [este Ge NREL, ERNNORE RERINEENEAT oondogn eve ye Bo [ent] wa Foe WALL. . ‘d 4 z 2 g 4 ‘| wl ; ‘ 4 8 z e TIMBSe. weUuLo Twe PLYweea Bo4 Ls Job No DCTS NA STATE CONSTRUCTION AS CH ENGINEER! Dae inivals YC: Hp. | [20/6 “ ING CORPORATION (CSCEC} Web TYPICAL FORMWORK ARRANEEMENT Drawing No Fee TASUNCTION oF WALL et SS are CALCULATIONS | Jop No. DE FEIS a CHINA STATE CONSTRUCTION ENGINEERING CORPORATION (CSCEC)| Revision ‘suffix Date a a Gacies, Yob TYPICAL PATTERN OF PLYWOSO Draw eo/e| yc tofent | wd Bowens FoR, WALL Teamwicric Ee FAs yet ol Jet coor fee o No. ; 8 - = H id ee fee 2 ee & wo - Z ; 2 3 = € - - +4 : 8 d > | Z it a Sf Be a by g i we ie E ee 3 7 a a8 2 uS & FY 3 he a ‘| Zz 3 =H - 1 of 5 E i a 8 az o 2 3 8 A 5 g 5 eo a a P ol 4 = t M4 : 8 : By ' wit 9 b+ tk : 7 Re : cs a | a a bP — 4 | 3 SS ee s ae 4 2 é 2 es i Hee ~ g ; it 4 ; te ado oe CHINA STATE CONSTRUCTION ENGINEERING CORPORATION (CSCECI] Revision Suffix CALCULATIONS | Job No. Dc. 73/15 _| Page No. 5 | Beulsion ee Date Date S/is CH An Lenl| wt aan i : Sim PLYWGOD 50K 100 TIMBER T1E BOLT STEP /: ERECT FORMWRK TO THE KICKER OF WALL STEM AS SHOWN ON THE ABOVE SKETCH. STE PZ! CONCRETIVG TO THE ROUND Floor SLAB AVD KICKER) oF THE WALL STEM. STEP3? STRIppING FORMWORK TO THE KICKER OF WALL STEM Kls0e/ 6.0881 FF aia Ghacked Tob Drawing N rawing Wo, (7 OF TANK WALL ConsTRucTron Bee Cul lob No. CHINA STATE CONSTRUCTION eerreeeetr cere aoe levee JENGINEERING CORPORATION (CSCEC)) Revision ‘Suffix ou | Dae aa Greeks ee - raving No. PN GH Au | eme|_tb-¥ | METHOD STATEMENT OF TAYE WAKE consTRucTioN BS Wore BOLT ew ory ff} s0x.00 Timeer 8 0, 2 Be Pt PLY 00> ak arate: ay GK [ses] Ged fr of Sy ee STEp +: ERECT PoRMWORK To THE WALL STEM AS SHOWN ON THE WALL STEM. STEp 5: ConcRETING TO THE WALL STEM STEP 6: THEN, STRippivg FORMWORK TO THE WALL STEM CHINA STATE CONSTRUCTION CALCULATIONS | Job No. DC 93/15" _|Poae No. Fig] Revision ENGINEERING CORPORATION (CSCEC)} Revision ‘Suffix eT Dae | Date Tails Checked Tob Cau ed Cited lene | ie [METHOD STATEMENT OF TAVE waLh CNSTRUTION 0x 100 TIMBER 19MM PLY WooD 7 ERECT FORMWORK AND FALSEWORK TO THE SOFFIT OF SLAB CTIO3) KKICKER OF THE WALL STEM. STEP: CONCRETING To THE SLAS (710-3) & KICKEI oF THE WALL STEM 19 STR Ippingy FORMWORKTO THE WALL KICkER s&s s[b8/frfo€l aoe ‘CALCULATIONS »" CHINA STATE CONSTRUCTION Job No. PS P3115 ENGINEERING CORPORATION (CSCEC)| Revision ‘Suffix Dae Dawe | Tai. | Check: “ : ~ ac Drawing No, ISI8 | Cth Aw ewe | [6h | METHOD STATEMENT OF TANK WALL COMCTRUTION Ss Tie BOLT fh BX 100 TIM, IPMta PLY WOOD : Sk sts bof fr] 2 [ «CHINA STATE CONSTRUCTION ENGINEERING CORPORATION (CSCEC) CALCULATIONS | JobNo. De / 73/15 Powe No. 7 | Revisio: Revision ‘suffix at Date Dawe 2eH initials Checked CH Aw lene let Yob TEpNCR, SEALS FOR THE EMBEDDES EMS Ane eax-o/TS Drawing No. PLANKS ADOTIONAL = Box 100 TIMBER Le = see: NAILS pa 7 | fe 4 L 5x joo TMSEe PLANK pee PLY Woop mn leon PLY Wes Sk/sts [6:08 [o46— e) »/228 Isishs 1m PLYwooD j—50x100 TIMBER a LASGE_ PoxOUT. spe slro-xeg “oN Bumed = aaayT Bel InanED MEY TAMPERE aor 80 ate xuyns worst |(93959) NOLLWHOdUOO ONINSANIONA| 9 SBLVLS VNIH! sownay | Of ‘onsbea] S//eb9¢ onaor| — snolLwIno Wo NOLLONYISNOD SLWLS YNIH CALCULATIONS | JobNo. DCFSis | Page No. // | Revisor ‘eu NA STATE CONSTRUCTION ENGINEERING CORPORATION (CSCEC)| Revision | Suffix Date Cracked Jeb CSTBLS OF TE WES INSTALLATION Drawing No. ent | lek FOR FORMWORK..CE TANK WALLS ae AL.5M oe TANK WALLS fet TWIN 40.<75 U~ CHANNELS Ionm PLY wee — Soxrce Timer AGUUSTRSLE FRSTENER JOTASTEN THE TIE WIRES sK/s! $/ 608/048 EN oF jisic INA STATE CONSTRUCTION CALCULATIONS | Job No. OCFars [Page No. 2.2 | Rev EERING CORPORATION (CSCEC)| Revision [Suffix I Date Date Thiele Checked dob ARRANGEMENT FOR TEMPORARY Drawing No, 20 yo. 2 Fone Leek | Seppoet of WALL FecHNoR, 65MM TIE wiRES AT-~Fe Cle LLATION CETAILS REFER TO <—5O 1100 TIMBER FE wiees AVC TIMBER STRUTS FOR TEMPCRART suppoey CF YALL PERMWORS BEFORE FIXING STEEL REINER EVENT. cee —2Sx100 TIMSER PLANK FIXED «TPE WALL Formwerie ano STRUT TOGETHER BY [EEL NAILS - Soxico TM GER STRUT. sK[sis/6:08/9/004

You might also like