0321

You might also like

You are on page 1of 11
tS 7 @ 2 # = EF Ws CHINA STATE CONSTRUCTION ENGINEERING CORP. Our Ref: CSCE/SIS/6.08/95/504 Date: 22 July 1995 ERSNEENG CORPORATION Principal Resident Engineer oes eo Principal Site Office TROT Stonecutters Island STW Ear Kowloon West SOE NCERT et aici ae : ST a Dear Sir fe ronnie sam Contract DC/93/15 - Stonecutters Island STW fay +f Sedimentation Tanks - Civil Works Method Statement for Tank Wall Construction Further to your letter (DC/93/15)/C25/200 (132) dated 11 July 1995 regarding the method statement for tank wall construction, We enclose herewith the revised method statement for tank wall construction incorporating with your comments in the captioned letter for your consideration. ‘Thank you for your attention Yours sincerely For and on behalf of CSCEC CN Lai Site Agent Enel ce: HO Mr J MeKechine (SRE) MrL Fernando (RE) CNL/SH/ft Ste . 9/.. China Oweseas Bulg, 138, Hennessy Road. Hong Kong SORRENTO To E822 7868 FeRAM! O66 5980 Telex MMR: 60580 COBDC HK Cable BAH! 7787 Hong Keng 2) 3) 4) 5) 6) ) 8) aoe tement for struction of Tank W: After concreting to the ground floor slab, prepare the CJ on the kicker of wall stem, Fabricate panels of wall formwork (about 6 m length) including plywood board, steel channels and timber bearers. Install one side of wall formwork and temporary support by tie wires and timber struts as show on attached sketch no, SK/SIS/6,08/95/049, Fixing steel reinforcement to the wall. Box-out and install sleeve pipes to the formwork as per the sketch SK/SIS/6,08/95/046 & 047, if required. Install the other side of wail formwork and fixing into position by tie bolts and tie wires as shown on sketch no. SK/SIS/6,08/95/033 and 048, Construct working platform. Conereting to the wall, Details of wall formwork arrangement shown on sketch no. SK/SIS/6.08/95/032 10 035 and SK/SIS/6.08/95/046 to 049, peILA ev a aE 7575, L eo £ b—W7An: ¥ W7Aai x w7Ani-4| 40 fr 6.60 FAIR .NO.3 3429 3150_) a + 5.60) : TIONS | Job No. or \ CHINA STATE CONSTRUCTION eee seb No. DCF>YS [Page No. [a | Rei ENGINEERING CORPORATION (CSCEC)| Revision Suffix sae Date Date] taivias Checked Job TYPCAL. FORMWORE ARSANEEMENT Drawing No. [eo Yo Ho FoR WALL. Eo EQ -- EQ See ese Ag Do Can > C400 > 400 )---- | oe oe focee \ 75xa0 -cHAnyel = Vib eco = ites Al: mace [A = | IN — 4 vez g TE Bot! TE BOLT. temum Purwea> REPERNCTE eELow ; oa L : mon S i DT Somrco a] T TIMBER TS2do CHANNEL TAM, @ rope = is omee TO suppeRT The EOSE OF PYWodd | SoxIoo 4 - TIMBER WOULD RE CENTRALLY. PLACED . BETWEEN Two PLYwees SoARoS sklsis (6.08/45 /022, 9 2 NS | Job No. evisior " GHINA STATE CONSTRUCTION CALCULATIONS | iobNcPars |roene. Revi ENGINEERING CORPORATION (CSCEC)| Revision Suffix I Date Bae as Tob HIPICAL_ FORORK AREANEESTEST praning Nos H FoR TASUNCT.ON OF WALL 2ofe | Yo: Ho WITH [ooo CUAMEES ES oS = = R j THE BLT oe A ne our FiMEER WECGES -4 ] CHANNEL qsxao cannes | ESB DEFERENCE IN | Fela t 50 «100 @ TIMBER, THE Bob i skfsis/6-08/95/' Bd. cea a gl Fate a —--—— somps oF ptrweoo eoaeo 2 8 & & 22 22 ea S48 ' ‘ : i | sorpit! of sine | i i ai ay ; \ notes ! 2 _faaqerree |- - ' = = 4 (S| 88 3 [Te 32 : zg) > ; ) Ea ' : ' | ' | y ‘ 28 ; : 1 : ‘ : 14-2 a8 g a 8 z e| 2 ‘ } i j——-- tf eI 1 faa) |e . g 5 , = 2 Yo RRL |Op BAe SiG i" foyel & = eee la] % A ! a4 & e | : ; re z B . (/ CTYPICAL_PATIERM_OF pyywooo Boren. aa 9 3 -- FER WALL FORMNORI i v 4 | ge v | all 2 ‘ : rae 8 7 NB. JOINTS OF PLYWeDe BOARDS BP BE RUN VERTICALLY AND HORIZONTALLY = EXcepp: FoR Fillet Te TAME WALLS THLE a 2 9 < i i Eh sru/6-08/95/025° 7 = e z . 1 ‘CALCULATIONS Job No. + "|" CHINA STATE CONSTRUCTION pent cata ENGINEERING CORPORATION (CSCEC)| fewsion [suttix | Date [20/7 Baw iain Checked ye Drawing No. 2ofg | yc. Ho. Tne Poywoct - ri ri scot | [Ly . —————7$ 1] WE = F EOIN = ete eet 2 | tr og ® ~~ 3 S 3 ue 3 ne sact f wi 2 TS tA ak cane & L 4 Fe 38 r 4 ¥y = Bou a e 33 Hees 5 eer |Bo.| kicker CALCULATIONS — | Job No. Revision +. sl] CHINA STATE CONSTRUCTION = ENGINEERING CORPORATION (CSCEC)] ‘Revision Suttix aha | Date reece eee ee cee Yob FapAINORK. DETALS TOR THE Drawing No. 20/4 EMBEDCE TEMS AND Box-a/TS A = = ADATIONAL, 50% 100 TMBER PLANES Ly NAILS, Th /Be9 Js ‘gh 50x j00 TIMBER, y—19 «a Phywicod / CTion NI “Lro- 00% Bumed = ayoy7 aad JNanaawcy >HOMNEEL gor ay29uD) eG fe aS voisinoy uoisinay “On ata “2 a0r SNOLLV1NOWO (93989) NOLLVHOduOO ONIYAAN LONG} ONYLSNOO SLWLS YNIHO 7 CALCULATIONS | JobNo. DCFSIS *» CHINA STATE CONSTRUCTION ENGINEERING CORPORATION (CSCEC)) Revision Suffix Date Dawe] initats rocked Job CETLS OF TE WIRES INSTALLATION Drawing 7 NC to FOR FORMWORK CF TANK WALLS 2 WALL. FORMWORK NOT SHOWN, FOR CLARIFICATION & ie aa Tank WALLS = = Sem Tie wee ae 5M ce lou PLyveoo —H Sox co MEER. ADUUSTASLE FASTENER JOTASTEN THE Tie WIRES ETAL Sk/s! $/608/048 jttt fy ale Tor Jo fevsion | ot} CHINA STATE CONSTRUCTION CALCULATIONS | Job No. C9315 «jean ‘ ENGINEERING CORPORATION (CSCEC)| Revision” | Suffix F ; Date | Date | Tala Checked JOD ARANEEMENT FOR TEMPORARY Drawing No. 24 | Ye. ee

You might also like