CHINA STATE CONSTRUCTION ENGINEERING CORP.
Our Ref: CSCE/SIS/6.08/95/504 Date: 22 July 1995
ERSNEENG CORPORATION
Principal Resident Engineer oes eo
Principal Site Office TROT
Stonecutters Island STW Ear
Kowloon West SOE NCERT
et
aici
ae
: ST a
Dear Sir fe ronnie
sam
Contract DC/93/15 - Stonecutters Island STW fay +f
Sedimentation Tanks - Civil Works
Method Statement for Tank Wall Construction
Further to your letter (DC/93/15)/C25/200 (132) dated 11 July 1995 regarding the
method statement for tank wall construction, We enclose herewith the revised
method statement for tank wall construction incorporating with your comments in the
captioned letter for your consideration.
‘Thank you for your attention
Yours sincerely
For and on behalf of CSCEC
CN Lai
Site Agent
Enel
ce: HO
Mr J MeKechine (SRE)
MrL Fernando (RE)
CNL/SH/ft
Ste .
9/.. China Oweseas Bulg, 138, Hennessy Road. Hong Kong SORRENTO
To E822 7868 FeRAM! O66 5980 Telex MMR: 60580 COBDC HK Cable BAH! 7787 Hong Keng2)
3)
4)
5)
6)
)
8)
aoe
tement for struction of Tank W:
After concreting to the ground floor slab, prepare the CJ on the kicker of wall
stem,
Fabricate panels of wall formwork (about 6 m length) including plywood board,
steel channels and timber bearers.
Install one side of wall formwork and temporary support by tie wires and
timber struts as show on attached sketch no, SK/SIS/6,08/95/049,
Fixing steel reinforcement to the wall.
Box-out and install sleeve pipes to the formwork as per the sketch
SK/SIS/6,08/95/046 & 047, if required.
Install the other side of wail formwork and fixing into position by tie bolts and
tie wires as shown on sketch no. SK/SIS/6,08/95/033 and 048,
Construct working platform.
Conereting to the wall,
Details of wall formwork arrangement shown on sketch no. SK/SIS/6.08/95/032
10 035 and SK/SIS/6.08/95/046 to 049,peILA ev a
aE
7575,
L
eo
£
b—W7An:
¥ W7Aai
x
w7Ani-4|
40 fr 6.60
FAIR .NO.3
3429 3150_)
a
+ 5.60): TIONS | Job No. or
\ CHINA STATE CONSTRUCTION eee seb No. DCF>YS [Page No. [a | Rei
ENGINEERING CORPORATION (CSCEC)| Revision Suffix sae
Date
Date] taivias Checked Job TYPCAL. FORMWORE ARSANEEMENT Drawing No.
[eo Yo Ho FoR WALL.
Eo EQ -- EQ See ese
Ag Do Can > C400 > 400 )---- |
oe oe focee \ 75xa0 -cHAnyel
= Vib eco =
ites Al: mace [A = |
IN — 4 vez
g
TE Bot!
TE BOLT.
temum Purwea>
REPERNCTE eELow
; oa L
: mon S
i DT Somrco a] T
TIMBER
TS2do CHANNEL
TAM,
@ rope = is omee TO suppeRT The EOSE OF PYWodd | SoxIoo
4 - TIMBER WOULD RE CENTRALLY. PLACED . BETWEEN
Two PLYwees SoARoS
sklsis (6.08/45 /022,9
2 NS | Job No. evisior
" GHINA STATE CONSTRUCTION CALCULATIONS | iobNcPars |roene. Revi
ENGINEERING CORPORATION (CSCEC)| Revision Suffix I
Date
Bae as Tob HIPICAL_ FORORK AREANEESTEST praning Nos
H FoR TASUNCT.ON OF WALL
2ofe | Yo: Ho WITH [ooo CUAMEES
ES
oS
=
=
R
j
THE BLT
oe
A ne our
FiMEER WECGES
-4
] CHANNEL
qsxao cannes | ESB
DEFERENCE IN |
Fela t 50 «100
@ TIMBER,
THE Bob
i
skfsis/6-08/95/' Bd.cea
a gl Fate
a —--—— somps oF ptrweoo eoaeo 2 8 &
& 22
22
ea S48
' ‘ : i | sorpit! of sine | i i ai ay
; \ notes ! 2
_faaqerree |- - ' = = 4 (S| 88
3 [Te 32
: zg) >
; ) Ea
' : ' | ' | y ‘ 28
; : 1 : ‘ : 14-2 a8
g
a 8
z e| 2
‘ } i j——-- tf eI 1 faa) |e
. g 5
, = 2
Yo RRL |Op BAe SiG i" foyel &
= eee la] %
A ! a4 &
e | : ; re z
B . (/ CTYPICAL_PATIERM_OF pyywooo Boren. aa 9
3 -- FER WALL FORMNORI i v 4
| ge v
| all
2 ‘ :
rae 8 7
NB. JOINTS OF PLYWeDe BOARDS BP BE RUN VERTICALLY AND HORIZONTALLY =
EXcepp: FoR Fillet Te TAME WALLS THLE a 2
9 <
i i
Eh sru/6-08/95/025° 7 =
e z. 1 ‘CALCULATIONS Job No.
+ "|" CHINA STATE CONSTRUCTION pent cata
ENGINEERING CORPORATION (CSCEC)| fewsion [suttix |
Date [20/7
Baw iain Checked ye Drawing No.
2ofg | yc. Ho.
Tne Poywoct
- ri ri
scot | [Ly
. —————7$ 1]
WE =
F EOIN
= ete eet 2 |
tr og
® ~~ 3
S 3
ue
3 ne sact f
wi
2 TS tA
ak cane
& L 4
Fe
38 r 4
¥y
= Bou a
e 33 Hees
5 eer
|Bo.| kickerCALCULATIONS — | Job No.
Revision
+. sl] CHINA STATE CONSTRUCTION =
ENGINEERING CORPORATION (CSCEC)] ‘Revision Suttix aha
| Date
reece eee ee cee Yob FapAINORK. DETALS TOR THE Drawing No.
20/4 EMBEDCE TEMS AND Box-a/TS
A = =
ADATIONAL,
50% 100 TMBER
PLANES
Ly
NAILS,Th /Be9 Js ‘gh
50x j00 TIMBER,
y—19 «a Phywicod
/
CTion
NI
“Lro- 00%
Bumed = ayoy7 aad JNanaawcy >HOMNEEL gor
ay29uD)
eG
fe
aS
voisinoy
uoisinay
“On ata “2 a0r
SNOLLV1NOWO
(93989) NOLLVHOduOO ONIYAAN LONG}
ONYLSNOO SLWLS YNIHO7 CALCULATIONS | JobNo. DCFSIS
*» CHINA STATE CONSTRUCTION
ENGINEERING CORPORATION (CSCEC)) Revision Suffix
Date
Dawe] initats rocked Job CETLS OF TE WIRES INSTALLATION Drawing
7 NC to FOR FORMWORK CF TANK WALLS
2 WALL. FORMWORK NOT SHOWN, FOR CLARIFICATION & ie
aa Tank WALLS =
= Sem Tie wee
ae 5M ce
lou PLyveoo —H
Sox co MEER.
ADUUSTASLE FASTENER
JOTASTEN THE Tie WIRES
ETAL
Sk/s! $/608/048
jttt fyale Tor Jo fevsion
| ot} CHINA STATE CONSTRUCTION CALCULATIONS | Job No. C9315 «jean
‘ ENGINEERING CORPORATION (CSCEC)| Revision” | Suffix F
; Date
| Date | Tala Checked JOD ARANEEMENT FOR TEMPORARY Drawing No.
24 | Ye. ee