You are on page 1of 3
Ty oe Bk CHINA STATE CONSTRUCTION ENGRG. CORP. 7 April 2000 2 Cin Os big "oreo Rn Hoe Sag Our Ref: CSCE/RTW/6.08/2000/0460 ae Maunsell Consultants Asia Ltd 8/F. Grand Contral Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, N, T. Hong Kong Attn, Mr. Lam Kiu Yu, Rom Dear Sir, Contract No. FL22/98 Main Drainage Channels for Fanling, Sheung Shui and Hinterland ing Works for Lower River Indus and River Beas ent for Construction of Retaining Wall No. Enclosed please find the method statement for construction of Retaining Wall No. 2 for vour reference and retention. Yours faithfully, For and on bebaif of CSCEC a Chin Site Agent IO-Cheac 4 Qe kK thane? Encl ce MCAL (wie) cso (wie) HO (w/o) .a# Method Statement for Construction ‘of Retaining Wall No. 2 A Object ‘The method statement includes the removal of protective shield installed underneath existing twin watermains, and construction of the Retaining Wall. B Plant List; @) Backhoe b) Concrete Pump ©) Mobile Crane @ 4) Crane Truck €) Vibrating Poker a ) Water Jet ) Hand-held Pneumatic or Electrical Hammer ry Sequence of Works 1) Construction of Retaining Wall i) Preparation of Formation | excavate to formation levels for open areas or trim to remove thin layer of soil debris for the section underneath the twin watermains by backhoe with present of banksman dig the trenches by hand or backhoe along the slurry wall to form key e section | Fill over-excavated area with granular material or blinding concrete _ pour blinding concrete after inspection. ii) Construction of Base Slab _ erect side forms after setting out. fax steel reinforcement for base slab and starter bars for wall stem. = shutter the kickers. ~ pour concrete by using concrete pump or skip with mobile crane for ‘open areas and concrete pump for the section underneath watermain after cleaning and inspection, gure the concrete by wetting the surface thoroughly and spraying Wt from time to time. = form proper construction joint on kicker by using water jet andior mechanical tools. _ remove formwork for kickers and base stab. . iii) Construction of Wall Stem - form working platform on both sides of a wall stem by using scaffold or bracing tubes. = erect internal formwork fix steel reinforcement = shutter external face of the wall as per ICE certified design and use plywood panels and steel reinforcement or use crane truck at the area with watermain across it crane truck or mobile crane for lifting = pour concrete by using concrete pump for the area underneath watermains or concrete pump or skip with mobile crane or crane truck for other area after cleaning and inspection, remove the formwork shutter after specified days, repeat the above procedure for the wall stem on the other side Removal of Protective Shield ~ remove the steel hangers and steel plates by using crane truck

You might also like