29, Chi Overs balig Reference : CSCB/FRL/98/504/249 139 Heaney ond, Hoe Kons eso as 2s roe Date 15 December 1998 bidedeichitil ‘The Engineer's Representative Binnie Black & Veatch Hong Kong Ltd. Junction J/O Ting Cheung Road / Tin Pak Road Tin Shui Wai Site Office New Territories Attn: Mr, Ho Pak Hoi Chief Resident Engineer Dear Sir, Contract No. YL 39/98 A Ba Tin Shui Wai Further Development Tin Ying/Hung Tin Road and Tin Ts2/Long Tin Road External Links ' M fate for Drivil eel H. Pile We would like to inform you that our driving steel H. pile sub-contractor is Yuen Chak Construction Lid. We are submit the following material and method statement of steel H. pile for your comments and approval 1) Welding rad. $-9016.G. 2) Welding procedure test report. 3) Welder certificate 4) Method statement for driving steel H. pile. 5) BSP Hydraulic hammer 357 technical data 6) Detail of loading testing platform and calibration report of Jack 1000 7. 7) Constiuction Noise Permit for carry out of percussive pile, 3 sets. Thank you for your attention - Yours faithfully, For and on behalf of CSCEC “EE K®. Cheung Project Manager Enel, cc. Head Office KCCMYT/jc Method Statement for Driving Steel H-Piles » 2a 3) 4) 5) 8) Setting out the point for each pile. Driving the Steel H-piles to the point of setting out until the required level by Hydraulic Hammer, Extract the piles by Vibration Hammer if the driven obstruction. encountered any underground Removal of encountered obstruction, backfill and compaction. Re-drive the piles to the required level by Hydraulic Hammer. Final set all driven piles by Drop Hammer. : fi. ae s-9016-G % Be reagent lek tna ts ms ay Talalaal ts hound hy ato Benue Sj elastt Diy the electrodes at 350-4000 = ‘dep back nap sathad oa Fre aa bane er of Inlitan eta. Beep ni sth a eile Preheat at 60-90 Bele ‘The tamperstute to be npelod plate thickness and Roel Ki @ flencs paan wrigp hevomer hcker Show acceptable level b sy arrordnner wth Wes phan aris erence malposion he impel MILNE Rnd jetta Gero i ype canta eompeten of nad saa (8) Teper feel] ‘aor [ous | 1.08 [o.011 [o.000 | 0.28 | 0.60 2 Type mechs prpaioe of wo metal ve ws | w twat ans meena] Gb | tna mi -208) e sein | ean | | ore av avalos and ewmmanvd covena(AO of DO? ¢ os Din, (mm) 26 32 4.0 5.0 6.0 umm | aso | 350 | 400 | ao | ato Teas oie a ne Te aie | som‘0 [ao-1e0 [ie=v70[ =e] ™ : Material. AR tener fla? HR. TER tle. FRorta Gok AA WELDING PROCEDURE TES] REPORT Aoport No: _961962NT80961 te Data: 811296 ‘sheet Lene = Lwietoves — sacatiaea hin) kt |Sterdned Wed: 88 4970: Part 1: 198) Welding Procedure in: LLICL/TKOIWPOAIG! ___Logatlonal fewt . 'oNewne:_Choung Men FakWiyhig Hon ChunglW¥2) H.KLO. Me.: Hozpeee zy £6797 WELDING PROCESS = «O.M.AWAA.C) [PARENT MATERIALS) jolt Tree: Single Bavel Butl Wold Jopceliicetion(e}: 89 4960, inde SSC (Gack Gouging) poking Povtlr(e: Horizontal Vorial(20) [Mato roupts) 69 4870: Part; 1981 Grows AZ [ree Picco Poon: Fld to Vestal lLimeneane of Tow pos: H-Beamt ($e x 208m x 240 TH ee eee eee os 2 WED PREPARATION (nm) BUN SEQUENGE AND COMPLETED WELD Fame Cultng and Mechanteal Grioding ty? WEL Deid ConpUMART ES” “TBize(ay em Bolseleo| so} Fier Materia AWS AB.SIASME SFAS.S, E7018. [Currani: Amp 160- fat0- |a10-|260-| | ie ae 190 | 210 | 220 | 220 Jidaka are Typo: Hyunuel Wokting ~ $-9010 a \Voltage: V jae |$0- [92- |90~ [Composition: Ax per Manufacturer Spec. Baking Treatment: Hod one hour at 950% af on Aeendeoin), Second side Tr Preheat Treaiment Min, 126°C |menveae Temporaivo: Max. 250°C, [AM Are Gauging and Olea Qrnding [EXTENT OF APPROVAL:- Rlomarks (it any) ange of Natorake Quon ALAR ' JAange of Thickneertcel: — 4.fenm + 50mm Joint Type: Glagle Baval Bult Weld (Beck ouging: [Ranga of Olmetee =. NIA Waldir Poaition ; Horlzontal - Verneal ee atess 0 erett ater eee so*4 WLOL AHA LIMAL AL cee ee wen i x WELDING PROCEDURE TEST REPORT RESULTS LOCATION OF HARONESS MEASUREMENT: (SKETCH) Vicker (H¥10) b_1okg ‘ndich ota "| Feet gague | —[L.. Temperate _| : Franevors to mett|Batcen of Noich Pewandcutr a Axle. sord 10mm x ito the surlace and at ine oro J2}180 Avorage: | tonimx 88mm feast woe fauswo [ADLITIONAL TESTS) NIA. - ae Ramvark : Tho tavt weid wae prepared, wakied and tested In accordance with BS 4870: Payt | 1981, Welding Procedure Test : PASS {Asoeeaed By : Pitta Poaltion; Supervisor = NOTA [Authorized By: Aatlatant Manager owe: Z- [1-47 NOT Waldiog EE apy ceae etre BESTE REET ZTENN-1998 945 YUEN CHEK CONSTRUCTION CO 2838 6275 P87 Lees Far East Technical Services ca gin 1a cHEONG NING STREET HAPPY VALLEY TONG KONG 708 207877: Ref. + FE/981206/waT. 06th November, 19g, Client Yuen Chak Construction Co,, Ltd. Bubject 1 Welder Qualification Cortificate. Date of Welding Inspection + 30th October, 1998 Date of Test 03rd November, 1998 This 18 to certify that 13 welders from the above mentioned company have undergone welder approval testing in ordance e with B.S. 4872 : Part 2 = 1982 with the following results t~ Le Welding process 7 ; Manual metal arc welding, AC Parent material ; B.S, 4360 grade 503. Thickness : 16,0 mm, steel plate. Joint type : 45° 45° single bevel butt weld with back gauging. Welding position : Horizontal-vetical. Test piece position 1 Fixed vertically. as Holdina_consuneb}a, Filler material (make & type) e KoBe steel B-52. specification t BiS, 639 1 1986 BS154B26(H). sizes : 94,0mm and #5. Oinin, Qualification Test Besulte . code Name of welder 1. Cheung, Kam tung Visual examination Destructive tes: a. Side bend tost b. Fracture test qa) ding proc + MMA, “AC. Material range TAL & AZ (C & C-Hn stood Thickness range + 4,8 mm to 32.0mm. Joint type 1 45° £5" single bevel, but weld with back ‘gauging. Welding position ? Flat and hordzontal. Consumables { agic and rutile covere electrode. Weld preparation (sketch) Root face 2intinm = —b dap 7 4p't! 3inmt2me Lt 6m 1.D. Card No. B822017 (A) : Good surface condition: No surface fracture. No defects. : ronack «The above test ali acceptable ~ Ranged. 27-NOU-1988 @9:45 YUEN CHAK CONSTRUCTION CO Far East Technical Services (GIR, 1A CHEONG MING STREET HAPPY VALLEY HONG KOND. Yet 267877; 06th November, 1998 i Client + Yuen Chak Construction Co., Lid. Bubject : Welder Qualification Certificate. 2. Poon, Kwok Chu 8314436 (8) Visual examination : Good surface conditions Destructive tests a, Side bend test 1 No surface fracture. e b. Fracture test 1 No defects. Remark : The above tests all acceptable - Passed, hen 3. Cheung, Kim bung §244490 (2) Vigual examination 1 Good surface conditions Destructive teste : a. Side 1 No surface fracture. b. Fracture * cost No defects, Remark : The above tests ali acceptable - Ragsed. 4, Tang, So Kit A296156 (6) Vieual examination : Good surface conditions Destructive tests a, side test 1 No surface fracture, b. Fracture test : No defects. Remark : The above tests all acceptable - Passed. 5. Lai, Fu Yip 4989368 (6) Visual examination Good surface conditions Destructive tests e@ a. Side test 1 No surface fracture. b. Fracture test : No defects. cy Remark ; The above tests al .acceptable - Passed. 6. Lam, Pui Ho 4860283 (3) Visual examination : Good surface conditions Destructive tests a. Side test b. Fracture test Remark : The above tests all acceptabl : No surface fracture: No defects. 2. Sin, King Keung 038472 (4) Visual examination 1 Good surface conditions Destructive tests a, Bide test 1 No surface fracture. b. Fracture test 1 No defects. Remark : The above tests all acceptable ~ Papsed, 8. Yeung, Choi Yau 485556 (1) Vieval examination : Good surface conditions Destructive tests a. Side No surface fracture. b. Fractur : No defects. Remark : The above tests all acceptable - Passed. (2) -P7-NOU-1998 a9t46 ‘YUEN CHAK CONSTRUCTION cc 2a38 6275 B63 Far East Technical Services BR GIf., TA CHEONG MIG STREET HAPPY VALLEY HONG KONG Tek 2675 77 T octn November, 1998 Client : Yuen Chak Construction Co., Ltd. Subject : Welder Qualification Certificate. 9. Ng, Wad Kong 8226317 (7) Visual examination : Good surface conditions Destructive tests Side test 1 No surface fracture, b. Fracture test 1 No defects. Remark ; The above tests ail acceptable ~ Passed, 5 20, Chan, Kwong Ming AT59187 (2) Visual examination 1 Good surface conditions Destructive tests a. Side test 1 No surface fracture. b, Fracture teat : No defects, Remark : The above tests all acceptable - Passed. 21. Wong, Kwai Choung B548645 (2) Visual examination + Good surface conditions. Destructive teste a. Side test : No surface fracture, t : No defects. The above tests all acceptable ~ Pagged, The statement in this certificate are correct. The test weld wa Prepared, welded and tested in accordance with the requirements o B.S. 4872 : Part 1: 1982. Rxpiring date of certificate : 03rd may, 1999. Sun +K. Che. Manager (3) Method Statement for Driving Steel H-Piles ) 2» 3) 4) 5) 8) Setting out the point for each pile. Driving the Stee! H-ples to the point of setting out until the required level by Hydraulic Hammer Extract the piles by Vibration Hammer if the driven pile encountered any underground obstruction Removal of encountered obstruction, backfill and compaction Re-drive the piles to the requited level by Hydraulic Hanumer. Final set all driven piles by Drop Hammer. BSP HYDRAULIC HAMMER 357> g have always set new standards [nt pile Since thelr Inception BSP Hydraulle Hammer: installation, The 357 Mk 5 serles now Incorporates 5, 7, 9 ‘and 11 tonne ram weights. PT ‘ e« standard in all BSP Hydraulic a aS ee Mk 5 SERIES ABOVE: HX dog 26-NV-1988 15443 ECONOMY OF OPERATION: Tu ensure lower canacity requirements ronan cost the paced hy Oe ayatem, from « comparatively small hydraulic PERFORMANCE MONITORED: With the increasing di the operation of quality assurance systems, the optional BSP Energy Menivur fea worthwhile addition. It produces an instant and dieget read-out of performanes. aud this information may be stored for eventual down loading to 4 PC. POWER SOURCE: BSP offers a Hydropack + qucteus of every BSP Hydraulic Hammer, This high efficiency is achieved by the actustor design which allows the hammer drop weight to fall under effece of gravity with virtually no sesistance from the hydraulic circuit. “The simplicley of design of the eetuator enhances the operating efficiency, baving few moving parts, and with all hydraulic components closely coupled to the lifting cylinder. These features Hammers, providing the contractor with a high outpet performance together with above average fuel efficiency from the power source [EAR LEFT: M5 ene sperated, delving 390380 Betas, eaten ’ CENTRE: crave warded ity gee set omar pies #93 6, Ur Sovnsonessn 7c, 300 irom asing ne, usa. BELOW: HAY with sort Teclonre diving Larsen 6 Mpa crane scene ule actuator Mow rate ENVIRONMENTAL RESPONSIBILITY: Aethe driving force of BSP hammers ts hydraulic, there are no hammer exhaust ‘coinsions, and by optimising the impact velaciny 3 reduction in noise output eam be ver source. Jemand feom piling comteactart for hiained. QUALITY ASSURED: BSI has thorough and cxacting standards and all products facrured to the highest quality and apecifiention Tus 1988 BSS7S0 wat olvained for quality asaurance, and now SP conforms to the Ioceat internationally rn external poser source isto revised 1S itiey and the etandsed. power source providing hydraulic flow and presmice compatible to the hammer output Altcenativel be used, BSP can advise on wul zenou-1998 13844 YUEN Cho LORD IRLL PoWER SOURCE ~ DIESEL POWERED ‘OPEN CIRCUIT’ HYDRAULIC HIYDROPACK with aurhacharged diese! ‘engine, and ent axis punsp, is edivated to the oe BSD 987 Mle § Hammers. “the engine snanagement systebs on the i qontol panels allows the hammer to be HIyOROPACK - NH3S7 Mk 5 SERIES t ‘operated in manual morte, ENGINE IYPE PERKINS Jone! | HYDRAYLIC OF Yann capactty 300 He qe ucine rower 102 2W Filtration is provided by a tank sean ie | ouensions: + tnounted filter with rentor providing e Tenant eats engin the event of blockage ne annius wwinnn 1300 en : ecesiine 00 br x OSes sansamune FLOW 195 an netour 2140 ne radiator fan, and hydraulic oil PetHaN f ‘WeIgit! DRY 2280 ka perature contol by a tacit 70 me wren rut, 774045 independent air blac cooler. “The bate and frame are of welded construction. Lockable doors, lined with sound dampening inaterial, give security aid service ances, ‘The conteol panel is and at one eu pack. pe of the za-nov-igsa 13444 YUEN Chis, CONSTRUCT ACN ww HHSHD HH7HD-HHQHD —-HHILHD 11000 1670 rasa 1e a8 vase 100 wn 1837 07 eer er 90 100 1100 2700 DIMENSIONS: HH357 Mk 5 (GRANE SUSPENDED LEGS AND LEaben ovenarion INSERTS FOR SHEET PILING NELMET AND BAGKGUIDES — 6 ia | LERCTH OF MAMMIER WITH LECS AND INSERTS (12) Hl 4 LENGTH OF WAIMMER WITH HELMET (0.2) ax PILE 813 | DIA ae edeb ss a : 2e-nounigse 13:45 YUEN ChAR CLD IRA batt oe ne . FOUNDATION TECHNIQUES LIMITED Speclalit In Testing , Monitoring, Instrumentation & Caltoration” 03 Shai Hing Centre, 13 Sheung ‘Yuet Road, Kowloon Bay Tel.: 2758 4861 Fax; 2758 8962 CALIBRATION REPORT RefNo: 811749-37 Paget of 2 Client + ‘Yuen Chak Construction Co. Lic. L Jack i ‘Serial No. 113663 : Capacity 1000 Tonnes t Presure cauce : Serial No; + 028108 ' ; Range : 0-600 kglon* Calibration Instruments. : strain Gauge System Traceable to Recognised National Standards: i Granted by NAMAS, Cert. No. 46147, * ke Calibration Conditions: ‘Temperature 27 °C, Relative Humidity 76% i Basis of Calibration z To calibrate at the above conditions using traceable calibrated equipment Calibration Date t November 17, 1998 Regul Pressure Gauge Strain Gauge System Reading (Tenne) Reding Qxgler) Test Fea 2 Toot 5 Ayerage. i ee eee re tere o a 7 o . 100. 198 197 il 798.0 1 200 396. 3o7 ‘400 7 300, 5 594 596. 595.0 400 B00 798 799.0 i 480, 393. 985 994 994.0 x salibrated By : Certified By ¢ Name +: K.M. Chow Name 2 WeG.Yue 8 %. Position: Principal Technician Position fl jetations er Foundation Techniques “This report shall not be reproduced other than in Fl ‘except with prior written appr ‘ignoture : dip Signature k Ww pat No, 81174037 -@ eo Page 2 of 2° Calibration of Hydraulic System : 3 6 Jockos 206) peau Gnge acta h 1200 + 7 = = 1000 é o 2 eE o > § = 300 g a 3 ; « . § 600 ‘ ao > Q & 400 s s o 200 a : 5 ; 0 100 200 300 400 500 600 fester nito Pressure Gauge Reading (kg/em”) ~ 2 -@ = oe COT Le | ff 4 = CONCRETE BLOCK BO5RHSAzzBiginTBEAM fot, TTT t= ‘STSEL PLATE Arr ‘t900T GAUGES fee REFERENCE BEAM FOR GALES MATNTING a i oN _ ELEVATION I ‘ J 4 N— STEEL" H“PILE. ,___me___j__ ae __ FTE STIOLE [-— DRIVEN POST OR PILE. rroheee pret 966: rok 00, NOLLOMSESNUD RHO NEMA amet Hong Keng Government an URGRIEAE SRPE,.(4) in BP942INOGTWO08E-MBy vironmental Protection Depertwent i ‘3 Rene gaat. Local Control Office/Territory West (a) a 6 ‘7f,, Chinechem Tsuen Wen Plaza, SANUaR Fe, Noe 2411 9619 455-457 Caste Peak Road, TN iT. ment Fax NO: 2611 9149 — ni By Bepistered Post 10 Decenber, 1998 ‘Yuen Chak Construction Company Limited 384-388 Lockhart Road, Uf. Flat B, i Wanchal. Hong Kong e Dear Sirs, ( Notice of Issue of Construction Noise Permit Pursuant to Section 8 (6) of the Noii se Control Ordinance, the Lite to inform you that, under section 8 (6) of the Noi y has decided to issue a Constrvction Noise Permit in respect ‘of your application, ‘was received by the Authority for carrying out percussive piling Author “The Construction Noise Permit No. PP-TWO08E-98 is enclosed, “The conditions imposed in the above Consttuction Noise Permit are based on an assessment nade in accordance with the Technical Memorandum on Noise from Percussive Piling, e iryou are aggrieved by the decision ofthe Authority in respect fou" application, ‘ you may, porsuant to Section 18 of the Noise Control Ordinance, appeal to the Appeal Board T this notice in such manner and form prescribed under the within 21 days afler the service of Noise Control (Appeal Board) Regulations. ‘Yours faithfully, oo (CHAN Pin-lin, Louis) for Authority Encl Salina Serving the community for a better environment UR AER AOLSSRARLEF 1986 to 1998, : FORM 4 NOISE CONTROL ORDINANCE (Chapter 400) SECTION 89) CONSTRUCTION NOISE PERMIT FOR THE CARRYING OUT OF PERCUSSIVE PILING this congtvetton noi permits issued in accordance with section & of the Noise Control Ordinance. Pension ns gnatrucon nein Perr corcusaive pling, subject o te conditions set out below. The carrying out of percsse etter tha iv ccordance aay econalitigns may result in the permit being cancelled and in a prosecution for nee, CONDITIONS @_ | Construction site where percussive piling may be carried out: i ung Tin Road External Links, Tin Shul Wai, Yuen Long. N, Full stroct address: 7 ‘The piling zone, that Is, the area within ‘which percussive piling may take place js delineated on the attached plan which forms part of this construction nolsc permit. 2. Percussive piling method and pile type which may be used in the piling zone: Piling method and pile type No. of units iH Drop hammer driving ste! ple Two Hydaulie hammer (single acting) driving steet pile Two © 5. vatsiy orth construction uot permit: Date of commencement: ..L4 Paembsr 12 Days and hours: This permit expires oF ‘be displayed on the construction site at AL YSHISULEE ers 4. This construction nofse permit or copy thereof must ive piling covered. by.thls pesmi. valle entrances/enits For pubis is being carried out. 19s when pet wom 4 “ eae (98 400 8) 9 809) He : TE TRL 3 SOR aT OT ARERR RET REIN EA AN I 8 LE TS BERETA LE BART PERN » SER RCMB MRT LE + APPT OPS RE ARI» Tn A SEAS sett 7 e 1. TTR ORE ER OR © ; smn... SILEMPRABUAIAR RUBIES “FT RSV IRATE AR HT) ASTD + RF HE» 2. MESTARR RO TRA EMSC ST He De A + 7 ITA ERE MMA : Fase x : TORBEN FARE x : @ 3. aeneraamn: Asbo ee eRe IURIRRSRAUAIRN ... AA ROARS,» HARTER... zi PRATT HF LALOY HAIGH + TFA i sieht \ HM: 19...28,48 fo Envfconmental Protection Department 54VESIPEFR Local Coatrel Office/Tersitory West (FS) . Plan attached to Construction Hoise Permit No. + 08 BF FD BE Mit Bot recnwoosess ayene Bras (ANE) 7 Hong Keng Governme! f2(4) in EP942/NO6/TW0089-53, vironmental Protection Department Local Control Offise/Territory West 7/F., Chinachem Tsuen Wen Pisce, 2411 9619 1455-457 Castle Peak Roed, 2641 9149 Touen Wan, NT. SUES ‘escs7 it By Registered Post 10 Decenber, 1998 Chek Construction Company Limited 3§4-388 Lockhart Road, e Dear Sirs, Permit Pursuant dinance (Cep. 400) 8 (6) of the Noise Control Ordinance, the in respect of your application, for carrying out percussive piling Notice ef Issue of Construction Ni sect ty hes struction Noise Permi which wes received Authority on 20 November 1998, at Tin Ying Rood / Hung Tin Road Extzmal Links, Tin Shui The Construction Noise Permit No. PP-TW0089-98 is enclosed. L write to you that, bove Construction Noise Permit are based on an ‘The conditions imposed in rechnical Memorandum on Noise from Percussive assessment made in accordance with the Piling. e Ifyou are aggrieved by the decision of the Authority in respect of your application, you mey, pursuant to Section 18 of the Noise Control Ordinance, appeel to the Appe#l Board yethin 21 days afer the service of this notice in such manner and form preseribed under the Noise Contro! (Appeal Board) Regulations ‘Yours faithfully, (CHAN Pi for Authority Encl, ata” Serving the community for a better environment 180 o 188 RAR AANA EEL ARLE by FORM 4 z NOISE CONTROL ORDINANCE (Chapter 400) SECTION 80) CONSTRUCTION NOISE PERMIT FOR THE CARRYING QUT OF PERCUSSIVE PILING 7 PP-TW0089-98 CONSTRUCTION NOISE PERMIT NO. To: eaten Cs .ctlon Corapaay Li this conateution nol permit is isued i acenedance with eaton # ofthe NOs Contzol Ordinance, Perrassion is it is isuad fo, accu nee To the eanalsfons sat out below. Ths carT Ing OM ot Po ane ik a prosecution for the permit being nied foe the earring ost of pe fet Mies tush in accordance with the conditions may res fs Enolfence. CONDITIONS e 1, Construction site where percussive piling may be carried out: ‘Tit Road / Tin Shui Wal External Links, Yus _ may be used in the piling zone: 2. Persassive piling method and pile bre Piling raethod rad ple Ware Wo. of unite a Drop hammer driving stecl pile One One Hydraulic hammer (single acting) driving steel pile e@ < 3 3 \ Date of commencement Days and hours: ‘This permit expices on: 4, Thisconstruction nolse permitora copy thereof must be displayed onthe construction site site ontranceslexits : is being carried out eon) UR TAF + Be 4 waar (5400 8) 35809) nEAnrTe eRe SES sm RRR » EE SRIHNARATE LE + BRET pS ORT SSI ROR ES ALRTLS 2 EEL Fem ERIE MATS PORE BLE + RUSTERSAY ATSB AIER) + PTB.ASERIRES © 4 SRS PRE FFT AE ICT BUR ARABS AEE fhe Cig RTM RITES + PHONE AEF HEA EARP AGEL | UTIL FIRE EO RTRRSTA TRS LOE ERAT a EFT RA BS * BSS TTTANT : RGAE) aE SRSEBR HERERO & RATTLE penal Oo yA LRBOSETIN * AS Hg: 19.98.98 228 eR eS PES BU an RRR AE ATF IRA ROR RRL 8 RE fFFRa + EETRERELBS BaP TILT HRA ROLE TS A aah PT (8540051) 809) He ARG RTT oo ET EAREE, EME « BERATSGRBRTATS + CHR TAE 1 TREAT RERLALIA WOE PRUE + BE RUSH IPRAT MTR RRES weenie Reh + SANFL: 6 REPORT ATA? + 1a (BT PLR) CET ROR PU UT PRIISR SCAT HD DEG TRDUARR EA AE Reni x REECE) TM = ASABE CAR FD PRETORIA RRR: a FTA RCT A BURR SR AE ATL REE ATDRAY Fim: 19.98.0472 2 ii la g il Hi 1 PP+THO0S9-98 ioise Permit No. Xl Plan attached to Construction fy Bit it eP-TH0089-98 2 0 ST MM aT (4) i : Hong Kong Govern ZENE.) in EP242/NO6TW0090-S5, ronmental Protection Depart RAM Loca! Control Office/Terrltory West 8, 7/F., Chinschem Tsuen Wan Pl2z3, NOs 2411 9619 455-287 Castle Peak Road, ‘Fever Wan, NT. BERS, 26119149 By Rexistered Last ‘Yuen Chak Constriction Company Limited 384-388 Lockhart Road, 7F., Flat B, Wenehai, Hong Kong @ Dear Sirs, Notice of Issue of Construction Noise Permit Pursuait {e Section £ ©) of the Noise Contr ro} Ordinance (Cap. 400) Control Ordinance, the espact of your application, emive: 1828, fo: carrying out percussive piling ‘in Shui Wal, Yuet aN. Lwalte to inform fas decided to Permit No, PP-TW0099-98 is enclosed. ‘The Construction Noi: The conditions Imposed in the above Construction Noise Permit are based on an assessment made in accordance with the Technical Memorandum on Noise from Percussive Piling. oe Ifyou are aggrieved by the deciston of the Authority in respect of your application, : you may, pursuant to Section 18 of the Noise Control Ozdinanee, appeel to the Appeal Board Z within 21 days after the service of this notice in such manner end form prescribed under the Noise Control (Appeal Board) Regulations. 5 faithfully, , o (CHAN Pi 1, Louis) for Authority E Serving the community for 6 better environment SU PARDEE RPTL FORM 4 CONTROL ORDINANCE (Chapter 400) SECTION 89) nots! CONSTRUCTION NOISE PERMIT FOR THE CONSNING OUT OF PERCUSSIVE FILING : pp-rwot CONSTRUCTION NOISE PERMIT NO- Chak Construction Compeny Li va with section 8 of the Noite Control Ordinance, Permission» Fo in idisn Toeexriagout gf peuslye “Tals cangzustion neise rests is issued In accord 2 ee St being canceled abd ina prosecution for Tals cae pecans out of paces PINNE SHER genie Se than accordance wih fe eondtions may =F fan offence. CONDITIONS 1. Gonsruetion ste where percutive piling may be carieg out : Fullstectaderese THD Tse Rens plan ‘and pile type which may be used in the 2, Percussive pling mathod “Filing method ane pile WE No, of wntts « “ i si Drop hammer driving steel pile One One Hydraulic hammer (single ating) driving st! ple ‘Validity of the construction noise permit: 11 December 1998 { 3 5 Date f commencement: don theconstraction stat fi shicl, 14. Thisconstrustion aoe pemitora cops thereof must be dep i e pling covered by ths pet aieances/exits for public information at all tin rous ean = . re Pal zane 1P~THOOSO-98 a Plan attached to Construction Noise Permit io. : oe oH oan a Hong Kong Government 73 Environmental Protection Department 7FRYRMAL ER decal Control Odfice/Teeritory West alia

You might also like