0 ratings0% found this document useful (0 votes) 56 views13 pages0322
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
BR 2 #8
:
32
“a 8
=
CHINA STATE CONSTRUCTION ENGINEERING CORP.
Our Ref: CSCE/SIS/6.08/95/601
Principal Resident Engineer
Principal Site Office
Stonecutters Island STW
Kowloon West
Dear Sir
Contract DC/93/15 - Stonecutters Island ST)
Sedimentation Tanks - Civil Works.
ised Meth: ment for T:
Wall
Date: 17 August 1995
GHA STATE CongTAUCTION
ENGINEERING CORPORATION
fpomans|Reco pat]
7g
AGENT
SUs-AGENT
ENGINEER.
ENGINEER.
[SURVEY
7
'c_FOREMEN!
ADA,
Pa
B00
‘onstructi
Further to our letter ref CSCE/SIS/6.08/95/504 dated 22 July 1995 and the revised
detail of tank wall fillets, we enclose herewith a‘revised method statement for tank
wall construction for your consideration
Thank you for your attention.
Yours sincerely
For and on behalf of CSCEC
et Nee eee
CNIai
Site Agent
Encl
ce: HO
MrJ McKechnie (SRE)
Mr L Fernando (RE)
amd
29/F Chin Oversees Bung, 128, Henesey Road, Hong Kong
Tel RS: 820 7888 Fox MBH : 865 6909 Tex RUF: €C000 CORD TX Cable
PUERTO
"787 Hong Korg7400
LS
Oo
Luv Ln
7400
‘oor
i
sole Pa Tala
F
7409)
4.30
KE w7 An:
Cat
bt
‘
|
7573,
a
W7An 1
30125
7575
[2B FOS cobs loot
an
Fe
©
7575cal HONS | Jo!
2° ‘CHINA STATE CONSTRUCTION Sete JoNo, DCFBIS | Page No.2 | Rev
ENGINEERING CORPORATION (CSCEC)| Revision [sutfix PE
Date
Deep Wane [este Ge NREL, ERNNORE RERINEENEAT oondogn
eve ye Bo [ent] wa Foe WALL. .
‘d 4
z 2 g
4 ‘|
wl ; ‘
4 8 z
e
TIMBSe. weUuLo
Twe PLYweea Bo4Ls
Job No DCTS
NA STATE CONSTRUCTION
AS CH
ENGINEER!
Dae
inivals
YC: Hp.
| [20/6
“
ING CORPORATION (CSCEC}
Web TYPICAL FORMWORK ARRANEEMENT Drawing No
Fee TASUNCTION oF WALL etSS are CALCULATIONS | Jop No. DE FEIS
a CHINA STATE CONSTRUCTION
ENGINEERING CORPORATION (CSCEC)| Revision ‘suffix
Date
a a Gacies, Yob TYPICAL PATTERN OF PLYWOSO Draw
eo/e| yc tofent | wd Bowens FoR, WALL Teamwicric
Ee FAs yet ol Jet coor fee o
No.
; 8
- =
H id
ee fee 2
ee &
wo -
Z
; 2
3 =
€ - - +4
: 8 d >
| Z
it a Sf Be a by
g i we
ie E ee
3 7 a a8 2
uS & FY
3 he a ‘| Zz
3 =H - 1 of
5 E i a 8
az o 2 3 8 A
5 g 5
eo a a P ol 4
= t M4
: 8 : By
' wit
9
b+ tk :
7 Re
: cs a
| a a
bP — 4
| 3 SS ee
s ae
4 2 é
2 es i Hee ~
g ; it
4 ; te
ado oeCHINA STATE CONSTRUCTION
ENGINEERING CORPORATION (CSCECI] Revision Suffix
CALCULATIONS | Job No. Dc. 73/15 _| Page No. 5 | Beulsion
ee
Date
Date
S/is CH An Lenl| wt
aan i
: Sim PLYWGOD
50K 100 TIMBER
T1E BOLT
STEP /: ERECT FORMWRK TO THE KICKER OF WALL STEM
AS SHOWN ON THE ABOVE SKETCH.
STE PZ! CONCRETIVG TO THE ROUND Floor SLAB AVD KICKER)
oF THE WALL STEM.
STEP3? STRIppING FORMWORK TO THE KICKER OF WALL STEM
Kls0e/ 6.0881 FF
aia Ghacked Tob Drawing N
rawing Wo,
(7 OF TANK WALL ConsTRucTronBee Cul lob No.
CHINA STATE CONSTRUCTION eerreeeetr cere aoe levee
JENGINEERING CORPORATION (CSCEC)) Revision ‘Suffix
ou |
Dae aa Greeks ee -
raving No.
PN GH Au | eme|_tb-¥ | METHOD STATEMENT OF TAYE WAKE consTRucTioN
BS Wore BOLT ew
ory ff} s0x.00 Timeer
8
0, 2 Be Pt PLY 00>
ak
arate:
ay
GK [ses] Ged fr of
Sy
ee
STEp +: ERECT PoRMWORK To THE WALL STEM AS SHOWN ON THE
WALL STEM.
STEp 5: ConcRETING TO THE WALL STEM
STEP 6: THEN, STRippivg FORMWORK TO THE WALL STEMCHINA STATE CONSTRUCTION CALCULATIONS | Job No. DC 93/15" _|Poae No. Fig] Revision
ENGINEERING CORPORATION (CSCEC)} Revision ‘Suffix eT
Dae |
Date Tails Checked Tob Cau
ed Cited lene | ie [METHOD STATEMENT OF TAVE waLh CNSTRUTION
0x 100 TIMBER
19MM PLY WooD
7 ERECT FORMWORK AND FALSEWORK TO THE SOFFIT
OF SLAB CTIO3) KKICKER OF THE WALL STEM.
STEP: CONCRETING To THE SLAS (710-3) & KICKEI
oF THE WALL STEM
19 STR Ippingy FORMWORKTO THE WALL KICkER
s&s s[b8/frfo€laoe ‘CALCULATIONS
»" CHINA STATE CONSTRUCTION Job No. PS P3115
ENGINEERING CORPORATION (CSCEC)| Revision ‘Suffix
Dae
Dawe | Tai. | Check:
“ : ~ ac Drawing No,
ISI8 | Cth Aw ewe | [6h | METHOD STATEMENT OF TANK WALL COMCTRUTION
Ss
Tie BOLT fh
BX 100 TIM,
IPMta PLY WOOD
: Sk sts bof fr] 2[ «CHINA STATE CONSTRUCTION
ENGINEERING CORPORATION (CSCEC)
CALCULATIONS | JobNo. De / 73/15
Powe No. 7 | Revisio:
Revision ‘suffix
at
Date
Dawe
2eH
initials Checked
CH Aw lene
let
Yob TEpNCR, SEALS FOR THE
EMBEDDES EMS Ane eax-o/TS
Drawing No.
PLANKS
ADOTIONAL =
Box 100 TIMBER
Le
=
see:
NAILS
pa
7
|
fe 4
L 5x joo TMSEe PLANK
pee PLY Woop
mn
leon PLY Wes
Sk/sts [6:08 [o46—e) »/228 Isishs
1m PLYwooD
j—50x100 TIMBER
a
LASGE_ PoxOUT.
spe
slro-xeg
“oN Bumed = aaayT Bel InanED MEY TAMPERE aor
80
ate xuyns worst |(93959) NOLLWHOdUOO ONINSANIONA|
9 SBLVLS VNIH!
sownay | Of ‘onsbea] S//eb9¢ onaor| — snolLwIno Wo NOLLONYISNOD SLWLS YNIHCALCULATIONS | JobNo. DCFSis | Page No. // | Revisor
‘eu NA STATE CONSTRUCTION
ENGINEERING CORPORATION (CSCEC)| Revision | Suffix
Date
Cracked Jeb CSTBLS OF TE WES INSTALLATION Drawing No.
ent | lek FOR FORMWORK..CE TANK WALLS
ae AL.5M oe
TANK WALLS fet
TWIN 40.<75 U~ CHANNELS
Ionm PLY wee —
Soxrce Timer
AGUUSTRSLE FRSTENER
JOTASTEN THE TIE WIRES
sK/s! $/ 608/048EN
oF jisic
INA STATE CONSTRUCTION CALCULATIONS | Job No. OCFars [Page No. 2.2 | Rev
EERING CORPORATION (CSCEC)| Revision [Suffix I
Date
Date
Thiele Checked dob ARRANGEMENT FOR TEMPORARY Drawing No,
20
yo. 2 Fone Leek | Seppoet of WALL FecHNoR,
65MM TIE wiRES AT-~Fe Cle
LLATION CETAILS REFER TO
<—5O 1100 TIMBER
FE wiees AVC TIMBER STRUTS FOR TEMPCRART suppoey CF
YALL PERMWORS BEFORE FIXING STEEL REINER EVENT.
cee —2Sx100 TIMSER PLANK FIXED
«TPE WALL Formwerie ano STRUT
TOGETHER BY [EEL NAILS -
Soxico TM GER STRUT.
sK[sis/6:08/9/004