TO: ‘inci eae a Pal cvizcoores a , INFRASTRUCTURE FOR © Boparene Engineer PENNY’S BAY DEVELOPMENT CONTRACT 1 CONTRACTOR'S SUBMISSION FORM Title of Submission: Method Statement for Works mn Area Date of Submission: 15" January 2002 Submi ion Ref. No, 'V/2000/09/CSF/000122/A ‘Specification Reference WA Drawing Reference Description of Contents 7203/1004B nd 91800/204/10128, 1 Method! Statement for works in Area 6D. Remarks Bistanalon Purpose of Submission: For Review [1 rsetatoration For Record Purposes C1 From, Gontractoy’s Project Menager fa tame Vis CANG Bey signature: hou (of, ke China State Construction Engineering (Hong Kong) Ltd. v\s i, L | WSCKCRUCRAIOM: €.c, Mr. Keith Tsang (MCAL) | Prepared by: CSCE China State Construction Engineering Corporation Infrastructure For Penny’s Bay Development, Contract | Total No. of Sheet Date 3s {sth January 2002 CONTENT 4. INTRODUCTION » STAGES OF WORKS. 2 ar Stage 1 2 22 Stage? 2 23 Stage 3 3 he Staged 3 3. WORKS DETAILS 3 Bt” Temporary Anew Resid 3 32 Slope Cutting as Filling Works. 3 Stabilization Work and Earth Bund 5 4. SAFETY MEASURES 5 5. PLANT DEPLOYED FOR WORKS 1 Sd Cutting, 6 52 Fitting. 6 6. APPENDIX 61 Layout plans nos. S- to Sof for stages of works. 62 ‘Temporary access road layout plan and printouts nos, AR-I to ARM 63 ‘Views of site area V-1 to V9, 6 6 6s Catalogue of Backhoes & Vibratory Roller (CV2000/08 Infrastructure for Penny's Bay Development ~ Comirict 1 Method Statement for Works in Areas 6D (Southeast of Existing CLP) 1._INTRODUCTION Major works activities within Area 6D and at southeast of existing CLP power station involve, 1.1. slope cutting and associated slope drainage works in Portion 1 1.2. stabilization works at existing quarry face in Portion 1, 1.3 filling works within Portions 1 and L4, and 1.4 filling works within Portions I and L10, 7.5 earth bund and associated works within Portions L10 and L11b. All as referred to Drawings nos. 91800/203/1004B and 91800/204/1012A. According to the Contract, different Portions of Areas will be made available at different times. It therefore follows that the aforementioned works activities will be commenced and proceeded in difference stages as described hereafter. 2. STAGES OF WORKS 2.7 Stage 1 (Enclosed layout plan S-1 refers) 2A temporary access road will be formed, starting from Portion L9 and running along existing chuin-Link fence of Portion W29 to the toe of existing slope where it will branch to two lanes, One will be extended uphill along crest of existing slope, while the other will be extended along lower mid-level of hillside These two branch-off8 will allow slope cutting works started from top of hill/slope and hard excavated materials stockpiled at toe of hill in following stages of works. Existing chain-link fence will be removed as thay are found to be in adverse condition, A new chain-link fence will be erected upon completion of forming aforementioned accesses, both uphill and along bw iy hillside. 2.2 Stage 2 (Enclosed layout plan S-2 refers) 2.2.1 Slope cutting and slope drainage work will be started and proceeded from the top of hill and down ta level of about +30mPD. Method Statement for Works in Areas 11 /60 (€V2006.00 Infrastructure for Penny's Bay Development ~Contract 1 22.2 Sofi excavaied materials will be delivered and used for landscape berm construction. 2.2.3 Hand excavated materials will be stockpiled near toe of slope/dowahill, along existing waterfront and at a level high enough to be away from tidal effect. 2.2.4 Stabilization works Le. installation of rock dowels and rock bolts, or wire mesh will be cartied out whenever/wherever access is available, and the adjacent slope cutting works reach certain leveis which allow forming such access being possible, 2.3, Sunge 3 (Enclosed layout plan S-3 refers) 231 ling works will commence upon possession of Portions L4 and W4, 2,32 Another temporary access road will be formed by filling with excavated materials in this stage for linking up the cutting area and the filling ares, which are being separated by Portion W29 2.3.3 Excavated materials from slope cutting will be used for filling wor 2.3.4 — Another access for stabilization work will also be formed for securing the progress of stabilization works. 2.4. Stage 4 (Enclosed layout plan $4 refers) New items of works for this stage will be filling works at Portion L10. Slope cutting will be proceeded downbill and to design toe level once possession of Portion L10 is possible. 2.4.3. Hard excavated materials from slope cutting works will be temporarily stockpiled in Portion L10. 24.4 — Earth bund and associated works as shown in drawing no. 91800/204/L012A will be also commenced in this stage. a._WORKS DETAILS 3.1 Temporary Access Road (Enclosed layout plan AR-1, print-outs AR-2 te 5 and sketch AR-6 refer) 3.1.1 Temporary access road uphill will be formed by cutting and minor filling with excavated materials gained on its way uphill, Width of this access road will be maintained for about 4.0m as practical as possible. Method Statement for Works in Areas 11 / 6D CV2000/00 Infrastructure for Penny's Bay Development Contract | 312 Temporary access road elong/round hillside will be formed hy filling and minoreutting. Filling will be done with band excavated gained on its \way and from uphill road cutting. Similar width will be maintained as aforementioned for uphill road. In order to prevent excavated materials from rolling down to waterfront, the access road will be formed with rocks as an underlay j,¢. road-base and fata significant distance/height away from waterfront. Particular attention will be paid to have a gentle verge for securing the stability against tidal effect 3.2. Slope Cutting 321 Cutting work will be commenced at top of hill in berm by berm immediately upon completion of forming access rond. Cutting work will be carried out in accordance with Sections shown in drawing no, 91900/203/1014C Setting out will be done prior to physical commencement of cutting works. Cutting will be done in general by backhoe, with completion of profile done manually with assistance from fight plant. Slope drainage works will be commenced upon completion of cutting for each berm. Temporary ditches or the like will be provided against washing out by surface runoff, particularly for slope having berm eut to design profile with permanent drainage work not yet completed. ‘Temporary sand trap(s} will be constructed by digging and surface runofT will be led to sand trap(s) before discharging to nearby existing watercourse. Vegetation removal and site clearance prior 10 physical cutting work will be limited to cutting zone with disturbance to its vieinity be kept to minimum, The temporary access roads will be used for transportation of materials for execution and completion of slope cutting and slope drainage works, Plastic sheets will be used for covering completed slope surface if necessary. Excavated materials will be used for landseape berm construction, 3.3 Filling Works 334 Filling works will be commenced once Portion Areas are made available and accessible. Matinod Statement for Works in Areas 11 / 6D (CV/2000/09 nfrastructare for Penny's Bay Development Contact 1 Temporary access road will be formed for linking up the cutting zone and 332 filling zone. 3.33 Excavated materials gained from slope cutting will also be used for filling works ie. as fill materials. 3.3.4 Excavated materials from other areas within this site including sandiill materials will also be used for filing works 3.3.8 Filling works will be commenced from ground level as found during possession of the areas. 3.3.6 Filling materials will be disposed by end tipping, spread and compact in layer by layer with thickness of each layer not more than 500mm, 3.3.7 Overfill ot edge fora distance of 600mm will be provided followed by trimming for completion of final profile. 3.3.8 Temporary measures such as ditches, plastic sheets and cement slurry will be provided whichever is appropriate as safeguard against surface being washed out by run-off. 3.3.9 Surface of euch fill layer will be formed to a smooth surface in order to prevent ponding 3.3.40 Compaction will be earied out to standard as stated in specification 34 Stabilization Work and Earth Bund 3.4.1 Similar approach for execution and completion of stabilization works and berm construction, as covered under method statement subrnissions referenced CV/2000/09/CSF/000094/A & CV/2000/09/CSF/D00096/A and CV/2000/09/CSF/000025/A respectively, will be applied in general. 3.4.2 Minor amendment may be necessary subjected to significant change in site condition and notification to Engineer will be made accordingly. 4, SAFETY MEASURES 4.1 Temporary access road will be formed to have a bund with height of 300mm approximate along the seaward side 42. Safety mesh will be erected along the seaward side of temporary access road. 4.2.1 Warning signal / sign / ribbon will be placed also along the seaward side of the temporary access road. 4.22 — Slope cutting works will be carried out at the seaward side of the hill in the first pace. Method Statement for Works in Aseas 11 / 6D i! .0lUl ee ee (CV/1000/00 Infrastructure for Penny's Bay Development — Conirect | 4.2.3. Slope cutting to landward side of hill will be started once cutting at seaward side reach a certain level {.c. with at least a 3 metres level difference between the landward side and the seaward side. 4.2.4 Contnoller/checker will be provided for safety supervision of work when cutting at landward side is in proceeding. 4.2.5 Large boulders will be placed along edge of temporary access road as a safety guide to vehicles. 4.2.6 Slope so formed and of temporary access road will be covered/sprayed with cement slurry. 5,_PLANT DEPLOYED FOR WORKS 51 Cutting o Backhoe x 3 nos. Dump Trucks x 9 nos Loader x 1 ho. Grader x Ino. 52 Filling . Backhoe x Anos. Dozer x 2nos. Dump Trucks x 9 nos, Loader x Ino. Vibratory Roller x 2 nos. 6, APPENDIX 6.1 Layout plans nos. S-1 to S-4 for stages of works. 6.2. Temporary access road layout plan and printouts nos. AR-I to AR-6. 6.3 Views of site area V-1 to V-9. 6.4 Catalogue of Backhoes & Vibratory Roller Method Simement for Works in Areas 1} /6D U 1 SE, mmm ‘neue a4 eh aua4 seyppny Suyseg syypuyy mai “IIR ii pany sypernng, Guyer, 401 aT2 wyve rey sea Bowl spa Kur Binysnea @ SOM veer ® paidspays Reaiei yorama py (37492 Biypaaroud uy spor Gusyna eis ’ 7 [- sews] = Sean o . \ EREE on anapal Molt eod wiortesag] Filling Works ty Access eee Tin toad a Access fath < _ Paty fm =) mS tS (a 301 ssa2v Kaiioduia, Guywao} 0}. tune pant 24 ab pion SUL uray All -poai 359770 Arosodwal. Guyana} ua} ym a ep uood styl, eH \— Euitiing Water frent Existing Ge of Slope/4tl LEGEND 4 VTS Cur sre 2 Teretany Access Rig ———— Fite Gere (voto vase) Foe Tenpoanry Access aap NO O04» 101 ate _ Guyna 2 e[pumaid Teack-Type Tractors ii cari viww 1a) em GP S440 an ts es faectcy rant St : aa xLpaT* Bin PAT mae na LA Skid Steer bon ar Loaders ——— ~ fais onan Tain ee ay ae comer) sia) eo 4 50 Wheel Dozers Wheel Loaders aM oo te tS me aa ies Ba wow yas Pr Wis“ AT me iis Sano Landfill De Toy A aa Compactors fon 34 Naam 7 eee ME Sosieall WL Won ou eb eu so Beiaal 13 or iol « 5 oe eee aes, sie Mis ata Vise ane r vit aan Sa) Vig ins a8 Ee ae Waste Handing Arrangements aie WHA is is z Baawia ti) ti si Soil, SOP Sorea WHA (70 12) Han a0) Compactors EF Sore MWHA 32) is 431) Sh SS bY — a waits esa i cute AVS Handlers parieng i Boat H Ta i ~ agata a Range Integrated Toelcarriers ist 7 iis Teviivy arse ofa ae Te RH DETR oT inVileh AL Im) Mus thaws Yo) re Baws DELME 126 ta fain) Al ome 1908 ME" en) $97 aaah 1S (0) iy wis “oe Front Shovels Fyne Yess saat as me 7 nat Wheeled Excavators Operas Py owe city i) ae WEA iho Wom Ti Tay We say ih i iis? Wheeled Material Handlers ‘Mes Aaah M ne ” i ie ae wis a) dia dana Shim ITAL thet none fuse Henig Phvts | WHR MHS fos cinta) SE UAE LCRinin Agricultural Tractors Row-Crop Wea So baaih ‘Kauckleboom Loader si esas rr Desi vgn Harvesters - Ts ian TS ise tii flare Hesse Challenger 73 ihe” Ger Ts i tat we Wat Chaleoge BE iB agin eo w Challenge SSE. 0 my ais HOA sn Sf Nila Cut-to-Length re Waa Sir Wal farrestes ‘im— Fiuae, Separsinn ——Wreet Hist Woot Rosary Sepacatioa Sibi a sym Mow oy 4 Bi ie Raw tia 50 8 si is usnase Cappo Rae TN OALL In iF Articulated Trucks at res ones aso a8 DaQIE I Ejoetoe vs Off Highway oks O*Nighway Tractors Fest ey 6 Wheel rig iat me Tair aw ss wi fA” HAE LT eat SIME Series th TV 244M) VS ins Coal Bowl? 5) 2) 18 Wee Ga TH ADIe WE 1 suis BPE Cael Ty ssivewt Utmakd OD ae UL A Bows is: Huser UES ‘Sana steer ng Towra Taw aT TE od 7 1S ss lay Se eae mi iss Tete 12 Sap 1a i ie Sieh HTH Tin aT xr ars aa Vibratory Drum Compactors Asphalt Paving Equipment Tse 1 3178 mw Piss ET seme is 1h Tard Tn os emt ital aa (ee wos S a ti iv wi Ve iW aan dtig es Windrow Elovarer Asphalt Drum P-mpactors — 2% Taare Sead = Wane ‘ina u rae a Hain aie a ain Errend A Mac 8 168 nie Encaed-8-Mat 10-208 a sai Road Reclaimers/ Soil Stabilizers oo Cold Planers 3126 Engines ‘aati Patralous 31268 Engines Mace aia . Higby ts ee 316 Engines taduet ial Myeae Petrol 3196 Engines Arata! Marie Porsoleury CATERPILLAR’ tapas atc030@) oan nies waka wen anne Cat C-10 Engines Oe Hlghazay Track Cat C-12 Engines n-Hugevray Trach Cat C-15 Engines Sight Trak i ——— Cat C-16 Engines 3600 Engines/Generator Sets HAMM Vibratory Compactor 2510-SD Operating weight 17 t - Working width 2.1m 7. oe ee Fee] stlenal equipment @ Infinitely variable hydrostatic allwhoo! drive. © Modorn single lever control, hydrostatic power steering. @ High compacting performance © Central oscillating articulated stearing (60° articulation anale). © 100% difterential lock, mechanically operated, @ Large working width: 2160 mm (82.7"). (tal compaction force: 490,000 N. ‘© Separately suspended operator stand. @ rect injection engine with © Ezsy to maintain and long service intervals. 118 kW (160 HP) DIN ~ performance 130 kW (177 KP) SAE — pertormance: © Optional equipment for special operations. Toshi Dee cording CECE Bese Bante alge whine can noo Kg (8c Spemtng-wuirt 00g 700 a wegnon amen (800g 0 - zea) Domes Tigress nr/ear Deus Det Sercke sat naEPEL I SG Sais. ‘ower raiag ONECTE TOAW/CO HE a 2 0 rom Power rang SAE 130 kA TT HP at 2.80 em feats ety BS 82S gu Soe gal) toe rotons are om — Ce Torres ave. ey vite, laneury sewer Harntaock 100%) sgn conta Be ‘eco spect vat seo: Or 1asumng-aenan _ ‘Seen thy ae Dir aeow eater eam ‘Pract iycicensc var om recy 28 He rane oie ren TO). ety 28. rial aed 38 rn Giramiaiae Beare Foner sm HST WSN ST eensien 2 Skettis cat Balas 7 Opening we Brew Seale ooe 2 Parang bee mostra) settee 0h whe ie Prati es 20171608 OR - — Becreaigain (Cosa wage Vay EAT Stnrdaciprene Separate suszandes uaatr anc etn Faas Gare sak SoSanIDD FOO "trumaet panna wis rape of ce mrrerta ang haus ane ee Uy ocanpect Paton pai ‘Sesh hing? hort aap? ar infin are rector tard owen esas, wre ame ha Siienareqninent Cemiar canis las ove, whceniad wor Font and ee voice fan Incrcuat miro Hentng mint. anon oruacten OPS) orga cee seta waco, ‘Sines anon ncqeto sures noua Teme “slag Depart: HAMM Waizentabrk GmbH. Erthalet.1-D-G806 Maine Germany Tet (8134) 871029. 4107-404 Fa 6131) 870647 Weasley cana, ‘Betory: HAMM Walzeriatvik GmbH “P.O. 30x 1769, D-BE83 Tischenwouth -Gecrnarty Tel (985) &0-0> Tx, 621249 - Pax (9631) 8020, REG 5(238¢0)) COSTOVOL/syley. FORM a > Bm CE) aI Cont. No. : Re (apmae Factories and Jodustrial Undertakings (Lifting appitances ani Lifting Gear)Regulations CERTIFICATE OF TEST AND THOROUGH EXAMINATION OF LIFTING APPLIANCES (EXCEPT CRANES, CRABS AND WINCHES) Foem apnaed byte Come for Labo fo te pp of repwiatan 33) 4 ofthe Focone! and cari Urine itn Aspnes ond Lifting Car Rolo TMRT RIOR (MMAR | MTT Sama comm - cone) Ze RMT FRAP IMAARTER IRS ( BRMARBR HOY EGE (=) am (OE) ARETE) Nine of owner and address of installation READ MEERA ‘Site Address: = Ma On Shan Dalits ote alicstons or Rapa equiv fae, 1 fir “None ac sate Desrpian of | Testicad spied | sume worng oad Witeaioete anctiag snlanc(iype and diingvichig mark | (annath ae CRRA IER EUR AREAL Soot ‘east om ik pe] ane ABER VIBRATION ROLLER aes sos “Mane” HAMM | 10SD In safe working order (> Serial No.: 2635576 Size: 2.15W x1.Sim dia FOE 200288 5 2 Expiry Dare: 2 May 2002 3 May 2001 ‘he appliances described ln this cenificete wasted and 1 herey comity cha on # A 5 GSR RAT eMMErCME EGET. thoroughly examined by ane in accordance withthe First Schedule and thatthe above partsulars we comect BLESS smSIRsE RE - ALG Signature of Registcred Profess Engineer, ER Re raw RD RPOISESS8 ‘Qualification ae \ MECHANICAL Discipline Bam) Pessonar firm by whom persoe conducting the test and cexarniration iv employed AR LANrSA RRO R eta be 3 May 2001 Date of seruifeae wage INDUSTRIAL SAFETY CO, Unit 01, 22/F, Kingsfield Centre, 18 Shell Street, North Point, Hong Kong, Fax: 23433132 Fel: 2797 9381 Any competent examines or competent person who delivers to an owner certificate or makes w report witch is to hie Imowledge fase ns to 2 material particular shall be guilty of en offence and shall be liable on conviction te a fire of 200,000 and to imprisonmem for 12 months, PAAWONMA SANG) A. MOVEET AERTS. SUNCREST. ME: EER. AE BWI} RAReR aac Lancet FoRMs wee... 308 Rie RAGE YES TRD a. * factories and industrial Undertakings igen —) ing Appliances. Lifting Gear) Regulations Cert.No.: ©.0570/0)/s/ey ton LIFTING APPLIANCES, bees CERTIFICATE OF RESULTS OF THOR EXAMINATIONS IN THE PRECEDING TWELVE MONTIIS Fem approve by the Comotsine fr Labour for de peposes of ‘retain 511 af he Factories and lacs Undertakings (Lien insist ond gre tom CASE T RRSE CTEM IRR Mee ng IRE a Pika ee Re . - SAAT CRRA CREE RR COE MEER) UNL HAAER | Ma On Shan. ) sez mea sis of repairs requlted or defects. ing tod, ee nl atte whether in sue verking onder etme Ate: SA ~ Re RTA MARAE RYN SES OAM y Wit 81 =F tones RD RE m @ 8) 3 May 200) AMM 25108D 2635576 2.1SW x1.S3m dia PF RAIIERELNOY : 2002 9% 5 2 Expiry Date : 2 May 2002 ‘he hove particulars are ese, RPOIS6SS8 eer fy 2 Tel cone 8 oF makes 9 16 MECHANICAL fe af $200,098 and to imprizen Por wich i 9 hs know eke face sto material pts sah be As Sorin Se ER eR, «aT er nhs, AH RDS: See fra HERA HAR Lt C

You might also like